65-15 Alderton Street
Queens, NY 11374BBL 4-03151-0103Map
Owner of record: 65-15 Alderton Ownrs
65-15 Alderton Street is an elevator apartment building built in 1964 in Queens, 11374. It has 45 residential units across 6 floors. The owner of record is 65-15 Alderton Ownrs. HPD has recorded 49 housing violations here, most recently on May 7, 2026. 15 of the 49 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 49
- DOB violations
- 21
- ECB violations
- 10
- HPD complaints
- 119
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at 1st door to service area at basement at public hall
Jun 12, 2024
Open — Invalid certification - BHazardous
Refit door and frame at 1st door to service area at basement at public hall
Jun 12, 2024
Open — Invalid certification - ANon-hazardous
Properly repair the source and abate the evidence of a water leak window frame at east wall in the 3rd room from north at east located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window frame in the 3rd room from north at east located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east wall and window frame in the 2nd room from north located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling, east wall and window frame in the 2nd room from north located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7c, 6th story, 2nd apartment from north at east
Jun 12, 2024 · Apt 7C
Closed — Violation closed
Show 39 more ↓
- BHazardous
Properly repair with similar material the broken or defective brick and mortor joints above 5th and 6th windows from south at 6th story at east building front yard
Jun 12, 2024
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of chain and hook at first door to service area at basement at public hall
Jun 12, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 2nd door to service area at basement at public hall
Jun 12, 2024
Closed — Violation closed - BHazardous
Replace with new the missing latch at 2nd door to service area at basement at public hall
Jun 12, 2024
Open — Invalid certification - CImmediately hazardous
Remove device preventing door from being self-closing consisting of chain and hook at 2nd door to service area at basement at public hall
Jun 12, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4a, 3rd story, 2nd apartment from south at west
Feb 25, 2017 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4a, 4th story, 2nd apartment from south at west
Jan 25, 2017 · Apt 4A
Open — First no access to re- inspect violation - ANon-hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the foyer located at apt 4a, 4th story, 2nd apartment from south at west
Jan 25, 2017 · Apt 4A
Open — Invalid certification - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from south at west
Jul 16, 2007 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from south at west
Jul 16, 2007 · Apt 2E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... walls in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak at ceiling in the 3rd room from north located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east & north wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2d, 2nd story, 2nd apartment from west at north
Jan 3, 2006 · Apt 2D
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 3, 2006
Closed — Violation closed - ANon-hazardous
Refit closet door in the 1st room from north located at apt 5g, 5th story
Feb 2, 2005 · Apt 5G
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby, 1st story
Feb 2, 2005
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of water accumulating at terrace when it rains. in the terrace located at apt 2e, 2nd story, apartment at south
Aug 1, 2004 · Apt 2E
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed leak at ceiling 2nd from east room located at apt 5g, 5th story, apartment at south
Oct 26, 2003 · Apt 5G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & west wall 2nd from east room located at apt 5g, 5th story, apartment at south
Oct 26, 2003 · Apt 5G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at east room located at apt 5g, 5th story, apartment at south
Oct 26, 2003 · Apt 5G
Closed — Violation closed - BHazardous
Properly repair the broken or defective inoperative mechanical ventilating system in the bathroom located at apt 5g, 5th story
Jun 26, 2003 · Apt 5G
Open — Not complied with - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 5g, 5th story
Sep 7, 2002 · Apt 5G
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof
Sep 7, 2002
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 6th story north stack
Sep 7, 2002
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the boiler room floor
Sep 7, 2002
Closed — Violation closed - BHazardous
Properly repair the broken or defective inoperative mechanical ventilatingsystem throughout building public halls
Jun 6, 2002
Open — Not complied with - ANon-hazardous
Paint or post a sign indicating floors all stys at public hall
Jun 6, 2002
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked at cellar f22 06/14/2002 at public hall
Jun 6, 2002
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 5g, 5th story, apartment at south
Mar 26, 2002 · Apt 5G
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical vents in bathroom and kitchen in the entire apartment located at apt 5g, 5th story
Sep 6, 2001 · Apt 5G
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of air space around entrance door 5 sty southeast apt 5g. , section '' ''
Aug 10, 1999 · Apt 5G
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair the broken or defective exhaust vent bathroom 3 sty apt 4b. , section '' ''
Mar 31, 1987 · Apt 4B
Closed — Violation closed - ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department south wall south room 3 sty apt 4b. , section '' ''
Mar 31, 1987 · Apt 4B
Closed — Violation closed
DOB building violations · 21
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved
Show 11 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2011
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 19, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2003
Dob violation - resolved - Plumbing none
Wz
Sep 29, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(38)cover
Jan 5, 1989
Dob violation - resolved
ECB violations · 10
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0004342 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024
Resolve - Class - 1
Dlm improperly installed on this device. no firemans' service present in controller. install firemans' service so dlm is in compliance with section 3.10.12 of appendix k3.
Jan 5, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #811136.submit acceptable required technic
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 3
Failure to maintain bldg wall or appurtenances. noted: at front 2nd story left of entrance window a/c installed w/ loose wood blocking also noted cracking spalling & chipping of concrete balcony slabs @ front v
Aug 10, 2010 · Penalty $500
Resolve - Non-hazardous
86bb05.51b11.59q03.71q03.64q03.67o02.68o02. 51b heavy rouge cables 71q lite
Mar 10, 2008 · Penalty $180
Resolve - Non-hazardous
Failure to provide elevator landing sign,that shall read:<<in case of fire use stairs,unless otherwise instructed>>at the elevator bank on 2 to 7-.remedy:install sign as per local law 16 1984.
Jun 6, 2007 · Penalty $200
Resolve - Non-hazardous
15t,03r,35p.15-mark floor numbers on interside of all hoistway doors as needed 03-hard pipe and wire cab vent fan on car top,remove ext.cord to car top light fixture 35-providde proper access to roof and motor
Jul 19, 1995 · Penalty $200
Resolve - Non-hazardous
Failure to maintain plumbing &/or appurtenances in that a sump pump is illegally installed to storm water catch basin(s) in rear parking area outside bldg. & discharging to adjoining property. area drains do no
May 26, 1993 · Penalty $285
Resolve - Non-hazardous
28h; 28. counterweight.
Feb 6, 1992 · Penalty $75
Resolve - Non-hazardous
25l; 15l. (25) door timing (15) 6 floor door check
Oct 22, 1990
Resolve
Complaints
- Plumbing
Bathtub/shower
Jul 6, 2026 · Apt 3D
Close - Water leak
Slow leak
Mar 23, 2024 · Apt 7C
Close - Heat/hot water
Entire building
Jan 30, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Paint/plaster
Ceiling
May 25, 2021 · Apt 4A
Close - Water leak
Slow leak
May 25, 2021 · Apt 4A
Close - Heat/hot water
Entire building
Nov 8, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2019 · Apt 4A
Close - Safety
Window guard broken/missing
Feb 25, 2017 · Apt 4A
Close - Electric
No lighting
Jan 23, 2017 · Apt 4A
Close
Show 40 more ↓
- Plumbing
Water supply
Oct 31, 2016 · Apt 4G
Close - Heat/hot water
Apartment only
Feb 23, 2015 · Apt 7C
Close - Heat/hot water
Apartment only
Feb 23, 2015 · Apt 7C
Close - Heating
Heat related
Feb 9, 2013 · Apt 7C
Close - Heating
Heat related
Nov 1, 2012 · Apt NA
Close - Nonconst
Vermin
Feb 10, 2012 · Apt BUILD
Close - Heating
Heat related
Jan 4, 2012 · Apt 5G
Close - Heating
Heat related
Jan 4, 2012 · Apt 6A
Close - Heating
Heat related
Dec 28, 2011 · Apt BLDG
Close - Heating
Heat related
Dec 28, 2011 · Apt BLDG
Close - General
Fire-escape
Dec 5, 2011 · Apt BLDG
Close - Heating
Heat related
Dec 9, 2010 · Apt NA
Close - Heating
Heat related
Dec 8, 2010 · Apt BLDG
Close - Heating
Heat related
Dec 8, 2010 · Apt NA
Close - Heating
Heat related
Dec 8, 2010 · Apt BLDG
Close - Heating
Heat related
Dec 8, 2010 · Apt NA
Close - Heating
Heat related
Dec 8, 2010 · Apt NA
Close - Heating
Heat related
Dec 7, 2010 · Apt 2E
Close - Heating
Heat related
Dec 6, 2008 · Apt 6E
Close - Nonconst
Janitor/super
Dec 1, 2008 · Apt 2E
Close - General
Doors
Dec 1, 2008 · Apt 2E
Close - Plumbing
Water-leaks
Aug 22, 2008 · Apt 2E
Close - Plumbing
Basin/sink
Aug 11, 2008 · Apt 2E
Close - Paint/plaster
Wall
Jun 10, 2008 · Apt 5G
Close - Plumbing
Water-leaks
Jun 10, 2008 · Apt 5G
Close - General
Doors
Mar 25, 2008 · Apt 5G
Close - Heating
Heat related
Jan 2, 2008 · Apt 5G
Close - Heating
Heat related
Dec 4, 2007 · Apt 5G
Close - Heating
Heat related
Nov 23, 2007 · Apt 5G
Close - Paint/plaster
Ceiling
Oct 30, 2007 · Apt 2G
Close - General
Windows
Oct 30, 2007 · Apt 2G
Close - Appliance
Refrigerator
Oct 30, 2007 · Apt 2G
Close - General
Ceramic-tile
Oct 30, 2007 · Apt 2G
Close - Appliance
Refrigerator
Jul 16, 2007 · Apt 2E
Close - General
Floor
Jul 16, 2007 · Apt 2E
Close - Plumbing
Bathtub/shower
Jul 16, 2007 · Apt 2E
Close - Paint/plaster
Ceiling
Jul 16, 2007 · Apt 2E
Close - Construction
Pavement
Jul 9, 2007 · Apt 2E
Close - General
Floor
Jul 9, 2007 · Apt 2E
Close - Paint/plaster
Ceiling
Jul 9, 2007 · Apt 2E
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 29, 2026 | $190,000 | Coops - elevator apartments | — |
| Mar 24, 2026 | $490,000 | Coops - elevator apartments | — |
| Dec 9, 2025 | $310,000 | Coops - elevator apartments | — |
| Nov 18, 2025 | $276,000 | Coops - elevator apartments | — |
| Oct 20, 2025 | $220,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1964
- Floors
- 6
- Residential units
- 45
- Building area
- 42,948 ft²
- Lot area
- 13,023 ft²
- Zoning
- R3-1
- Community board
- 406
- Council district
- 30
- Block / lot
- 3151 / 103
- Assessed value
- $2,020,500
- Landmark / historic district
- No
HPD registration #420609, last renewed Sep 9, 2025.
Questions about 65-15 Alderton Street
Who owns 65-15 Alderton Street?
The owner of record in NYC Department of City Planning PLUTO data is 65-15 Alderton Ownrs.
Does 65-15 Alderton Street have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 65-15 Alderton Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 2% of its 45 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 65-15 Alderton Street built?
City records list 1964 as the year it was built.
How many apartments are in 65-15 Alderton Street?
It has 45 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.