67-00 192 Street
Queens, NY 11365BBL 4-07117-0008Map
Owner of record: Queens Fresh Meadows, LLC
67-00 192 Street is a walk-up apartment building built in 1950 in Queens, 11365. It has 215 residential units across 3 floors. The owner of record is Queens Fresh Meadows, LLC. HPD has recorded 211 housing violations here, most recently on July 14, 2026. 30 of the 50 most recent violations are still open. City tax records listed 160 rent-stabilized apartments here in 2024.
- HPD violations
- 211
- DOB violations
- 48
- ECB violations
- 0
- HPD complaints
- 216
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 211
- ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 14, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 14, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 29, 2026
Open — Nov sent out - BHazardous
Properly secure the loose electrical wire cover at east wall at public hall, 1st story
Jun 29, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door leading to hopper door at east wall at public hall, 1st story
Jun 29, 2026
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose wires at east wall at public hall, 2nd story
Jun 29, 2026
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the foyer located at apt b, 1st story, 1st apartment from south at west
Jun 23, 2026 · Apt B
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt b, 1st story, 1st apartment from south at west
Jun 23, 2026 · Apt B
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd room upper level from east located at apt b upper level, 1st story, 1st apartment from south at west
Jun 23, 2026 · Apt B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from east at south wall door, north wall in the private hallway upper level located at apt b upper level, 1st story, 1st apartment from south at west
Jun 23, 2026 · Apt B
Open — Defect letter issued
DOB building violations · 48
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Electric
Wiring
Jun 23, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Jun 19, 2026 · Apt B
Close - Paint/plaster
Ceiling
May 29, 2026 · Apt B
Close - Unsanitary condition
Mold
May 29, 2026 · Apt B
Close - Paint/plaster
Ceiling
May 29, 2026 · Apt B
Close - Safety
Window guard broken/missing
Apr 22, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 12, 2026 · Apt D
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 6720G
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt C3
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 3A
Open
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1950
- Floors
- 3
- Residential units
- 215
- Building area
- 205,744 ft²
- Lot area
- 392,900 ft²
- Zoning
- R4
- Community board
- 408
- Council district
- 23
- Block / lot
- 7117 / 8
- Assessed value
- $10,176,750
- Landmark / historic district
- No
HPD registration #433649, last renewed Jun 25, 2026.
Questions about 67-00 192 Street
Who owns 67-00 192 Street?
The owner of record in NYC Department of City Planning PLUTO data is Queens Fresh Meadows, LLC.
Does 67-00 192 Street have violations?
Yes. NYC HPD has recorded 211 housing violations at this property.
Is 67-00 192 Street rent stabilized?
NYC Department of Finance tax bills listed 160 rent-stabilized units here in 2024 (about 74% of its 215 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 67-00 192 Street built?
City records list 1950 as the year it was built.
How many apartments are in 67-00 192 Street?
It has 215 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.