2-21 Beach 80 Street
Queens, NY 11693BBL 4-16113-7501Map
Owner of record: Unavailable Owner
2-21 Beach 80 Street is a condominium built in 2005 in Queens, 11693. It has 66 residential units across 7 floors. The owner of record is Unavailable Owner. HPD has recorded 36 housing violations here, most recently on June 25, 2026. 18 of the 36 most recent violations are still open.
- HPD violations
- 36
- DOB violations
- 23
- ECB violations
- 8
- HPD complaints
- 61
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 36
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5j, 5th story, 1st apartment from north at east
Jun 25, 2026 · Apt 5J
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 1k, 1st story, 2nd apartment from north at east
Mar 11, 2026 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper at compactor closet, 5th story
Mar 11, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east at north located at apt 5j, 5th story, 1st apartment from north at east
Mar 11, 2026 · Apt 5J
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1k, 1st story, 2nd apartment from north at east
Mar 11, 2026 · Apt 1K
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1k, 1st story, 2nd apartment from north at east
Mar 11, 2026 · Apt 1K
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at west, north and south wall at bathtub in the bathroom located at apt 1k, 1st story, 2nd apartment from north at east
Mar 11, 2026 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1k, 1st story, 2nd apartment from north at east
Mar 11, 2026 · Apt 1K
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door labeled a leading to fire stairs at 1st story, section at north at public hall, 1st story, section at north
Mar 11, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at fire door labeled a leading to fire stairs at public hall, 1st story, section at north
Mar 11, 2026
Open — Invalid certification
Show 26 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at north located at apt 5j, 5th story, 1st apartment from north at east
Mar 11, 2026 · Apt 5J
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5j, 5th story, 1st apartment from north at east
Mar 11, 2026 · Apt 5J
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 5, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 5, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 5, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 5, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 5, 2022
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq ft at north wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor in the 3rd room from north located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the broken or defective baseboard radiator cover in the 3rd room from north located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section at south
Aug 26, 2021 · Apt 1B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq ft at north wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east , section at south original violation 14507005 issued 26-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 26, 2021 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 3g, 3rd story, apartment at north
May 20, 2015 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 3g, 3rd story, apartment at north
May 20, 2015 · Apt 3G
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... south wall in the bathroom located at apt 3g, 3rd story, apartment at north
May 20, 2015 · Apt 3G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom located at apt 3g, 3rd story, apartment at north
May 20, 2015 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at east located at apt 6j, 6th story
Jul 22, 2014 · Apt 6J
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tiles east wall in the bathroom located at apt 3g, 3rd story
May 29, 2014 · Apt 3G
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 7e, 7th story, 2nd apartment from south at west
Dec 19, 2011 · Apt 7E
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the 1st room from north at west located at apt 7e, 7th story, 2nd apartment from south at west
Dec 19, 2011 · Apt 7E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at center section east all sty at public hall
Jul 8, 2011
Open — Nov sent out
DOB building violations · 23
- Failure to correct swarmp conditions (facade) facade required
Failure to correct swarmp conditions
Aug 1, 2024
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9c unsafe report filed
Feb 20, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2020
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2017
Dob violation - active
Show 13 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2008
Dob violation - resolved
ECB violations · 8
- Class - 2
Responding to an incident reported by fdny that wind blow suspended scaffold out rigger out of place leaning it in danger of falling, investigation reveal that the scaffold was not inspected, the last working d
Mar 17, 2026 · Penalty $10,000
Active - Class - 1
Responding to an incident reported by fdny that wind blow suspended scaffold out rigger out of place leaning it in danger of falling, upon review of the department record it reveal that there were no notificati
Mar 17, 2026 · Penalty $25,000
Active - Class - 2
During inspection of a sidewalk shed in place, i observed that there were suspended scaffolds, pails, large quantity of black bags and other construction related material stored on top the shed, which by code a
Jun 16, 2025 · Penalty $10,000
Active - Class - 2
Bc 3303.10.1 tenant protection plan: during inspection of a building with suspended scaffold onsite and 2x4's blocking the doors to the terraces, i noticed that there was no tenant protection posted in the publ
Apr 19, 2024
Resolve - Class - 2
At time of inspection of a 7 story building i observed 2 suspended scaffolding in place, dob records revealed that there was no notification to the department prior to the install of the suspended scaffold. not
Apr 19, 2024 · Penalty $10,000
Active - Class - 2
Sidewalk shed. observe sidewalk shed in place not conform to dob sealed plans in departments records with sheds deck bridged&constructed on buildings existing canopies with shoring posts supporting canopy beams
Jan 8, 2024 · Penalty $6,250
Active - Class - 2
Failure to submit acceptable required cycle8c report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#813492.agg1:prior nov37018480y under28-302.4 sub
Oct 19, 2022 · Penalty $3,125
Active - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#813492.rem:submit acceptable required t
Feb 13, 2020 · Penalty $1,250
Active
Complaints
- Unsanitary condition
Mold
Jun 21, 2026 · Apt 1K
Close - Door/window
Door frame
Apr 7, 2026 · Apt 1K
Close - Plumbing
Toilet
Apr 7, 2026 · Apt 1K
Close - Safety
Fire escape
Apr 4, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 14, 2026 · Apt 1K
Close - Water leak
Slow leak
Oct 18, 2025 · Apt 5J
Close - Water leak
Heavy flow
Aug 10, 2024 · Apt 6J
Close - General
Bell/buzzer/intercom
Aug 10, 2024 · Apt 6J
Close - Water leak
Slow leak
May 3, 2024 · Apt 5J
Close - Water leak
Slow leak
May 3, 2024 · Apt 5J
Close
Show 40 more ↓
- Safety
Fire escape
Mar 16, 2024 · Apt BLDG
Close - Safety
Window guard broken/missing
Aug 24, 2022 · Apt 1H
Close - Unsanitary condition
Mold
Aug 9, 2021 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 31, 2018 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 2B
Close - Electric
Power outage
Sep 5, 2017 · Apt BLDG
Close - Water leak
Damp spot
Jan 1, 2017 · Apt 3A
Close - Water leak
Heavy flow
Jan 1, 2017 · Apt 3A
Close - Flooring/stairs
Floor
May 13, 2015 · Apt 3G
Close - Unsanitary condition
Mold
May 13, 2015 · Apt 3G
Close - Water leak
Damp spot
May 13, 2015 · Apt 3G
Close - Paint/plaster
Wall
Apr 6, 2015 · Apt 3G
Close - Water leak
Damp spot
Apr 6, 2015 · Apt 3G
Close - Water leak
Slow leak
Nov 7, 2014 · Apt 6C
Close - Water leak
Slow leak
Nov 7, 2014 · Apt 6C
Close - Water leak
Heavy flow
Oct 20, 2014 · Apt 6C
Close - Water leak
Slow leak
Jul 12, 2014 · Apt 6J
Close - Unsanitary condition
Mold
Jul 12, 2014 · Apt 6J
Close - Unsanitary condition
Mold
Jun 5, 2014 · Apt 3G
Close - Unsanitary condition
Mold
Apr 2, 2014 · Apt 3G
Close - General
Mold
Feb 15, 2012 · Apt 7E
Close - General
Mold
Feb 15, 2012 · Apt 7E
Close - General
Mold
Feb 15, 2012 · Apt 7E
Close - General
Mold
Feb 4, 2012 · Apt 7E
Close - General
Mold
Feb 4, 2012 · Apt 7E
Close - General
Mold
Feb 4, 2012 · Apt 7E
Close - Plumbing
Water-leaks
Jan 5, 2012 · Apt 7F
Close - Plumbing
Water-leaks
Jan 5, 2012 · Apt 7F
Close - Paint/plaster
Ceiling
Dec 11, 2011 · Apt 7E
Close - General
Mold
Dec 11, 2011 · Apt 7E
Close - Paint/plaster
Ceiling
Dec 11, 2011 · Apt 7E
Close - Heating
Heat related
Dec 7, 2011 · Apt 7E
Close - Electric
Lighting
Dec 7, 2011 · Apt 7E
Close - Plumbing
Water-leaks
Dec 7, 2011 · Apt 7E
Close - General
Floor
Dec 7, 2011 · Apt 7E
Close - Plumbing
Water-leaks
Dec 7, 2011 · Apt 7E
Close - Paint/plaster
Ceiling
Dec 7, 2011 · Apt 7E
Close - Heating
Heat related
Oct 14, 2011 · Apt 3J
Close - Plumbing
Water-leaks
Jun 9, 2010 · Apt 7F
Close - Plumbing
Water-leaks
Mar 30, 2010 · Apt 5G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 2005
- Floors
- 7
- Residential units
- 66
- Building area
- 57,356 ft²
- Lot area
- 54,984 ft²
- Zoning
- R6
- Community board
- 414
- Council district
- 31
- Block / lot
- 16113 / 7501
- Assessed value
- $5,701,943
- Landmark / historic district
- No
HPD registration #427092, last renewed Sep 8, 2025.
Questions about 2-21 Beach 80 Street
Who owns 2-21 Beach 80 Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 2-21 Beach 80 Street have violations?
Yes. NYC HPD has recorded 36 housing violations at this property.
Is 2-21 Beach 80 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2-21 Beach 80 Street built?
City records list 2005 as the year it was built.
How many apartments are in 2-21 Beach 80 Street?
It has 66 residential units and 97 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.