62-59 108 Street
Queens, NY 11375BBL 4-02166-0001Map
Owner of record: 62-59 108th St Owners INC
62-59 108 Street is an elevator apartment building built in 1959 in Queens, 11375. It has 114 residential units across 6 floors. The owner of record is 62-59 108th St Owners INC. HPD has recorded 102 housing violations here, most recently on January 22, 2026. 7 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 102
- DOB violations
- 48
- ECB violations
- 23
- HPD complaints
- 295
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs door (b) at basement story at public hall
Jan 22, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Feb 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Feb 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5k, 5th story, 2nd apartment from south at west , section ''north''
Feb 22, 2025 · Apt 5K
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5k, 5th story, 2nd apartment from south at west , section ''north''
Feb 22, 2025 · Apt 5K
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5k, 5th story, 2nd apartment from south at west , section ''north''
Feb 22, 2025 · Apt 5K
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at apt 5h, 6th story, 4th apartment from east at south , section at south
Sep 16, 2024 · Apt 5H
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated locking device at gate leading to fire escape in the 3rd room from north at east located at apt 5h, 6th story, 4th apartment from east at south , section at south
Sep 16, 2024 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5h, 6th story, 4th apartment from east at south , section at south
Sep 16, 2024 · Apt 5H
Open — Defect letter issued
Show 40 more ↓
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north located at apt 5h, 6th story, 4th apartment from east at south , section at south
Sep 16, 2024 · Apt 5H
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 5h, 6th story, 4th apartment from east at south , section at south
Sep 16, 2024 · Apt 5H
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6f, 5th story, 2nd apartment from east at south , section at south
Mar 5, 2024 · Apt 6F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3f, 2nd story, 2nd apartment from east at south , section at south
Mar 5, 2024 · Apt 3F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7s, 6th story, 2nd apartment from north at east , section at north
Mar 5, 2024 · Apt 7S
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7p, 6th story, 4th apartment from west at north , section at north
Mar 5, 2024 · Apt 7P
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7m, 6th story, 2nd apartment from west at north , section ''6259'', 1st from west at north
Mar 5, 2024 · Apt 7M
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2g, 1st story, 3rd apartment from east at south , section at south
Mar 5, 2024 · Apt 2G
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2f, 1st story, 2nd apartment from east at south , section at south
Mar 5, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 2nd story, 2nd apartment from north at east
Mar 5, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4e, 3rd story, 1st apartment from east at south , section at south
Mar 5, 2024 · Apt 4E
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4d, 3rd story, 2nd apartment from north at east
Mar 5, 2024 · Apt 4D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6h, 5th story, 4th apartment from east at south , section at south
Mar 5, 2024 · Apt 6H
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6g, 5th story, 3rd apartment from east at south , section at south
Mar 5, 2024 · Apt 6G
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 7a, 6th story, 2nd apartment from south at west , section at south
Mar 5, 2024 · Apt 7A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3g, 2nd story, 3rd apartment from east at south , section at south
Mar 5, 2024 · Apt 3G
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate airconditioner installed at window in the 4th room from east located at apt 5d, 5th story, 2nd apartment from north at east
Dec 24, 2023 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5d, 5th story, 2nd apartment from north at east
Dec 24, 2023 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Dec 20, 2023 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Dec 20, 2023 · Apt 5D
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6l, 6th story, 1st apartment from west at north
Sep 1, 2023 · Apt 6L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective missing at public hall, 1st story, section at north
Sep 1, 2023
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6l, 6th story, 1st apartment from west at north
Sep 1, 2023 · Apt 6L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 6l, 6th story, 1st apartment from west at north
Sep 1, 2023 · Apt 6L
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ,all walls and ceiling in the bathroom located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets ,at bath tub in the bathroom located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ,at ceiling in the bathroom located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Open — Defect letter issued - ANon-hazardous
Replace with new the broken or defective door in the bathroom located at apt 4p, 4th story, 4th apartment from west at north
Feb 11, 2022 · Apt 4P
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 4 sq ft at the north wall in the kitchen located at apt 5p, 5th story, 4th apartment from west at north , section ''north'' original violation 14395991 issued 17-jun-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 17, 2021 · Apt 5P
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 sq ft at the north wall in the kitchen located at apt 5p, 5th story, 4th apartment from west at north , section ''north''
Jun 17, 2021 · Apt 5P
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 27, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Aug 27, 2017
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2k, 2nd story, 2nd apartment from south at west
Aug 27, 2017 · Apt 2K
Closed — Violation dismissed
DOB building violations · 48
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jan 11, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2013
Dob violation - resolved
Show 38 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 25, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2012
Dob violation - resolved - Facade facade optional
Unsafe local law 11/98 report filed
Apr 25, 2012
Dob violation - dismissed - Facade facade optional
Unsafe local law 11/98 report filed
Apr 25, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2008
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 26, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2003
Dob violation - resolved - Elevator elevatorrequired
4p2988
Apr 30, 2002
Dob violation - resolved - Elevator elevatorrequired
4p2987
Apr 30, 2002
Dob violation - resolved - Elevator elevatorrequired
4p2988
Feb 9, 2001
Dob violation - resolved - Elevator elevatorrequired
4p2987
Feb 9, 2001
Dob violation - resolved - Elevator elevatorrequired
4p2988
Apr 28, 2000
Dob violation - resolved - Elevator elevatorrequired
4p2987
Apr 28, 2000
Dob violation - resolved - Elevator elevatorrequired
4p2988
Aug 30, 1999
Dob violation - resolved - Elevator elevatorrequired
4p2987
Aug 30, 1999
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 1990
Dob violation - resolved - Elevator elevatorrequired
25-cover
Mar 14, 1990
Dob violation - resolved - Elevator elevatorrequired
(51) replace worn contacts on controller (52) remove oily rags from around machine and top of car
Mar 8, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) replace worn contacts on controller (52) repair 3rd and 5th floor door lock keepers
Mar 8, 1989
Dob violation - resolved - Elevator elevatorrequired
(33)for fully proper swing.(47)a*replace broken light fixture switch.b*replace broken glass to motor room window.c*repair motor room door lock & lock same.(51)clean car top.(52)repair car top light.(53) file a bn & obtain a permit from this dept. for refurbished cab walls (54)provide cap. plate (2000lbs).(55)water proof motor room walls
Aug 25, 1988
Dob violation - resolved - Elevator elevatorrequired
(05)remove cable slippage.(15)secure from top of car.(36)7th fl (38)provide cover & secure same.(47)a*water proof motor room walls.b* replace broken glass to windows.(51)file a bn & obtain a permit from this department for refurbished cab walls.(52)provide in cab capacity plate.(53)repair car top light.(54)clean car top
Aug 25, 1988
Dob violation - resolved
ECB violations · 23
- Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control912387.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note: at time of inspection observe, missing/damage fire escape landing side supporting bracket (l bracket metal) which is supporting railing on 4
Aug 23, 2017 · Penalty $250
Resolve - Class - 1
Failure to take and provide safety measures (sidewalk shed,netting,etc)where required to protect and secure public safety from unsafe facadeas per 1rcncy 103-04 facade technical report file unsafe by pe/ra on 4
Jan 23, 2013 · Penalty $2,400
Resolve - Class - 2
28-302.5)failure to erect safety measures to protect the public from known hazerdous conditions.noted:upon filing fisp3:notification of unsafe conditions on 5/16/12.no safety measure have been installed.rem:imm
May 23, 2012 · Penalty $400
Resolve - Non-hazardous
B4b,50,4b,50a,b,c,d,e.haz.b4b - 350 = 4b-low water cut off inoperativemust repair or replace control immediately!!also recommend to install secondary low water cut off.haz 4b4 50a-missing safety guard for intak
Mar 25, 2008 · Penalty $800
Resolve - Non-hazardous
38o02.39o02.41g11.51k11.55y13.55y02.86bb05. 38o02 oil & dirt on car top 41g11 replace with correct (inspec) fuses 51k11 replace (rougged) hoist rer. 55y13 55y02 hoist machine is leaking oil properly seal leak
Feb 13, 2008
Resolve - Non-hazardous
39o02.39o02.44o02.55y13.55y02.86bb05. 38o02 oil on car top 55y13 55y02hoist machine is leaking oil properly seal leak & clean oil from machine & fl 86bb05 2 yr test tab is exp. 02-05
Feb 13, 2008
Resolve - Non-hazardous
58l01/07l10. 58- elevator stops abruptly going into 7th fl & other fl adjust stopping. 07- reopening button.
May 17, 2006
Resolve - Non-hazardous
51-k-02/ 51 hoist ropes rusting
Mar 13, 2006 · Penalty $180
Resolve - Non-hazardous
08v,74m,50o,14m,13m. no metal container with cover in motor room for oily and greasy rags.
Jan 4, 1999
Resolve
Show 13 more ↓
- Non-hazardous
50y,74m,53x,50o,14m,13m. no metal container with cover in motor room for oily and greasy tags
Jan 4, 1999
Resolve - Non-hazardous
50f75r57o08v
Apr 10, 1998
Resolve - Non-hazardous
50y75r57o08v
Apr 10, 1998
Resolve - Non-hazardous
75t,35o,35#,57o,73o,21l. 75 perform test and tag device file elv 3 form 35 machine room walls repair.
Jul 12, 1996
Resolve - Non-hazardous
75t,35o,35#,55o,73o. 75 perform test and tag device file elv 3 form 35 machine room wall repairs.
Jul 12, 1996
Resolve - Non-hazardous
74i,28h,9m,37g,57o,03v,50y,35u. 74 ll#5 key switch in car.# eliminate excessive side play in car.#(9)2 gibs,#(3)top of car.#(35)device tags as per code(208.10)
Jul 31, 1995
Resolve - Non-hazardous
74l,9m,03y,37g,57o,50y. 74 provide device tags as per nyc bldg code(208.10)#9 two gibs. #3 top of car.
Jul 31, 1995
Resolve - Non-hazardous
74b,50y,15l, 74-remove old controller from roof. 15- 2nd floor
Mar 1, 1993 · Penalty $100
Resolve - Non-hazardous
74b,18m,37g, 74-remove old controller from roof. 18 cover 6th floor
Mar 1, 1993
Resolve - Non-hazardous
73#,03o,35r, 73- perform 5 year test and tag device properly and file elev- form #3 03- top of car 35-remove old controller.
Jun 24, 1992
Resolve - Non-hazardous
73#,03o,35r, 73-perform 5 year test and tag device proprly and file elv- form #3 - 03 top of car 35- remove old controller.
Jun 24, 1992
Resolve - Non-hazardous
73#,35o,57o,73 five year test and file elv3
Nov 7, 1990 · Penalty $75
Resolve - Non-hazardous
73#,73 five year test and file elv3
Nov 7, 1990
Resolve
Complaints
- Plumbing
Water supply
Jan 20, 2026 · Apt 6A
Close - Plumbing
Water supply
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2025 · Apt 5K
Close - Unsanitary condition
Pests
Sep 11, 2024 · Apt 5H
Close - Unsanitary condition
Pests
Dec 13, 2023 · Apt 5D
Close - Safety
Window guard broken/missing
Dec 13, 2023 · Apt 5D
Close - Water leak
Heavy flow
Aug 25, 2023 · Apt 6L
Close - Heat/hot water
Entire building
Dec 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Door/window
Door
Mar 2, 2022 · Apt 4P
Close
Show 40 more ↓
- Unsanitary condition
Mold
Mar 2, 2022 · Apt 4P
Close - Flooring/stairs
Floor
Mar 2, 2022 · Apt 4P
Close - Unsanitary condition
Pests
Mar 2, 2022 · Apt 4P
Close - Paint/plaster
Wall
Mar 2, 2022 · Apt 4P
Close - Water leak
Damp spot
Mar 2, 2022 · Apt 4P
Close - Heat/hot water
Entire building
Mar 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2022 · Apt 4P
Close - Unsanitary condition
Pests
Jan 31, 2022 · Apt 4P
Close - Paint/plaster
Wall
Jan 31, 2022 · Apt 4P
Close - Water leak
Slow leak
Jan 31, 2022 · Apt 4P
Close - Flooring/stairs
Floor
Jan 31, 2022 · Apt 4P
Close - Door/window
Door
Jan 31, 2022 · Apt 4P
Close - Paint/plaster
Wall
Jan 31, 2022 · Apt 4P
Close - Unsanitary condition
Mold
Jan 31, 2022 · Apt 4P
Close - Plumbing
Water supply
Aug 24, 2021 · Apt 6S
Close - Unsanitary condition
Mold
Jun 8, 2021 · Apt 5P
Close - Unsanitary condition
Mold
May 23, 2021 · Apt 5C
Close - Heat/hot water
Entire building
Mar 5, 2021 · Apt 1J
Close - Heat/hot water
Entire building
Feb 18, 2021 · Apt 7R
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt 5C
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt 5U
Close - Flooring/stairs
Floor
Oct 16, 2017 · Apt 3J
Close - Flooring/stairs
Floor
Oct 16, 2017 · Apt 3J
Close - Appliance
Refrigerator
Aug 21, 2017 · Apt 2K
Close - Unsanitary condition
Garbage/recycling storage
Jul 20, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2017 · Apt 6J
Close - Plumbing
Water supply
Aug 24, 2016 · Apt 7H
Close - Door/window
Door
Aug 24, 2016 · Apt 7H
Close - Appliance
Refrigerator
Aug 24, 2016 · Apt 7H
Close - Unsanitary condition
Pests
Aug 24, 2016 · Apt 7H
Close - Plumbing
Water supply
Aug 24, 2016 · Apt 7H
Close - Appliance
Refrigerator
Aug 20, 2016 · Apt 78H
Close - Plumbing
Water supply
Aug 20, 2016 · Apt 78H
Close - Plumbing
Water supply
Aug 20, 2016 · Apt 78H
Close - Door/window
Door
Aug 20, 2016 · Apt 78H
Close - General
Cabinet
Apr 25, 2016 · Apt 5A
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 6, 2026 | $255,000 | Coops - elevator apartments | — |
| Jun 1, 2026 | $230,000 | Coops - elevator apartments | — |
| May 26, 2026 | $375,000 | Coops - elevator apartments | — |
| May 19, 2026 | $180,000 | Coops - elevator apartments | — |
| May 14, 2026 | $490,000 | Coops - elevator apartments | — |
| Apr 23, 2026 | $369,000 | Coops - elevator apartments | — |
| Feb 12, 2026 | $180,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1959
- Floors
- 6
- Residential units
- 114
- Building area
- 99,530 ft²
- Lot area
- 27,415 ft²
- Zoning
- R6
- Community board
- 406
- Council district
- 24
- Block / lot
- 2166 / 1
- Assessed value
- $3,273,750
- Landmark / historic district
- No
HPD registration #403784, last renewed Sep 24, 2025.
Questions about 62-59 108 Street
Who owns 62-59 108 Street?
The owner of record in NYC Department of City Planning PLUTO data is 62-59 108th St Owners INC.
Does 62-59 108 Street have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 62-59 108 Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 4% of its 114 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 62-59 108 Street built?
City records list 1959 as the year it was built.
How many apartments are in 62-59 108 Street?
It has 114 residential units and 115 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.