roofy

86-05 60 Road

Queens, NY 11373BBL 4-02874-0055Map

Owner of record: Karen Gardens Corp

86-05 60 Road is an elevator apartment building built in 1964 in Queens, 11373. It has 68 residential units across 6 floors. The owner of record is Karen Gardens Corp. HPD has recorded 326 housing violations here, most recently on September 4, 2026. 32 of the 50 most recent violations are still open.

HPD violations
326
DOB violations
47
ECB violations
52
HPD complaints
333

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 326

  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protuding more than 4 inches from the window sill at 4th story balcony at south stack building front at fire escape

    Sep 4, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north at east located at apt 3j, 3rd story, 2nd apartment from west at north

    Sep 4, 2026 · Apt 3J

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at east located at apt 3j, 3rd story, 2nd apartment from west at north

    Sep 4, 2026 · Apt 3J

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at west located at apt 3j, 3rd story, 2nd apartment from west at north

    Sep 4, 2026 · Apt 3J

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north at west located at apt 3j, 3rd story, 2nd apartment from west at north

    Sep 4, 2026 · Apt 3J

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set at 2nd fire door leading to laundry room at public hall, cellar entrance story

    Nov 29, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set at laundry room entrance door at cellar entrance story

    Nov 29, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at laundry room entrance door at cellar entrance story

    Nov 29, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set and hinges at 1st fire door at west wall leading to laundry room at public hall, cellar entrance story

    Nov 29, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set and hinges at 2nd fire door leading to laundry room at west wall at public hall,cellar entrance story

    Nov 29, 2025

    Closed — Violation closed
Show 40 more ↓
  • B

    Replace with new the missing lock set at 1st fire door leading to laundry room at public hall, cellar entrance story

    Nov 29, 2025

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 25, 2025 · Apt 6K

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 25, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • A

    Properly repair or replace the broken or defective ventilation system at south wall in the bathroom located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 25, 2025 · Apt 6K

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixtures at ceiling in the bathroom located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 25, 2025 · Apt 6K

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 10, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 10, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 5th story, 3rd apartment from west at north

    Aug 27, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6k, 5th story, 3rd apartment from west at north

    Aug 27, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 6th story

    Jun 30, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape window in the 1st room from north at east located at apt 6k, 6th story, 3rd apartment from west at north

    Jun 30, 2025 · Apt 6K

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Jun 30, 2025 · Apt 6K

    Open — Notice of issuance sent to tenant
  • C

    Remove device preventing door from being self-closing hook and eye installed on 1st fire door from public hall leading to laundry room at basement

    Mar 10, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on 1st fire door from public hall leading to laundry room at basement

    Mar 10, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing hook and eye installed on 2nd fire door from public hall leading to laundry room at basement

    Mar 10, 2025

    Closed — Violation closed
  • B

    Replace with new the missing latch on door to laundry room at basement

    Mar 10, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges and latch at laundry room at basement

    Mar 10, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 3rd apartment from south at west

    Feb 17, 2025 · Apt 6K

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door leading to rear yard at public hall, 1st story

    Jan 22, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Dec 14, 2024 · Apt 6K

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Dec 14, 2024 · Apt 6K

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at cellar

    Sep 23, 2024

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 6th story

    Jul 3, 2024

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling south and north wall at public hall, 6th story

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective fire retardant material ceiling, south and north wall at public hall, 6th story

    Jul 3, 2024

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock installed on door to toom leading to fire escape window in the 1st room from north at east located at apt 6k, 6th story, 3rd apartment from west at north

    Jul 3, 2024 · Apt 6K

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Jul 3, 2024 · Apt 6K

    Open — Notice of issuance sent to tenant
  • C

    Properly repair or replace the broken or defective angle iron support bracket for metal landing pad under drop ladder at 1st stack from south at building front entrance at fire escape

    May 17, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective frame, west 1 door leadingto west corridor door at public hall

    May 17, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, west 1 door leading to laundry room corridor, at basement at public hall

    May 17, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, laundry room at public hall

    May 17, 2024

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of motion activate light fixture at west corridor, basement at public hall

    May 17, 2024

    Open — Nov sent out
  • B

    Replace with new the missing handle at west 1 door leading to west corridor door at public hall

    May 17, 2024

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Nov 30, 2023 · Apt 6K

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 6k, 6th story, 3rd apartment from west at north

    Nov 30, 2023 · Apt 6K

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of key operated lock on door of room leading to the fire escape window in the 2nd room from east located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 19, 2023 · Apt 6K

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6k, 6th story, 3rd apartment from west at north

    Sep 19, 2023 · Apt 6K

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective located at apt 6k, 6th story, 3rd apartment from west at north

    May 19, 2023 · Apt 6K

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 6k, 6th story, 3rd apartment from west at north

    May 19, 2023 · Apt 6K

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective .. located at apt 6k, 6th story, 3rd apartment from west at north

    May 19, 2023 · Apt 6K

    Closed — Violation closed

DOB building violations · 47

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 11, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 16, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Oct 18, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Mar 24, 2016

    Dob violation - active
Show 37 more ↓
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Mar 24, 2016

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Mar 24, 2016

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Aug 18, 2015

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2015

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 25, 2015

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4

    Dec 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2012

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 8, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 30, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 29, 2009

    Dob violation - resolved
  • Construction other optional

    Work w/out permit

    Oct 15, 2008

    Vw*-violation - work w/o permit dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 12, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 15, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    4p4153

    Apr 29, 2002

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Feb 26, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 22, 2001

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Aug 20, 2001

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Aug 16, 2001

    Vw*-violation - work w/o permit dismissed
  • Elevator elevatorrequired

    4p4153

    Oct 17, 2000

    Dob violation - resolved
  • Plumbing none

    P-plumbing none

    Jun 25, 1998

    Vw-violation work without permit - active
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Jul 29, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 10, 1992

    Vp-violation unserved ecb-active
  • Elevator elevatorrequired

    Device #4p4153

    Mar 6, 1991

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatoroptional

    1

    Oct 12, 1989

    Dob violation - active

ECB violations · 52

  • Class - 2

    Failure to file acceptable amended cycle 6, 7a, 8a, and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #911099. agg2 history of noncomp

    Apr 20, 2026 · Penalty $10,000

    Active
  • Class - 2

    Federal boiler has a defective hot water mixing valve;correct violation+submit certificate of correction

    Jan 13, 2026 · Penalty $620

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. note: observed at exposure 1 east elevation spalling concrete balcony slabs,deteriorated mortar joints. at exposure 2, south elevation, observed s

    Jan 9, 2025 · Penalty $2,500

    Active
  • Class - 2

    Failure to file acceptable amended cycle 6,7a,8a & 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #911099.agg1:prior nov 37022347r unde

    Jan 16, 2024 · Penalty $10,000

    Active
  • Class - 1

    Failure to take required safety measure to secure public safety unsafe facade.observed no safety measures in place around building documented as unsafe facade by qewi.remedy:provide approved safety measures.

    Feb 15, 2022 · Penalty $25,000

    Active
  • Class - 1

    Failure to provide safety measures to protect public from a documentedunsafe facade.as noted:building filed a unsafe facade report with a control#911099 and as of 12/27/21 sidewalk shed is inadequate to protect

    Dec 21, 2021 · Penalty $25,000

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications.at the time ofinspection,this was a 6 story residential apartment building.there wasno construction activity on site.as per perimeter inspection,i observe

    Oct 14, 2021 · Penalty $10,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 6,7a and 8a report indicatingcorrection of unsafe conditions described in initial facades report required by 28-302.5 for control#811099.remedy:file acceptable report.

    Oct 8, 2021 · Penalty $6,250

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications.note:parapet panels of sidewalk shed fallen down to street repairs had not been made.remedy:repair and comply to code specifications.

    Oct 7, 2021 · Penalty $2,400

    Active
  • Class - 2

    Failure to maintain building walls or appurtenances.note:observed stepped cracks on masonry wall near 6&7 floor balcony slabs on exp #1 ext elevation spalling plaster on masonry wall & near backyard entrance do

    Oct 7, 2021 · Penalty $6,250

    Active
Show 40 more ↓
  • Class - 2

    Temporary construction equipment on site-expired permit.note:temporary construction equipment(shed)permit #200134213-l1-sh expired 12/31/20 as of 10/07/21 no new shed permit on file.remedy:renew permit.

    Oct 7, 2021 · Penalty $6,250

    Active
  • Class - 2

    Failure to obtain a temporary construction permit to installed-sidewalk shed.note:at time of my inspection observed sidewalk shed installed on pedestrian walkway w/permit expired not renewed as required.the sws

    Sep 16, 2021 · Penalty $6,250

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications.-sidewalk shednot maintain as required.note:at time of my inspection observed sidewalk shed installed on pedestrian walkway & are not maintain as required

    Sep 16, 2021 · Penalty $10,000

    Active
  • Class - 2

    Expired brake tag , perfor and file inspection in mcp log book / outside comm inoperative , repair

    Apr 13, 2020 · Penalty $625

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications. note: at timeof my inspection observed sidewalk shed indstalled outside of the bldg was not maintain as required. the sidewalk shed was not covered netti

    Feb 12, 2020

    Resolve
  • Class - 2

    Faillure to maintain exterior building facade and appurenances.note:at the time of facade inspection facade observe debries,such as 1-exposure#2at (lan horn st facing)observed crack/spalled&chipping bricks mort

    Jan 11, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file acceptable amended report.

    Nov 7, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to file an acceptable technical report in compliance of code provisions:periodic inpsection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations.rem:file t

    Sep 21, 2015 · Penalty $2,000

    Active
  • Class - 2

    Failure to maintain exterior building south elev. exp 1 parapet clapping trim dislodged.6flr crack at corner,5 flr brick under a/c unit. parapet vent sealant dried.west elev exp2-a.c units not supported flrs

    Jul 14, 2015 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34939096r issued on 11/17/14. for work w/o a permit at 4th sty apt designated 4g altered partitions,plumbing & electric.

    Feb 25, 2015 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34939096r issued on 11/17/14. (illegal alteration apt 4g) remedy: comply w/the comm's order.

    Jan 7, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit. work noted: apt 4g is fully renovated,exiting kitchen relocation and converted to a bedroom. new 3pc bath(sink,toilet, shower),new partition walls and demolished some existing walls.rmdy:ob

    Nov 17, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    May 19, 2014 · Penalty $800

    Active
  • Class - 2

    Work w/o a permit in that in apt 6e on 6th flr, interior partitions erected to create an additional 2 rooms.rmdy:obtain approvals & permits for above work or restore to prior legal condition.

    May 9, 2013 · Penalty $800

    Active
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.work in progress under permit#420486878 facade renovation.noted:working on facade above entrance into adjacent premises @ 86-15 60

    May 11, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Work without a permit. work noted: at 4th floor of premises apt. 4b erected full height partition with hardware and vertical door approx 8'heightx12' width. remedy:obtain permit or restore to prior legal condit

    Nov 30, 2011 · Penalty $2,000

    Resolve
  • Class - 2

    Work does not conform to plans app #420486478. noted: outrigger scaffold has a (cantilever) of approx 7' w/14 50 lb plates. plans call for a3' cantilever w/19 plates of 50 lb each. plans call for balcony

    Oct 14, 2011

    Resolve
  • Class - 2

    Failure to maintain interior. noted: water damage to walls and ceilingof top flr due to roof leaks. remedy: maintain bldg.

    Oct 14, 2011

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules &

    Jun 30, 2011 · Penalty $8,000

    Active
  • Class - 1

    Supervision/use of rigging equipment w/o a riggers license. noted: no license rigger on site for suspended scaffold off "c" hooks at exp #1.remedy: obtain license. partial swo (rope scaffold) issued pursuant to

    Jun 13, 2011 · Penalty $4,800

    Resolve
  • Class - 2

    Work w/o a permit.work noted:@ apt#2b erected full height partitions creating additional bedrooms & sub dividing livingroom area;partitions approx 8'hx 12'w w/ vertical door,hardware & trim.rem:obtain permit or

    Apr 4, 2011

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302&the dob rules&regulations. 36012117x

    Sep 20, 2010 · Penalty $8,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner noted some fpsc doors to staircase are not self closing these doors remain wide open one fpsc door at 3rd fl is kept wide open by holding it w/ a string rem: re

    Jul 20, 2010 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to comply w/ the comms order to file a cert of correction w/ the dob noted respondent failed to comply w/ the comms order to correct the violating conditions and file a cert of correction pursuant to 28

    Jul 20, 2010 · Penalty $800

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection exterior walls & appurtenaces28.302 & the dob rules & regulations.rem:file the required report to t

    Jul 14, 2010 · Penalty $800

    Active
  • Class - 1

    Fail to provide sidewalk shed where required.noted:upon insp observed men working on suspended scaffold @ exp 4 no sidewalk shed @ corner of exp 1 & 4 creating a hazardous condition.stop all work on suspended s

    Jun 28, 2010 · Penalty $4,800

    Active
  • Class - 1

    3314.6.2.no protection of ropes/cables around sharp bends,corners ropes/cables shall not be made fast to sharp objects or surfaces.noted:lifeline ropes were not protected around steel dunnage & over metal capin

    Jun 28, 2010 · Penalty $1,600

    Active
  • Class - 1

    Failure to maintain staircase fpsc doors multiple drs not self closing & some being held w/string.rem:repair/close drs

    Mar 30, 2010 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Feb 17, 2010 · Penalty $8,000

    Active
  • Class - 2

    Wrk w/o a permit expired permit.wrk done on expired permit#402515881(expired 6/29/2007) in garage meter rm gas piping complete, no insp done.rem:renew permit

    Dec 4, 2009 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to maintain building interior. observed: on all floors- stairwell fire/smoke doors inoperative. doors either tied open with rope or remain open due to being in disrepair. rem: repair fire doors-maintain

    Oct 2, 2009 · Penalty $5,000

    Resolve
  • Class - 2

    Sec 28-118.6.4.2 & rcny 101-10 misc viol: fail to perform a final inspfor completed work within one year of permit expiration. app 402576690/a2 exp 2/25/08 associated technical report not signed off. structural

    Mar 20, 2009 · Penalty $800

    Active
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations

    Jan 30, 2009 · Penalty $4,000

    Active
  • Class - 1

    Work w/o permit. noted: apt 6l with gut renovation in progress. installation of now partitions. sheet rock, kitchen & bath,plumbing & electrical. remedy: obtain permit or restore premises to prior legal conditi

    Oct 15, 2008 · Penalty $1,600

    Resolve
  • Non-hazardous

    85bb5/86bb5/40t7/55y13/55o2/59q3/38q3/38o2/31h10/10h11/17h11/8v1/15i11/23i10/66o2/.38q-lite.23i-lobby.

    Oct 31, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    09h11/33o02/38o02/39o02/51k#/86u15/40i10. 09-h-11-worn floor tiles. 51-k-#-rouged ropes, lubricate

    Sep 20, 2005 · Penalty $350

    Resolve
  • Non-hazardous

    10m11/17h11/43h08/51k11/40i10/24x10 (10) rear (24) also secure main floor cover properly.

    May 2, 2005

    Resolve
  • Hazardous

    Work w/o a permit/work noted:installation of approx 100' of steel lally column sidewalk shed at front of premises.sidewalk shed does not meet building code specifications 1-no lights installed beneath deck.2-si

    Aug 22, 2001 · Penalty $2,800

    Resolve
  • Hazardous

    Use of a 2 point suspension scaffold without a special riggens license.

    Aug 16, 2001 · Penalty $500

    Active
  • Hazardous

    Plumbing work without a permit a permit. dresser couplings installed on gas pipe distriburtion side of meter

    Jun 25, 1998 · Penalty $2,500

    Resolve

Complaints

  • Water leak

    Heavy flow

    Aug 27, 2026 · Apt 3J

    Open
  • Water leak

    Damp spot

    Aug 27, 2026 · Apt 3J

    Open
  • Water leak

    Slow leak

    Aug 27, 2026 · Apt 3J

    Open
  • Door/window

    Window frame

    Aug 20, 2026 · Apt 3JON3R

    Close
  • Unsanitary condition

    Pests

    May 11, 2026 · Apt 2H

    Close
  • Flooring/stairs

    Floor

    May 11, 2026 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 23, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2025 · Apt BLDG

    Close
  • General

    Ventilation system

    Sep 21, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2025 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2025 · Apt BLDG

    Close
  • General

    Mailbox

    Jan 28, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Jan 28, 2025 · Apt 6K

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 6K

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2025 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2025 · Apt BLDG

    Close
  • General

    Mailbox

    Jan 4, 2025 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 3, 2024 · Apt 3B

    Close
  • Safety

    Fire escape

    Dec 3, 2024 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Dec 3, 2024 · Apt 6K

    Close
  • Door/window

    Door

    Dec 3, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Nov 19, 2024 · Apt 6K

    Close
  • General

    Janitor/super

    Sep 20, 2024 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Jun 17, 2024 · Apt 6K

    Close
  • Plumbing

    Water supply

    Jun 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 17, 2024 · Apt 6K

    Close
  • General

    Ventilation system

    May 9, 2024 · Apt 6K

    Close
  • Plumbing

    Basin/sink

    May 9, 2024 · Apt 6K

    Close
  • Plumbing

    Basin/sink

    May 6, 2024 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2024 · Apt 6K

    Close
  • Unsanitary condition

    Pests

    Apr 15, 2024 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Apr 14, 2024 · Apt BLDG

    Close

Sales history

DatePriceTypeUnits
Feb 16, 2026Non-market transferCoops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1964
Floors
6
Residential units
68
Building area
57,816 ft²
Lot area
15,400 ft²
Zoning
R6
Community board
406
Council district
30
Block / lot
2874 / 55
Assessed value
$4,273,200
Landmark / historic district
No

HPD registration #420548, last renewed Mar 26, 2026.

Questions about 86-05 60 Road

Who owns 86-05 60 Road?

The owner of record in NYC Department of City Planning PLUTO data is Karen Gardens Corp.

Does 86-05 60 Road have violations?

Yes. NYC HPD has recorded 326 housing violations at this property.

Is 86-05 60 Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 86-05 60 Road built?

City records list 1964 as the year it was built.

How many apartments are in 86-05 60 Road?

It has 68 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.