3-13 Beach 90 Street
Queens, NY 11693BBL 4-16124-0092Map
Owner of record: Swan, Kenneth L
3-13 Beach 90 Street is a walk-up apartment building built in 1920 in Queens, 11693. It has 3 residential units across 2.5 floors. The owner of record is Swan, Kenneth L. HPD has recorded 24 housing violations here, most recently on July 18, 2013. 24 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 4
- ECB violations
- 8
- HPD complaints
- 96
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Repair or replace the carbon monoxide detecting device(s). which is broken. in the entire apartment located at apt 2, 2nd story, section ''front,bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls and floor. in the bathroom located at apt 2, 2nd story, section ''front,bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub. in the bathroom located at apt 2, 2nd story, section ''front,bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 2, 2nd story, section ''front,bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling located at apt 2, 2nd story, section ''front.bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling front room located at apt 2, 2nd story, section ''front.bldg''
Jul 18, 2013 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective mailboxes at front areaway, section ''front.bldg''
Jul 18, 2013
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key lock on exterior metal security door entrance to building at front areaway, section ''front.bldg''
Jul 18, 2013
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story
Nov 12, 2005 · Apt 2F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2f, 2nd story
Nov 12, 2005 · Apt 2F
Open — Nov sent out
Show 14 more ↓
- BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from north at east
Nov 12, 2005 · Apt 2F
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections washbasin shower stall / watercloset in the entire apartment located at apt bsmt
Feb 2, 2005 · Apt BSMT
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove in the entire apartment located at apt bsmt
Feb 2, 2005 · Apt BSMT
Open — Nov sent out - BHazardous
Properly secure the loose sink in the kitchen located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective east window in the 1st room from north at east located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall under kitchen sink in the kitchen located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak over window lintel in the kitchen located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall under sink in the bathroom located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2r, 2nd story
Sep 22, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste line of kitchen sink , rear building in the kitchen located at apt 2r, 2nd story
Feb 10, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over entire apt .rear building in the entire apartment located at apt 2r, 2nd story
Feb 10, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches .rear building . in the entire apartment located at apt 2r, 2nd story
Feb 10, 2004 · Apt 2R
Open — Nov sent out - ANon-hazardous
Refit windows in the entire apartment located at apt 2r, 2nd story
Oct 2, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 2r, 2nd story
Oct 2, 2003 · Apt 2R
Open — Nov sent out
DOB building violations · 4
- Construction other optional
Boro commissioner has ordered work stopped for job# 421796097 due to applicant of record filing privileges suspended with the department
Jan 18, 2020
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 9, 2001
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 9, 2001
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Nov 24, 1995
Dob violation - dismissed
ECB violations · 8
- Non-hazardous
Failure to provide approved plans at premesis at time of inspection noted no approved plans on site for job#401462458 remedy stop all work provide approved plans
Jun 7, 2002 · Penalty $2,500
Resolve - Non-hazardous
Work w/o permit. work noted : entire building all floors removed partitions completly from floor to ceiling and built new framing for partiton all fixtures in kitchen, bathroom removed. remedy : stop all work.
Feb 7, 2002 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is back door is broken off hinges debris throughout first floor and side yard broken door allowing squattes and animals inside
Jul 19, 2001 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is door at rear of house busted and hanging of hindges.also piles of garbage piled at side of house.rem:repair or replace door maintain property.
May 23, 2001 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain.defect is front door hanging off broken window through all dwelling alluminum capping hanging off gutters + leaders broken + missing.rem:repair and or replace maintain bldg.
Jan 8, 2001 · Penalty $2,500
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legal number of families. building department records approve residence for occupancy by two families. residence now altered for occupancy by thre
Jan 11, 2000 · Penalty $11,500
Resolve - Hazardous
Occupancy contrary to building department records. illegal occupancy noted legal two family converted to an illegal three family. noted at basement level full walls erected creating bedroom, three piece bathro
Jan 11, 2000 · Penalty $2,500
Resolve - Hazardous
Work without a permit. work noted at basement level. full partiton walls erected creating bedroom, living area, three piece bathroom withshower and full kitchen with gas stove. obtain permit to maintain or
Jan 11, 2000 · Penalty $2,500
Resolve
Complaints
- Electric
Wiring
Dec 13, 2013 · Apt 1FL
Close - Heating
Heat related
Dec 13, 2013 · Apt NA
Close - General
Mold
Jul 15, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Jul 15, 2013 · Apt 2
Close - Paint/plaster
Ceiling
Jul 15, 2013 · Apt 2
Close - Plumbing
Water-leaks
Jul 15, 2013 · Apt 2
Close - General
Mold
Jul 15, 2013 · Apt 2
Close - Plumbing
Water-leaks
Jul 15, 2013 · Apt 2
Close - General
Mailbox
Jul 15, 2013 · Apt 2
Close - General
Doors
Jul 15, 2013 · Apt 2
Close
Show 40 more ↓
- Heating
Heat related
Oct 15, 2010 · Apt 1FL
Close - Plumbing
Water supply
Sep 30, 2010 · Apt 1FL
Close - Appliance
Electric/gas range
Sep 30, 2010 · Apt 1FL
Close - Nonconst
Rubbish
Sep 30, 2010 · Apt 1FL
Close - Paint/plaster
Wall
Sep 30, 2010 · Apt 1FL
Close - General
Doors
Sep 30, 2010 · Apt 1FL
Close - Electric
Lighting
Sep 30, 2010 · Apt 1FL
Close - Nonconst
Vermin
Sep 30, 2010 · Apt 1FL
Close - General
Mold
Sep 30, 2010 · Apt 1FL
Close - Electric
Electric-supply
Mar 30, 2009 · Apt 2
Close - Heating
Heat related
Oct 31, 2005 · Apt 2F
Close - General
Mold
Oct 31, 2005 · Apt 2F
Close - General
Floor
Oct 31, 2005 · Apt 2F
Close - General
Floor
Oct 31, 2005 · Apt 2F
Close - Electric
Lighting
Oct 31, 2005 · Apt 2F
Close - Plumbing
Water-leaks
Oct 31, 2005 · Apt 2F
Close - Nonconst
Illegal
Jan 26, 2005 · Apt 1F
Close - Paint/plaster
Ceiling
Jan 4, 2005 · Apt 1F
Close - Plumbing
Water-leaks
Jan 4, 2005 · Apt 1F
Close - General
Mold
Jan 4, 2005 · Apt 1F
Close - Plumbing
Water-leaks
Jan 4, 2005 · Apt 1F
Close - Heating
Heat related
Dec 6, 2004 · Apt 2F
Close - General
Mold
Sep 21, 2004 · Apt 2R
Close - Nonconst
Vermin
Sep 21, 2004 · Apt 2R
Close - General
Ceramic-tile
Aug 27, 2004 · Apt 2R
Close - Plumbing
Toilet
Aug 27, 2004 · Apt 2R
Close - Paint/plaster
Wall
Aug 27, 2004 · Apt 2R
Close - General
Mold
Aug 27, 2004 · Apt 2R
Close - Plumbing
Basin/sink
Aug 27, 2004 · Apt 2R
Close - Plumbing
Basin/sink
Aug 27, 2004 · Apt 2R
Close - Plumbing
Water-leaks
Aug 27, 2004 · Apt 2R
Close - General
Windows
Aug 27, 2004 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 2, 2004 · Apt 1F
Close - General
Windows
Aug 2, 2004 · Apt 1F
Close - Electric
Wiring
Aug 2, 2004 · Apt 1F
Close - Nonconst
Illegal
Apr 7, 2004 · Apt .
Close - Nonconst
Vermin
Feb 4, 2004 · Apt 2R
Close - Plumbing
Basin/sink
Jan 11, 2004 · Apt 2R
Close - Heating
Heat related
Jan 11, 2004 · Apt 2R
Close - Plumbing
Basin/sink
Jan 11, 2004 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 3
- Building area
- 1,825 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 32
- Block / lot
- 16124 / 92
- Assessed value
- $51,360
- Landmark / historic district
- No
HPD registration #916705, last renewed Sep 15, 2025.
Questions about 3-13 Beach 90 Street
Who owns 3-13 Beach 90 Street?
The owner of record in NYC Department of City Planning PLUTO data is Swan, Kenneth L.
Does 3-13 Beach 90 Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 3-13 Beach 90 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3-13 Beach 90 Street built?
City records list 1920 as the year it was built.
How many apartments are in 3-13 Beach 90 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.