3-15 Beach 90 Street
Queens, NY 11693BBL 4-16124-0091Map
Owner of record: Vanswan Holdings LLC
3-15 Beach 90 Street is a walk-up apartment building built in 1932 in Queens, 11693. It has 4 residential units across 2 floors. The owner of record is Vanswan Holdings LLC. HPD has recorded 55 housing violations here, most recently on September 15, 2010. 50 of the 50 most recent violations are still open.
- HPD violations
- 55
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 68
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 55
- BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 315a
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Replace with new the missing handrail 1 to2 sty in the private hallway located at apt 315a, 1st story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures stove in the kitchen located at apt 315a, 1st story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st bedroom from east at south located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the 1st bedroom from east at south located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... east wall in the 1st bedroom from east at south located at apt 315a
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the 1st bedroom 2 from east at south located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Replace with new the broken or defective flushometer handle toliet 2 sty in the bathroom located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in toliet bathroom 2 sty in the bathroom located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls ceilings thur out apt in the 1st bedroom from east at south located at apt 315a, 2nd story
Sep 15, 2010 · Apt 315A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly secure the loose the entire metal hand railing on stairs front entrance to front building at front areaway
Aug 7, 2008
Open — Nov sent out - BHazardous
Replace with new the broken or defective metal hand rail at building front at stoop
Jul 22, 2008
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective brick and mortar joints at tread and riser at front entrance stoop to building
Jul 22, 2008
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the bathroom located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the bathroom located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story
Aug 10, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Replace with new the missing hand-rail south at stoop
Jul 26, 2005
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story
Jul 26, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the bathroom located at apt 1a, 1st story
Jul 26, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the bathroom located at apt 1a, 1st story
Jun 20, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 1a, 1st story
Jun 20, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the bathroom located at apt 1a, 1st story
Jun 20, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Replace with new the missing hand rail at stairs at front areaway
Jun 20, 2005
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story
Jun 20, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story
Jun 20, 2005 · Apt 1A
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceiling in the kitchen located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling in the bathroom located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story, apartment at north
May 9, 2005 · Apt 1A
Open — Nov certified late - BHazardous
Replace with new the missing handrail at stairs in front areaway
Nov 9, 2004
Open — Nov certified late - BHazardous
Abate the nuisance consisting of coneald water leak at ceiling in the 1st room from east located at apt 1a, 1st story
Nov 9, 2004 · Apt 1A
Open — Nov certified late - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 1st story
Nov 9, 2004 · Apt 1A
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective cement and brick wall at right cheek of stair to bldg ( rear frame bldg ) at front areaway
Mar 31, 2003
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floor ( rear frame bldg ) in the kitchen located at apt 1, 1st story, apartment at west , section ''rear ''
Mar 31, 2003 · Apt 1
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling ( rear frame bldg ) in the foyer located at apt 1, 1st story, apartment at west , section ''rear ''
Mar 31, 2003 · Apt 1
Open — Invalid certification - ANon-hazardous
Properly repair the broken or defective closet door ( rear frame bldg ) in the 1st room from east located at apt 1, 1st story, section ''rear ''
Mar 31, 2003 · Apt 1
Open — Invalid certification - BHazardous
Abate the nuisance consisting of vermin roaches ( rear frame bldg ) in the entire apartment located at apt 1, 1st story, apartment at west , section ''rear ''
Mar 31, 2003 · Apt 1
Open — Nov certified late - BHazardous
Replace with new the broken or defective shower stall ( rear frame bldg ) in the bathroom located at apt 1, 1st story, apartment at west , section ''rear ''
Mar 31, 2003 · Apt 1
Open — Nov certified late - BHazardous
Replace with new the broken or defective window lower sash ( rear frame bldg ) in the 1st room from east located at apt 1, 1st story, section ''rear ''
Mar 31, 2003 · Apt 1
Open — Nov certified late - BHazardous
Properly repair the broken or defective sink in the kitchen located at apt 1, 1st story
Sep 24, 2002 · Apt 1
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department shower stall. in the bathroom located at apt 1, 1st story
Sep 24, 2002 · Apt 1
Open — Invalid certification - BHazardous
Properly repair the broken or defective window bottom sashes throught. in the entire apartment located at apt 1, 1st story
Sep 24, 2002 · Apt 1
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling&walls at foya. in the entrance located at apt 1, 1st story
Sep 24, 2002 · Apt 1
Open — Nov certified late
DOB building violations · 3
- Unsafe buildings none
Ub-unsafe buildings none
Aug 1, 2011
V%*-dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 1, 2011
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Jan 15, 2010
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to maintain building in code-compliant manner. noted: observed at time of inspection at the rear building (315a) the roof tar is loose & leaning in to rear yard of the adjacent building on exposure #3.
May 26, 2010 · Penalty $2,500
Resolve - Hazardous
Occupancy is contrary to that allowed by the c of o of building department records. first story apartment subdivided into two class "a" apartments. partitons erected with kitchen and bathroom facilities install
Aug 9, 1999
Resolve
Complaints
- Heating
Heat related
Jan 4, 2011 · Apt A
Close - Plumbing
Water supply
Jan 4, 2011 · Apt A
Close - General
Cooking gas
Nov 2, 2010 · Apt 315A
Close - Plumbing
Basin/sink
Nov 2, 2010 · Apt 315A
Close - Plumbing
Water-leaks
Nov 2, 2010 · Apt 315A
Close - General
Mold
Nov 2, 2010 · Apt 315A
Close - Paint/plaster
Ceiling
Nov 2, 2010 · Apt 315A
Close - Nonconst
Vermin
Sep 14, 2010 · Apt 315A
Close - Paint/plaster
Ceiling
Sep 14, 2010 · Apt 315A
Close - Construction
Roof
Sep 14, 2010 · Apt 315A
Close
Show 40 more ↓
- Plumbing
Water-leaks
Sep 14, 2010 · Apt 315A
Close - Plumbing
Toilet
Sep 14, 2010 · Apt 315A
Close - Plumbing
Basin/sink
Sep 14, 2010 · Apt 315A
Close - General
Mold
Sep 14, 2010 · Apt 315A
Close - General
Stairs
Sep 12, 2010 · Apt 315A
Close - General
Cooking gas
Sep 12, 2010 · Apt 315A
Close - Paint/plaster
Ceiling
Sep 12, 2010 · Apt 315A
Close - Paint/plaster
Ceiling
Sep 12, 2010 · Apt 315A
Close - Plumbing
Water-leaks
Sep 12, 2010 · Apt 315A
Close - General
Mold
Sep 12, 2010 · Apt 315A
Close - Plumbing
Water-leaks
Sep 12, 2010 · Apt 315A
Close - Plumbing
Toilet
Sep 12, 2010 · Apt 315A
Close - Plumbing
Toilet
Sep 12, 2010 · Apt 315A
Close - Plumbing
Basin/sink
Sep 12, 2010 · Apt 315A
Close - Appliance
Electric/gas range
Sep 12, 2010 · Apt 315A
Close - Electric
Electric-supply
Oct 15, 2009 · Apt 2
Close - General
Cooking gas
Oct 15, 2009 · Apt 2
Close - General
Mold
Nov 24, 2008 · Apt 1
Close - Plumbing
Water-leaks
Nov 24, 2008 · Apt 1
Close - Plumbing
Water supply
Jul 19, 2008 · Apt 1A
Close - General
Stairs
Jul 19, 2008 · Apt 1A
Close - Plumbing
Water-leaks
Jul 19, 2008 · Apt 1A
Close - Heating
Heat related
Jul 18, 2008 · Apt 1FL
Close - Heating
Heat related
Nov 13, 2007 · Apt 3
Close - Nonconst
Vermin
Aug 2, 2005 · Apt 1A
Close - General
Mold
Aug 2, 2005 · Apt 1A
Close - General
Mold
Jul 25, 2005 · Apt 1A
Close - Nonconst
Vermin
Jul 25, 2005 · Apt 1A
Close - General
Doors
Jul 25, 2005 · Apt 1A
Close - Nonconst
Vermin
Jun 16, 2005 · Apt 1A
Close - Nonconst
Vermin
Jun 16, 2005 · Apt 1A
Close - Plumbing
Toilet
Jun 16, 2005 · Apt 1A
Close - General
Mold
Jun 16, 2005 · Apt 1A
Close - Plumbing
Water-leaks
Jun 16, 2005 · Apt 1A
Close - Plumbing
Bathtub/shower
Jun 16, 2005 · Apt 1A
Close - Plumbing
Basin/sink
Jun 16, 2005 · Apt 1A
Close - Plumbing
Basin/sink
Jun 16, 2005 · Apt 1A
Close - Plumbing
Water-leaks
Dec 22, 2004 · Apt 1A
Close - Nonconst
Vermin
Dec 22, 2004 · Apt 1A
Close - Plumbing
Water-leaks
Dec 22, 2004 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1932
- Floors
- 2
- Residential units
- 4
- Building area
- 2,452 ft²
- Lot area
- 2,643 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 32
- Block / lot
- 16124 / 91
- Assessed value
- $158,400
- Landmark / historic district
- No
HPD registration #916404, last renewed Sep 13, 2025.
Questions about 3-15 Beach 90 Street
Who owns 3-15 Beach 90 Street?
The owner of record in NYC Department of City Planning PLUTO data is Vanswan Holdings LLC.
Does 3-15 Beach 90 Street have violations?
Yes. NYC HPD has recorded 55 housing violations at this property.
Is 3-15 Beach 90 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3-15 Beach 90 Street built?
City records list 1932 as the year it was built.
How many apartments are in 3-15 Beach 90 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.