51-55 Van Kleeck Street
Queens, NY 11373BBL 4-02474-0010Map
Owner of record: Van Kleeck Associates
51-55 Van Kleeck Street is an elevator apartment building built in 1963 in Queens, 11373. It has 77 residential units across 6 floors. The owner of record is Van Kleeck Associates. HPD has recorded 272 housing violations here, most recently on October 5, 2026. 17 of the 50 most recent violations are still open. City tax records listed 64 rent-stabilized apartments here in 2024.
- HPD violations
- 272
- DOB violations
- 17
- ECB violations
- 11
- HPD complaints
- 519
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 272
- BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at the bathtub in the bathroom located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in at sink wasteline in the kitchen located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lower sashs window at east in the 1st room from north located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch assembly at door in the entrance located at apt 2a, 2nd story
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 1st story, 1st apartment from north at east
Oct 5, 2026 · Apt 2A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 2nd story
Oct 5, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5j, 4th story, 5th apartment from south at west
Oct 4, 2026 · Apt 5J
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at cellar
Oct 4, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair or replace the broken or defective 2nd from west the drawer and door of base cabinet at north in the kitchen located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the 1st room from north at west located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the kitchen located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall in the kitchen located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall in the 2nd room from north at west located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and celing in the 3rd room from north located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective sash lock at window at window leading to fire escape in the 1st room from north at west located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at west and north walls in the bathroom located at apt 5j, 4th story, 5th apartment from south at west
Jul 14, 2026 · Apt 5J
Open — Not complied with - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 3, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5j, 4th story, 4th apartment from south at west
Jun 3, 2026 · Apt 5J
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5j, 4th story, 4th apartment from south at west
Jun 3, 2026 · Apt 5J
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from north located at apt 5j, 4th story, 4th apartment from south at west
Jun 3, 2026 · Apt 5J
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south and east wall in the bathroom located at apt 5j, 4th story, 4th apartment from south at west
Jun 3, 2026 · Apt 5J
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door at public hall stairs, 3rd story
Nov 10, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set on public hall stair door at public hall stairs, 3rd story
Nov 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6n, 5th story, 2nd apartment from north at east
Jul 11, 2025 · Apt 6N
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6n, 5th story, 2nd apartment from north at east
Jul 11, 2025 · Apt 6N
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective reglaze bathtub in the bathroom located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the foyer , the bathroom , the kitchen , the 1st room from east at south, the 3rd room from east at south located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 5, 4th story, 1st apartment from east at south
Jun 12, 2025 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6n, 5th story, 2nd apartment from north at east
Jun 4, 2025 · Apt 6N
Open — False certification - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6n, 5th story, 2nd apartment from north at east
Jun 4, 2025 · Apt 6N
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6n, 5th story, 2nd apartment from north at east
Jun 4, 2025 · Apt 6N
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroom located at apt 6n, 5th story, 2nd apartment from north at east
Jun 4, 2025 · Apt 6N
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch vestibule door to public hall , 1st story
Nov 30, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to stairway at public hall, 1st story
Nov 30, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at compactor closet, 3rd story, section ''a-g''
Oct 29, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 3rd story, section ''a-g''
Oct 29, 2024
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south , section ''a-g'', at south
Oct 8, 2024 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the private hallway located at apt 3d, 3rd story, 1st apartment from east at south , section ''a-g'', at south
Oct 8, 2024 · Apt 3D
Closed — Violation dismissed
DOB building violations · 17
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 5, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - active
Show 7 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2006
Dob violation - resolved - Elevator elevatorrequired
4p4114
Sep 6, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0000942 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024
Resolve - Class - 2
At front of building, at 3rd floor and 6th floor, window ac units installed without brackets as per dob and manufacturers requirements., repair and/or replace
Nov 8, 2023 · Penalty $1,562
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Jun 19, 2020
Resolve - Class - 2
5b10,70o2, 39x10, 56m07 5b10- (shimm)5th floor door rubbing floor when open.30x10 repair top of car light. 56m07 provide maching cable.
Dec 19, 2017 · Penalty $2,500
Resolve - Class - 2
03m07 provide 24 hour emergency phone as per appendix k.
Aug 15, 2014
Resolve - Class - 1
97x10,32h10,10h11,52h11,56y02,56y13.cease use:(97x10).call dob for reinspection @ 212-566-5539.
Oct 18, 2010
Resolve - Class - 1
97x10,32h10,10h11,52h11,56y02,56y13. 97x- restore back to service
Oct 18, 2010 · Penalty $1,000
Resolve - Hazardous
Failed to notify dob prior to the use of c hooks in connection w/suspended scaffold.licensed rigger failed to ensure that the scaffold workers met minimum reqs.no certificate of fitness.
Oct 2, 2007 · Penalty $2,000
Resolve - Non-hazardous
Fence exceeds permitted height installed chain link fence at left side of bldg.fence approx 8'-0' high which exceeds the permitted height of 6-0' that allowed by bldg code.remedy:conform fence to code
Jan 25, 2007 · Penalty $300
Resolve - Non-hazardous
41m7,37g12. *41 install up and down switch on governor. *37 removed wire from fuse in controller.
Aug 24, 2000 · Penalty $180
Resolve
Show 1 more ↓
- Non-hazardous
Work without a permit:work noted:installed a roof mounted #3 trane air conditioner.remedy:obtain a permit if feasible or restore premises to prior legal condition.
Jul 29, 1992
Resolve
Complaints
- Plumbing
Basin/sink
Aug 26, 2026 · Apt 2A
Close - Flooring/stairs
Floor
Aug 26, 2026 · Apt 2A
Close - Door/window
Window frame
Aug 26, 2026 · Apt 2A
Close - Plumbing
Basin/sink
Apr 6, 2026 · Apt 5J
Close - Door/window
Door
Apr 6, 2026 · Apt 5J
Close - Plumbing
Water supply
Feb 18, 2026 · Apt 7C
Close - Plumbing
Water supply
Feb 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 7, 2025 · Apt 7A
Close - Heat/hot water
Entire building
Nov 3, 2025 · Apt BLDG
Close - Water leak
Slow leak
Nov 2, 2025 · Apt 7D
Close - Unsanitary condition
Pests
Nov 2, 2025 · Apt 7D
Close - Paint/plaster
Ceiling
Nov 2, 2025 · Apt 7D
Close - Unsanitary condition
Pests
Nov 2, 2025 · Apt 7D
Close - Door/window
Door
Aug 21, 2025 · Apt BLDG
Close - Paint/plaster
Window/frame
Jun 11, 2025 · Apt 5
Close - Paint/plaster
Ceiling
Jun 11, 2025 · Apt 6
Close - Unsanitary condition
Pests
Jun 11, 2025 · Apt 6
Close - Unsanitary condition
Pests
Jun 11, 2025 · Apt 6
Close - Unsanitary condition
Pests
Jun 11, 2025 · Apt 5
Close - Plumbing
Toilet
Jun 11, 2025 · Apt 5
Close - Safety
Carbon monoxide detector
Jun 11, 2025 · Apt 5
Close - Unsanitary condition
Pests
Jun 11, 2025 · Apt 5
Close - Safety
Smoke detector
Jun 11, 2025 · Apt 5
Close - Water leak
Slow leak
Jun 8, 2025 · Apt 7D
Close - Paint/plaster
Ceiling
Jun 8, 2025 · Apt 7D
Close - Door/window
Door
Jun 8, 2025 · Apt 7D
Close - Unsanitary condition
Pests
Jun 8, 2025 · Apt 7D
Close - Unsanitary condition
Pests
Jun 8, 2025 · Apt 7D
Close - Paint/plaster
Ceiling
May 18, 2025 · Apt 4B
Close - Unsanitary condition
Mold
May 18, 2025 · Apt 4B
Close - Water leak
Heavy flow
May 18, 2025 · Apt 4B
Close - Water leak
Heavy flow
May 16, 2025 · Apt 6N
Close - Paint/plaster
Wall
May 16, 2025 · Apt 6N
Close - Unsanitary condition
Mold
May 16, 2025 · Apt 6N
Close - Door/window
Door
Nov 18, 2024 · Apt BLDG
Close - Elevator
Maintenance
Nov 18, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 6, 2024 · Apt 3D
Close - Safety
Smoke detector
Jul 16, 2024 · Apt 5FL
Close - Safety
Carbon monoxide detector
Jul 16, 2024 · Apt 5FL
Close - Door/window
Window frame
Jul 16, 2024 · Apt 5FL
Close - General
Mailbox
Jun 11, 2024 · Apt 5J
Close - Water leak
Damp spot
Apr 7, 2024 · Apt 6N
Close - Water leak
Heavy flow
Apr 7, 2024 · Apt 6N
Close - Door/window
Door
Dec 3, 2023 · Apt 7E
Close - Door/window
Door
Jul 24, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 8, 2023 · Apt BLDG
Close - Elevator
Maintenance
Jun 7, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1963
- Floors
- 6
- Residential units
- 77
- Building area
- 68,440 ft²
- Lot area
- 17,351 ft²
- Zoning
- R6B
- Community board
- 404
- Council district
- 30
- Block / lot
- 2474 / 10
- Assessed value
- $2,388,150
- Landmark / historic district
- No
HPD registration #420424, last renewed Oct 10, 2025.
Questions about 51-55 Van Kleeck Street
Who owns 51-55 Van Kleeck Street?
The owner of record in NYC Department of City Planning PLUTO data is Van Kleeck Associates.
Does 51-55 Van Kleeck Street have violations?
Yes. NYC HPD has recorded 272 housing violations at this property.
Is 51-55 Van Kleeck Street rent stabilized?
NYC Department of Finance tax bills listed 64 rent-stabilized units here in 2024 (about 83% of its 77 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 51-55 Van Kleeck Street built?
City records list 1963 as the year it was built.
How many apartments are in 51-55 Van Kleeck Street?
It has 77 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.