84-09 155 Avenue
Queens, NY 11414BBL 4-11446-0001Map
Owner of record: Lindenwood Owners Corp
84-09 155 Avenue is an elevator apartment building built in 1964 in Queens, 11414. It has 173 residential units across 6 floors. The owner of record is Lindenwood Owners Corp. HPD has recorded 83 housing violations here, most recently on September 23, 2026. 10 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 83
- DOB violations
- 36
- ECB violations
- 19
- HPD complaints
- 254
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 83
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub in the 1st bathroom from north at east located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the 1st bathroom from north at east located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from north at east located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceremic floor tiles at shower stall. in the 1st bathroom from north at west located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover at all electrical outlets at east and north wall inside mail room at lobby entrance story at basement
Mar 25, 2026
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety cover at all electrical outlets at east and north wall at lobby entrance story at basement
Mar 25, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickdown door stopper installed in the entrance located at laundry room at public hall, 5th story
Mar 25, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at 1st fire door from public hall to service area entrance at basement
Nov 5, 2025
Closed — Violation closed
DOB building violations · 36
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2012
Dob violation - resolved
ECB violations · 19
- Class - 2
9j1,5d10,32h10. 9j1-floor stops off level; 5d10-safety edge falling off; 32h10-guides on car.
Jan 28, 2017
Resolve - Class - 2
08v01,70p16,40p16,07m07. 70p16-pit ladder; 40p16-provide means of access with key; 07m07-zone lock missing.
Apr 15, 2016
Resolve - Class - 2
99bb05,41t07:
Jun 11, 2012 · Penalty $250
Resolve - Class - 2
67x10. in car emergency phone inoperative.
Aug 29, 2011
Resolve - Class - 2
10m07.08v01.08v01 some fls car stops to much off level even for increased ac adjust
Jan 16, 2009
Resolve - Class - 1
"stop all work".sec.27-1012,3314.4.3.no record of daily inspection of supported scaffold erected under permit 3410133733 performed by authorized person at site.remedy:maintain daily inspection record on site.
Sep 12, 2008 · Penalty $1,600
Resolve - Class - 2
"stop all work".failure to provide approved plans at job site at time of inspection for supported scaffold erected under permit #410133733.located at exposure one & three.remedy:provide plans.
Sep 12, 2008 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents. observed outrigger beams not set up according to approved cd-5 sr08/1633 by department of buildings. remedy: conform to approved documents.
Aug 6, 2008 · Penalty $500
Resolve - Class - 2
Failed to notify department of building prior to installation of out rigger beams in connection w/suspended scaffold. remedy: notify the dept.
Aug 6, 2008 · Penalty $800
Resolve - Class - 2
Failure to provide approved plans at job site at time of inspection observed 60ft ht supported scaffold erected under permit #410133733,forman hailed to provide approved plans for inspection. remedy: provide pl
Aug 6, 2008 · Penalty $500
Resolve
Complaints
- Water leak
Heavy flow
Oct 29, 2026 · Apt 2C
Open - Paint/plaster
Ceiling
Oct 29, 2026 · Apt 2C
Open - Paint/plaster
Ceiling
Oct 29, 2026 · Apt 2C
Open - Flooring/stairs
Floor
Oct 29, 2026 · Apt 2C
Open - General
Cabinet
Oct 29, 2026 · Apt 2C
Open - Water leak
Slow leak
Oct 29, 2026 · Apt 2C
Open - Unsanitary condition
Mold
Oct 29, 2026 · Apt 2C
Open - Door/window
Window frame
Oct 14, 2026 · Apt 1K
Open - Unsanitary condition
Mold
Sep 17, 2026 · Apt 1L
Close - Paint/plaster
Ceiling
Sep 17, 2026 · Apt 1L
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 22, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Aug 10, 2026 | $349,000 | Coops - elevator apartments | — |
| Aug 4, 2026 | $345,000 | Coops - elevator apartments | — |
| Jul 27, 2026 | $165,000 | Coops - elevator apartments | — |
| Jun 11, 2026 | Non-market transfer | Coops - elevator apartments | — |
| Jun 10, 2026 | $145,000 | Coops - elevator apartments | — |
| Jun 9, 2026 | $168,000 | Coops - elevator apartments | — |
| May 18, 2026 | $165,000 | Coops - elevator apartments | — |
| Apr 27, 2026 | $150,000 | Coops - elevator apartments | — |
| Apr 21, 2026 | $200,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1964
- Floors
- 6
- Residential units
- 173
- Building area
- 158,600 ft²
- Lot area
- 108,257 ft²
- Zoning
- R5
- Community board
- 410
- Council district
- 32
- Block / lot
- 11446 / 1
- Assessed value
- $5,848,200
- Landmark / historic district
- No
HPD registration #420639, last renewed Sep 2, 2026.
Questions about 84-09 155 Avenue
Who owns 84-09 155 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Lindenwood Owners Corp.
Does 84-09 155 Avenue have violations?
Yes. NYC HPD has recorded 83 housing violations at this property.
Is 84-09 155 Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 4% of its 173 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 84-09 155 Avenue built?
City records list 1964 as the year it was built.
How many apartments are in 84-09 155 Avenue?
It has 173 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.