57-41 Granger Street
Queens, NY 11368BBL 4-01951-0010Map
Owner of record: Granger Street Realty LLC
57-41 Granger Street is an elevator apartment building built in 2019 in Queens, 11368. It has 20 residential units across 5 floors. The owner of record is Granger Street Realty LLC. HPD has recorded 18 housing violations here, most recently on June 5, 2025. 1 of the 18 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 18
- DOB violations
- 1
- ECB violations
- 23
- HPD complaints
- 12
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from east at south
Jun 5, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Jun 5, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jun 5, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Aug 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt 4d, 4th story, 1st apartment from west at north
May 11, 2023 · Apt 4D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... aprrox 3 sq ft at ceiling in the 2nd bathroom from north at east located at apt 4d, 4th story, 1st apartment from west at north
May 11, 2023 · Apt 4D
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 11, 2023
Closed — Violation dismissed
Show 8 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at west located at apt 4d, 4th story, 1st apartment from west at north
May 11, 2023 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the 1st room from north at west located at apt 4d, 4th story, 1st apartment from west at north
May 11, 2023 · Apt 4D
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 11, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 11, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... aprrox 3 sq ft at ceiling in the 2nd bathroom from north at east located at apt 4d, 4th story, 1st apartment from west at north original violation 15974722 issued 11-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 11, 2023 · Apt 4D
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed
ECB violations · 23
- Class - 1
Failure tomaintain adequate housekeeping per section requirmeents noteat the time of my inspection of a 5 stroy jobsite construction were ongoing i observed inadequate housekeeping at exp 3 housekeeping consist
Dec 7, 2020 · Penalty $625
Resolve - Class - 1
Work without a permit at the time of my inspection of a 5 story jobsite constriction work ongoing i observed retaining wall above 5 ft without permit being constuction at exp 3 stop retaining wall construction
Dec 7, 2020 · Penalty $1,250
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection at the time of my inspection of a 5 story construction site construction work ongoing i observed missing construction fence at exp 3 and 4
Dec 7, 2020
Resolve - Class - 1
Failure to provide protetction at sides of excavation note at the time of my inspection of a 5 story hobsite i observed excavation deeper than 6 feet with no shoring or support along excavated wall no shoring
Dec 7, 2020 · Penalty $5,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at the of inspection i observed balconies were completed at exp#1 on oct 27,2020 issued a pswo for no exterior operation at exp#1 due to inadequate
Nov 6, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to provide pedestrian protection for sidewalks and walkways.atthe time of inspection on a 5 story nb with the building height 49 feet observed balconies at exp#1 not completed missing metal railing with
Oct 27, 2020 · Penalty $5,000
Resolve - Class - 2
Bc33014-inspection logs(safety straps)at time of inspection i observedconcrete inbedded safety,straps installed at enclosed perimeters of exposure 1&3.workers were actively using safety system,upon request from
Feb 29, 2020 · Penalty $625
Resolve - Class - 2
Bc330765101-inspection(sidewalk shed)i observed a sidewalk shed at exposure 1,upon request for an inspection be from the cs he informed he did not maintain one,contrary to code requirements.remedy:maintain a sw
Feb 29, 2020 · Penalty $625
Resolve - Class - 1
Construction superintendent failed to perfrom duties per code.at time of inspection premises under nb#421724487(source job)which lequiles a superintendent or competent person.worker manuel ixtos states that"he
Jan 30, 2020 · Penalty $10,000
Resolve - Class - 1
3301.2=failure to provide means of egress at the time of my inspection 5 sty nb active site at 4 sty deck level observed worker performing their job at 4 sty deck where there was no means of egress of access po
Nov 27, 2019 · Penalty $2,500
Resolve
Show 13 more ↓
- Class - 1
3307.2.6=requirements for sidewalk temporary walkwyas foort bridges & pathways at time of inspection on a proposed 5 story new buildings white concrete operatiosn were taking place (3rd floor slab) with an adeq
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
3301.2=overhead proetction at time of inspection on a proposed 5 story new buidling white concrete operations were taking place on 3rd floor slab observed at exposure #4 (corbers o #3 #4 ) no overhgead protecti
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
3309.10=roof protection exposure #4 (#1 awning) at time of inspection on a proposed 5 stroy new buidling with concrete operatons in prpogress (3rd floor slab) onbserved rebar erected more thna 48 inches above a
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder fialed to ensure that eahc worker received required site safety oreintation at time of insoection ona proposed 5 story building while concrete operatons were taking place (3rd floor slab) observed
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
3307.7=failure to maintain jobsite fence where required at time of inbspection on a proposed 5 story new buidling with concrete operations in progress (3rd floor slab) observed fence panel removed at exposure #
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
3301.2=protection of electrical line son top of sidewalk shed expo #1 at tiem of inspection on a proposed 5 stroy new building observed at exposure #1 on top of sidewalk shed where workers were observed receivi
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 1
3305.3.3.2=farmwork inspection at timne of inspection on a proposed 5 story buidling with concrete opertaoins in progress (3rd floor slab) observed farmwokr in place onfloors #1 and #2 floors while concrte eis
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 2
3303.15.1=collection & containment(washout box) at tim eof inspection on a propose 5 story new building with concrete operations in progress (3rd floor slab) observed no washout box on site plastic sheetings wa
Nov 9, 2019
Resolve - Class - 2
Work does not conform to approved construction documents site safty plan at tim eof inspection on a proposed 5 story new buidling with concrete operations in progress observed a concrete truck & pump at exposur
Nov 9, 2019
Resolve - Class - 1
3309.14=protetcion of windows at time of inspection of a proposed 5 story building with concrete operations in progress (3rd floor slab) observed no window proetction in place for adjacent property exposure #4
Nov 9, 2019 · Penalty $2,500
Resolve - Class - 2
3307.2.3=temporary public wlakway within the site at tim eof inspection on aproposed 5 story building with concrete operation in progress observed at exposure #1 missing protetcion enclosing the gap between the
Nov 9, 2019
Resolve - Class - 1
Failure of permit holder to maintain records of (site specific) preshift afety meetinsg for each worker at time of inspection on a 5 story new building observed approxmately 10-15 workers on site while concrete
Nov 9, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. in response to above mentioned complaint #4783367 i observed both horizontal and vertical cracks and adjacent property exposure
Jul 27, 2019 · Penalty $10,000
Resolve
Complaints
- Paint/plaster
Wall
Apr 3, 2025 · Apt 4A
Close - Plumbing
Toilet
Apr 3, 2025 · Apt 4A
Close - Water leak
Heavy flow
Apr 3, 2025 · Apt 4A
Close - Paint/plaster
Wall
Aug 21, 2023 · Apt 4D
Close - Door/window
Door
Aug 21, 2023 · Apt 4D
Close - Electric
Lighting
Dec 16, 2022 · Apt 4D
Close - Heating
Heat related
Dec 27, 2008 · Apt 1
Close - Electric
Electric-supply
Dec 27, 2008 · Apt 1
Close - Electric
Electric-supply
Dec 27, 2008 · Apt 1
Close - Electric
Electric-supply
Dec 27, 2008 · Apt 1
Close
Show 2 more ↓
- Electric
Electric-supply
Dec 27, 2008 · Apt 1
Close - Nonconst
Vermin
Dec 27, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2019
- Floors
- 5
- Residential units
- 20
- Building area
- 17,418 ft²
- Lot area
- 7,300 ft²
- Zoning
- R6B
- Community board
- 404
- Council district
- 21
- Block / lot
- 1951 / 10
- Assessed value
- $1,579,950
- Landmark / historic district
- No
HPD registration #433934, last renewed Aug 26, 2025.
Questions about 57-41 Granger Street
Who owns 57-41 Granger Street?
The owner of record in NYC Department of City Planning PLUTO data is Granger Street Realty LLC.
Does 57-41 Granger Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 57-41 Granger Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 57-41 Granger Street built?
City records list 2019 as the year it was built.
How many apartments are in 57-41 Granger Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.