roofy

162 Beach 24 Street

Queens, NY 11691BBL 4-15815-0071Map

Owner of record: Beach 25th Street Corp

162 Beach 24 Street is an elevator apartment building built in 2000 in Queens, 11691. It has 122 residential units across 6 floors. The owner of record is Beach 25th Street Corp. HPD has recorded 128 housing violations here, most recently on July 27, 2026. 2 of the 50 most recent violations are still open. City tax records listed 122 rent-stabilized apartments here in 2024.

HPD violations
128
DOB violations
18
ECB violations
79
HPD complaints
606

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jul 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
122
About 100% of the building's 122 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 128

  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door at south wall ''stair b'' at public hall stairs, 5th story

    Jul 27, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective heavy duty locking mechanism at door at vestibule , 1st story

    Jul 27, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 311, 3rd story, 2nd apartment from north at east

    Feb 22, 2026 · Apt 311

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at cellar story at boiler room

    Feb 22, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mechanical ventilation system in the bathroom located at apt 311, 3rd story, 2nd apartment from north at east

    Feb 22, 2026 · Apt 311

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 103, 1st story, 2nd apartment from south at west

    Jan 3, 2026 · Apt 103

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked. at boiler room

    Jan 3, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 619, 6th story, 7th apartment from south at west

    Nov 28, 2025 · Apt 619

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 2nd door to boiler room at public hall, 1st story

    Nov 28, 2025

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 504, 5th story, 1st apartment from south at west , section at south

    Jan 19, 2025 · Apt 504

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 504, 5th story, 1st apartment from south at west , section at south

    Jan 19, 2025 · Apt 504

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing floor mounted door stopper installed at fire door leading to boiler room at public hall, 1st story

    Jan 19, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the window reveal in the 1st room from north located at apt 312, 3rd story, 2nd apartment from north at east

    Sep 17, 2024 · Apt 312

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the inside base cabinet at sink. in the kitchen located at apt 405, 4th story, 3rd apartment from east at south

    Jun 27, 2024 · Apt 405

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation door frame at west eall in the bathroom located at apt 405, 4th story, 3rd apartment from east at south

    Jun 27, 2024 · Apt 405

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective intercom system from 1st story public hall to apt. in the entrance located at apt 405, 4th story, 3rd apartment from east at south

    Jun 27, 2024 · Apt 405

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the inside cabinet at washbasin. in the bathroom located at apt 405, 4th story, 3rd apartment from east at south

    Jun 27, 2024 · Apt 405

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the tile at east north and west wall in the bathroom located at apt 405, 4th story, 3rd apartment from east at south

    Jun 27, 2024 · Apt 405

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at east wall (apprx. 5 sq.ft) in the 3rd room from east located at apt 410, 4th story, 1st apartment from west at north

    May 2, 2024 · Apt 410

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective counterbalance at lower north window sash in the 2nd room from east located at apt 410, 4th story, 1st apartment from west at north

    May 2, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at east wall (apprx. 5 sq.ft) in the 3rd room from east located at apt 410, 4th story, 1st apartment from west at north original violation 16953653 issued 02-may-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 2, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood base cabinets at north wall in the kitchen located at apt 410, 4th story, 1st apartment from west at north

    May 2, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from east located at apt 410, 4th story, 1st apartment from west at north

    May 2, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Replace with new the missing door knob in the bathroom located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 1, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 1, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective. in the entire apartment located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 1, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood door in the bathroom located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 1, 2024 · Apt 410

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 1, 2024 · Apt 410

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 20sq ft of mold at east wall in the 1st room from north located at apt 312, 3rd story, 2nd apartment from north at east

    Jan 24, 2024 · Apt 312

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... approx 25q ft of mold at ceiling in the bathroom located at apt 312, 3rd story, 2nd apartment from north at east

    Jan 24, 2024 · Apt 312

    Open — Defect letter issued
  • A

    Properly repair or replace the broken or defective closet door at north in the foyer located at apt 312, 3rd story, 2nd apartment from north at east

    Jan 24, 2024 · Apt 312

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at window recess at east wall in the 1st room from north located at apt 312, 3rd story, 2nd apartment from north at east

    Jan 24, 2024 · Apt 312

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 417, 4th story, 2nd apartment from west at north , section ''north wing''

    Oct 23, 2023 · Apt 417

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 417, 4th story, 2nd apartment from west at north , section ''north wing''

    Oct 23, 2023 · Apt 417

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 417, 4th story

    Sep 21, 2023 · Apt 417

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 417, 4th story

    Sep 21, 2023 · Apt 417

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door at 1st public hall bulkhead from east, 6th story

    Sep 21, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective roof bulkhead door at fire stair ''a''

    Aug 11, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 517, 5th story, 2nd apartment from west at north

    Aug 11, 2023 · Apt 517

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approx 27 square feet in the bathroom located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 13, 2023 · Apt 410

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 13, 2023 · Apt 410

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 13, 2023 · Apt 410

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective flooring inside the washbasin cabinet in the bathroom located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 13, 2023 · Apt 410

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood door at base cabinet under the sink in the kitchen located at apt 410, 4th story, 1st apartment from west at north , section ''south''

    May 13, 2023 · Apt 410

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 315, 3rd story, 1st apartment from north at east

    Jul 8, 2022 · Apt 315

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 315, 3rd story, 1st apartment from north at east

    Jul 8, 2022 · Apt 315

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective base cabinets atnorth wall. in the kitchen located at apt 315, 3rd story, 1st apartment from north at east

    Jul 8, 2022 · Apt 315

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 315, 3rd story, 1st apartment from north at east

    Jul 8, 2022 · Apt 315

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 315, 3rd story, 1st apartment from north at east

    Jul 8, 2022 · Apt 315

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 407, 4th story, 1st apartment from east at south

    Jan 27, 2022 · Apt 407

    Closed — Violation dismissed

DOB building violations · 18

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 17, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2008

    Dob violation - resolved
Show 8 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed

ECB violations · 79

  • Class - 1

    Car re-leveling in both directions at all floors creating a tripping hazzard. . remedy: restore to service immediately and call the dob elevator division at (212) 393-2144 or email at [email protected] for

    Sep 26, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Boiler expansion tanks are defective-gas piolit is not hard pipe to the regulator; correct violation and submit the certificate of correction

    Jan 26, 2021

    Resolve
  • Class - 2

    7l10,16m7,16d6,29d6,100d6,29l10,44h8,44h11,45m7. 7l-repalce broken cover for electric eye; 16m-provide missing site guard on 4th fl; 16d-secure site guard on 2nd flr; 29d-secure greenfield for door operator

    Oct 23, 2018

    Resolve
  • Non-hazardous

    86u0517h1110h1151b14.

    Mar 24, 2008

    Resolve
  • Non-hazardous

    41r1159q0386u0574q0317h1110h1151b14. 41 r jumped fuse 41q contacts.

    Mar 24, 2008 · Penalty $180

    Resolve
  • Hazardous

    Operation of a crane in an unsafe manner(a) cribbing under the outrigger were not as the plans approved by the dept of buildings.

    May 8, 2000

    Resolve
  • Non-hazardous

    Work without a permit. having demolished building. failure to notify building dept. failure to provide contractors sign remedy: obtain a permit.

    Oct 9, 1997 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to adequately grade, drain, or otherwise protect site after demolition debris on site since 010589. remedy: remove debris grade site, and erect 8th solid floor.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain or otherwise protect site after demolition debris. remedy; remove debris, grade site, and erect 8th solidfence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain protect site after demolition debris on site since january 5, 1989 inadequate fence erected. remedy: remove debris grade site, and erect at 8th solid fence.

    May 3, 1989 · Penalty $500

    Resolve
Show 40 more ↓
  • Non-hazardous

    Failure to adequately grade, drainor otherwise protect site after demolition debris on site since january 5, 1989 inadequate fence erected. remedy: remove debris grade site, and erect and 8 ft. solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade, drain, or otherwise protect site after demolition debris on site since january 5, 1989 inadequate fence erected. remedy: remove debris grade site and erect and 8th solid floor.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain or otherwise protect site after demolition debris on site since 010589. inadequate fence erected. remedy; remove debris grade site and erect an 8ft. solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade, drain or otherwise protect site after demolition debris on site since 010589. remedy: remove debris, grade site and erect an 8th solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain or otherwise protect site after demolition debris on site since 010589 inadequate fence erected. remedy: remove debris, grade site, and erect and 8th solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Hazardous

    Failure to adequately grade drain or otherwise protect site after demolition debris on site since 010589 inadequate fence erected. remedy: remove debris grade site and erect an 8th solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain otherwise protect site after demolition debris on site since 010589 inadequately fence erected. remedy: remove debris.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade drain otherwise protect site after demolition debris on site since 010589. remedy: remove debris grade site.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade, drain or otherwise protect site after demolition inadequate fence erected. debris on site since 010589. remedy: remove debris grade site and erect an 8ft. solid fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to adequately grade, drain or otherwise protect site after demolition debris on site since 010589 inadequate fence erected. remedy: remove debris, grade site and erect an 8th fence.

    May 3, 1989 · Penalty $500

    Resolve
  • Hazardous

    Failure to carryout demolition operation in a safe and proper manner, safety zone not provided during mechanical demolition. fences not provided for safety zone during mechanical demolition.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner. using a bulldozer to demolish bldg. safety zone not provided during mechanical demolition.

    Dec 22, 1988 · Penalty $2,000

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify the dept. prior to the commencement of demo. work fairlue to provide contractors.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner. safety zone not provided during mechanical demolition. fences not provided for safety zone during mechanical demo.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Work without a permit.having demolished bldg. wihtout securing a permit. failure to notify the dept. prior to the commencement of demolition work. failrue to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner. safety zone not provided during mechaning demolition. fences not pro vided fee for safety zone during mechanical demolition.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify the dept. prior to the commencement of demolition work. failure to provide contractor sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify the dept. prior to the commencement of demol. work. failrue to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failrue to notify the dept. prior to the commencement of demo. work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to notify the dept. prior to the commencement of demolition work. failure to to provide contractor sign. failure to carryout demolition operation in a safe and proper manner.

    Dec 22, 1988 · Penalty $1,900

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify the dept. prior to the commencement of demo. work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner.safety zone not provided during mechanical demolition. fences not provided for safety zone during mechanical demolition.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Work without a permit. having demolished bldg. without securing a permit. failrue to notify the dept. prior to the commencement of demo. work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $825

    Resolve
  • Hazardous

    Safety zone not provided during mechanical demolition. fences not provided for safety zone during mechanical demolition.

    Dec 22, 1988 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to notify the dept. prior to the commencement of demolition work. failure to provide contractors sign. failure to carrout demition operations in a safe proper manner.

    Dec 22, 1988 · Penalty $1,900

    Resolve
  • Hazardous

    Failure to carryout demolition operation in a safe and proper manner, using bldg. to demolish bldg. safety zone not provided during mechanical demolition. fences not provided for safety zone during mechanical.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Work wihtout a permit having demolished bldg. without securing a permit. failure to nofify dept. prior to commencement of demolition. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to carryout demolition operation in a safe and proper manner, using a bull dozer to demolish bldg. safety zone not provided during mechanical demolition. fences not provided for safety zone duirng.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to carryout demolition operation in a safe and proper manner, safety zone not provided during mechanical demolition . fences not provided for safety zone during mechanical demolition.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify this dept. prior to the commencement at demolition work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Work without a permit having demolished bldg. without securing a permit. failure to notify the dept. prior to the commencement of demolition work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $525

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner. safety zone not provided during mechanical deaition. fences not provided for safety zone during mechancial demolition.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to notify this dept prior to the commencement of demolition work. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $400

    Resolve
  • Hazardous

    Fences not provided for safety zone during mechanical demolition. remedy: provide fences at adjacent property and also st.

    Dec 22, 1988 · Penalty $500

    Resolve
  • Hazardous

    Fences not provided for safety zone during mechanical demoltion . remedy: provide fences at adjoining property and also st.

    Dec 22, 1988 · Penalty $500

    Resolve
  • Hazardous

    Failure to notify the dept. prior to the commencement of demolition. failure to provide contractors sign.

    Dec 22, 1988 · Penalty $400

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner using a bulldozer to demolish bldg. safety zone not provided mechanical demolition.

    Dec 22, 1988 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to carry out demolition operation in a safe and proper manner using a bldg. zone to demotish. safety zone not provided during mechical demolition. fences not provided for safety zone during mechanical.

    Dec 22, 1988 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to notify the dept. prior to the commencement of demolition work. failure to provide contractor sign. remedy: provide contractors sign.

    Dec 22, 1988 · Penalty $400

    Resolve
  • Hazardous

    Fences not provided for safety zone during mechanical demolition. remedy: provide fences adjoining property and along street.

    Dec 22, 1988 · Penalty $500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2026 · Apt 311

    Close
  • General

    Ventilation system

    Feb 18, 2026 · Apt 311

    Close
  • Unsanitary condition

    Mold

    Feb 18, 2026 · Apt 311

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 208

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 401

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt 610

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 11, 2026 · Apt 501

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2026 · Apt 610

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2025 · Apt 103

    Close
  • Heat/hot water

    Apartment only

    Nov 27, 2025 · Apt 619

    Close
  • Appliance

    Electric/gas range

    Nov 26, 2025 · Apt 518

    Close
  • Heat/hot water

    Entire building

    Jun 28, 2025 · Apt 512

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2025 · Apt 307

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Door/frame

    Jun 25, 2024 · Apt 405

    Close
  • General

    Bell/buzzer/intercom

    Jun 25, 2024 · Apt 405

    Close
  • Paint/plaster

    Wall

    Jun 25, 2024 · Apt 405

    Close
  • Unsanitary condition

    Mold

    Jun 25, 2024 · Apt 405

    Close
  • Plumbing

    Bathtub/shower

    Jun 25, 2024 · Apt 405

    Close
  • Unsanitary condition

    Pests

    Apr 30, 2024 · Apt 410

    Close
  • Unsanitary condition

    Mold

    Apr 30, 2024 · Apt 410

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2024 · Apt 113

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2024 · Apt 505

    Close
  • Door/window

    Door

    Jan 11, 2024 · Apt 312

    Close
  • Water leak

    Heavy flow

    Jan 11, 2024 · Apt 312

    Close
  • Unsanitary condition

    Pests

    May 9, 2023 · Apt 410

    Close
  • Unsanitary condition

    Pests

    May 9, 2023 · Apt 410

    Close
  • Unsanitary condition

    Pests

    May 9, 2023 · Apt 410

    Close
  • General

    Cabinet

    May 9, 2023 · Apt 410

    Close
  • Unsanitary condition

    Mold

    May 9, 2023 · Apt 410

    Close
  • General

    Cabinet

    Feb 28, 2023 · Apt 410

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2022 · Apt 207

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2022 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Nov 29, 2022 · Apt 416

    Close
  • Unsanitary condition

    Pests

    Jul 6, 2022 · Apt 315

    Close
  • Unsanitary condition

    Pests

    Jul 6, 2022 · Apt 315

    Close
  • Unsanitary condition

    Sewage

    May 26, 2022 · Apt 407

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2022 · Apt 114

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2022 · Apt 407

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2022 · Apt 407

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2000
Floors
6
Residential units
122
Building area
94,032 ft²
Lot area
52,010 ft²
Zoning
R6
Community board
414
Council district
31
Block / lot
15815 / 71
Assessed value
$2,629,800
Landmark / historic district
No

HPD registration #425575, last renewed Aug 23, 2025.

Questions about 162 Beach 24 Street

Who owns 162 Beach 24 Street?

The owner of record in NYC Department of City Planning PLUTO data is Beach 25th Street Corp.

Does 162 Beach 24 Street have violations?

Yes. NYC HPD has recorded 128 housing violations at this property.

Is 162 Beach 24 Street rent stabilized?

NYC Department of Finance tax bills listed 122 rent-stabilized units here in 2024 (about 100% of its 122 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 162 Beach 24 Street built?

City records list 2000 as the year it was built.

How many apartments are in 162 Beach 24 Street?

It has 122 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.