88-28 172 Street
Queens, NY 11432BBL 4-09827-0060Map
Owner of record: Talukdar, Fatema
88-28 172 Street is a two-family home built in 1920 in Queens, 11432. It has 2 residential units across 2 floors. The owner of record is Talukdar, Fatema. HPD has recorded 73 housing violations here, most recently on July 23, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 73
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 92
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- ANon-hazardous
Properly repair or replace the broken or defective gasket at refrigerator in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower wooden cabinet in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at closet in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ceiling lighting in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq sq ft at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jul 23, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front areaway
Jul 15, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
May 16, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Apr 1, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules , in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Apr 1, 2026 · Apt 1STFLO
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Apr 1, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1stfl , 1st story, 1st apartment from south at west original violation 18545285 issued 02-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 2, 2026 · Apt 1STFL
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective base cabinet at west wall in the kitchen located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective countertop at west wall in the kitchen located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at in the entire apartment located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures throughout in the entire apartment located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures throughout in the entire apartment located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 2nd room from east located at apt 1stfl , 1st story, 1st apartment from south at west
Jan 2, 2026 · Apt 1STFL
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2025
Open — Info nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - BHazardous
Replace with new the missing base cabinet shelves at west wall and at north wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective counter top at west wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and at north wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall and at north wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Jun 9, 2025 · Apt 1STFLO
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and at north wall in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west original violation 17974564 issued 09-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 9, 2025 · Apt 1STFLO
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 1stfl, 1st story, 1st apartment from south at west
Apr 21, 2025 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base floor inside base cabinet at sink in the kitchenette located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north and west wall at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit door in the entrance located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the foyer located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly secure the loose upper escutcheon plate at riser in the 2nd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Open — Invalid certification - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at outlet north wall in the kitchenette located at apt 1, 1st story, 1st apartment from south at west
Feb 4, 2025 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2024
Open — Info nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water consisting of 153 degrees exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the 2nd room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the 2nd room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Mar 11, 2024 · Apt 2FLOOR
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records dob records indicates residence is a legal 2 family illegal occupancy noted at attic and cellar level created a recreation area with sofa
Mar 5, 2009 · Penalty $1,200
Active - Class - 2
Work w/o a permit ork noted at cellar and attic level installed water and waste lines for residential sinks remedy: obtain permit or restore legal condition
Mar 5, 2009 · Penalty $800
Active
Complaints
- Unsanitary condition
Mold
Jul 19, 2026 · Apt 1
Close - Electric
Power outage
May 14, 2026 · Apt APT1ST
Close - Electric
No lighting
May 13, 2026 · Apt 1STFL
Close - Heat/hot water
Apartment only
Apr 13, 2026 · Apt 1FLOOR
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Mar 30, 2026 · Apt 1STFLO
Close - Flooring/stairs
Floor
Mar 28, 2026 · Apt 1STFLO
Close - Appliance
Refrigerator
Mar 28, 2026 · Apt 1STFLO
Close - Electric
No lighting
Mar 28, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Mar 28, 2026 · Apt 1STFLO
Close
Show 40 more ↓
- Water leak
Heavy flow
Mar 28, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Mar 25, 2026 · Apt 4THFLO
Close - Heat/hot water
Apartment only
Mar 24, 2026 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 1STFLO
Close - Plumbing
Water supply
Jan 2, 2026 · Apt 1STFLO
Close - Plumbing
Water supply
Jan 1, 2026 · Apt 4THFLO
Close - Electric
No lighting
Dec 29, 2025 · Apt 1
Close - Water leak
Slow leak
Dec 20, 2025 · Apt 1STFLO
Close - General
Cabinet
Dec 20, 2025 · Apt 1STFLO
Close - Electric
No lighting
Dec 20, 2025 · Apt 1STFLO
Close - Unsanitary condition
Pests
Dec 20, 2025 · Apt 1STFLO
Close - Unsanitary condition
Pests
Dec 20, 2025 · Apt 1STFLO
Close - Flooring/stairs
Floor
Dec 20, 2025 · Apt 1STFLO
Close - Appliance
Refrigerator
Oct 30, 2025 · Apt 4THFLO
Close - Electric
No lighting
Sep 26, 2025 · Apt 4THFLO
Close - Plumbing
Bathtub/shower
Jun 5, 2025 · Apt 1STFLO
Close - General
Cabinet
Apr 14, 2025 · Apt 1STFL
Close - Unsanitary condition
Pests
Apr 14, 2025 · Apt 1STFL
Close - Door/window
Door frame
Apr 14, 2025 · Apt 1STFL
Close - Paint/plaster
Wall
Apr 14, 2025 · Apt 1STFL
Close - Water leak
Slow leak
Mar 11, 2025 · Apt SECOND
Close - Paint/plaster
Ceiling
Feb 28, 2025 · Apt 2NDFL
Close - Door/window
Window pane
Feb 28, 2025 · Apt 2NDFL
Close - Water leak
Heavy flow
Feb 28, 2025 · Apt 2NDFL
Close - Paint/plaster
Wall
Feb 28, 2025 · Apt 2NDFL
Close - Unsanitary condition
Mold
Feb 28, 2025 · Apt 2NDFL
Close - Water leak
Slow leak
Feb 24, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Feb 24, 2025 · Apt 2FL
Close - Unsanitary condition
Mold
Feb 24, 2025 · Apt 2FL
Close - Paint/plaster
Wall
Jan 20, 2025 · Apt 1FL
Close - Unsanitary condition
Pests
Jan 20, 2025 · Apt 1FL
Close - Appliance
Refrigerator
Jan 20, 2025 · Apt 1FL
Close - Door/window
Door
Jan 20, 2025 · Apt 1FL
Close - General
Cabinet
Jan 20, 2025 · Apt 1FL
Close - Door/window
Window frame
Jan 20, 2025 · Apt 1FL
Close - Electric
Wiring
Jan 20, 2025 · Apt 1FL
Close - Water leak
Damp spot
Jan 20, 2025 · Apt 1FL
Close - Water leak
Slow leak
Jan 20, 2025 · Apt 1FL
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 1STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B9)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,376 ft²
- Lot area
- 2,300 ft²
- Zoning
- R4-1
- Community board
- 412
- Council district
- 27
- Block / lot
- 9827 / 60
- Assessed value
- $59,400
- Landmark / historic district
- No
HPD registration #926725, last renewed —.
Questions about 88-28 172 Street
Who owns 88-28 172 Street?
The owner of record in NYC Department of City Planning PLUTO data is Talukdar, Fatema.
Does 88-28 172 Street have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 88-28 172 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 88-28 172 Street built?
City records list 1920 as the year it was built.
How many apartments are in 88-28 172 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.