roofy

64-05 186 Lane

Queens, NY 11366BBL 4-07115-0002Map

Owner of record: Queens Fresh Meadows, LLC

64-05 186 Lane is a walk-up apartment building built in 1950 in Queens, 11366. It has 684 residential units across 3 floors. The owner of record is Queens Fresh Meadows, LLC. HPD has recorded 457 housing violations here, most recently on October 27, 2026. 25 of the 50 most recent violations are still open. City tax records listed 526 rent-stabilized apartments here in 2024.

HPD violations
457
DOB violations
42
ECB violations
10
HPD complaints
558

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
526
About 77% of the building's 684 apartments
Down from 533 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 457

  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt f, 1st story, 1st apartment from south at west

    Oct 27, 2026 · Apt F

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls. in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    Oct 6, 2026 · Apt 1A

    Open — Civ14 mailed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from north at east

    Oct 6, 2026 · Apt 1A

    Open — Civ14 mailed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the foyer located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the private hallway , the bathroom , the 4th room from north at east, the 4th room from north at west, the kitchen located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Certification postponment denied
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Certification postponment denied
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1C

    Open — Civ14 mailed
See all 457 HPD violations (10 shown here)

DOB building violations · 42

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
See all 42 DOB violations (10 shown here)

ECB violations · 10

  • Class - 2

    Failure to maintain building in code-complaint manner noted; a/c units at windows around surrounding building are not properly braced. at apartment section 64-50 c a/c unit at rear is leaving above basement ent

    Aug 11, 2026

    Resolve
  • Class - 3

    Failure to miantain building/property in code complaint manner.-noted:observed wood fence at the rear yard broken approx 8 feet & laying on public area- foot path @the rear of the building.rem: repair and or

    Nov 22, 2019

    Resolve
  • Non-hazardous

    Having awning signage with a surface area exceeding 12 sq feet. with letters higher than 12' inches. remedy: remove illegal signage.

    Dec 18, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work.

    Dec 18, 2002 · Penalty $800

    Resolve
  • Non-hazardous

    Having installed an awining without a permit. remedy; remove illegal work.

    Dec 18, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work.

    Dec 18, 2002

    Resolve
  • Non-hazardous

    3a-49- hand holes welded recript from a certified welder holding "r" stamp to submit.

    Jun 21, 2000

    Resolve
  • Non-hazardous

    Work without a permit work done installation of roof mounted air condition unit. remedy: obtain a permit.

    Apr 30, 1992

    Resolve
  • Non-hazardous

    17(a),17(b)

    Oct 23, 1991

    Resolve
  • Non-hazardous

    Work without a permit- work done- installation of roof mounted air condition unit. remedy: obtain a permit.

    Sep 12, 1990 · Penalty $1,000

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 28, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2026 · Apt F

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 5, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Oct 1, 2026 · Apt 1A

    Close
  • Appliance

    Electric/gas range

    Sep 19, 2026 · Apt 1A

    Open
  • Paint/plaster

    Wall

    Sep 8, 2026 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Sep 8, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Mold

    Sep 8, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt E

    Close
See all 558 HPD complaints (10 shown here)

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C9)
Year built
1950
Floors
3
Residential units
684
Building area
614,916 ft²
Lot area
1,223,830 ft²
Zoning
R4
Community board
408
Council district
23
Block / lot
7115 / 2
Assessed value
$32,021,100
Landmark / historic district
No

HPD registration #433607, last renewed Jun 25, 2026.

Questions about 64-05 186 Lane

Who owns 64-05 186 Lane?

The owner of record in NYC Department of City Planning PLUTO data is Queens Fresh Meadows, LLC.

Does 64-05 186 Lane have violations?

Yes. NYC HPD has recorded 457 housing violations at this property.

Is 64-05 186 Lane rent stabilized?

NYC Department of Finance tax bills listed 526 rent-stabilized units here in 2024 (about 77% of its 684 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 64-05 186 Lane built?

City records list 1950 as the year it was built.

How many apartments are in 64-05 186 Lane?

It has 684 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.