55-12 102 Street is a walk-up apartment building built in 2022 in Queens, 11368. It has 6 residential units across 4 floors. The owner of record is 55-12 Zheng Property INC.. HPD has recorded 1 housing violation here, most recently on May 11, 2026.
- HPD violations
- 1
- DOB violations
- 5
- ECB violations
- 39
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed
DOB building violations · 5
- Construction other optional
Borough commissioner has ordered work stopped for #421928472 due to superintendent of construction withdrawal.
Jan 28, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 19, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed
ECB violations · 39
- Class - 1
Upon entering active new 4 story building, building topped off, i asked to see random workers sst cards, 1 worker on-site (angel j. angamarca) and a man who arrived 30 minutes later((luis vera) did not have the
Jul 5, 2023
Resolve - Class - 2
Upon entering active new 4 story building, approx. 5 workers on-site, i asked to speak with the c.s> or comp. person,i was informed neither was on-site, after approx. 30 mins. a man arrived claiming to be comp.
Jul 5, 2023
Resolve - Class - 2
Upon walkiing entire active new 4 story building, approx 5 workers on site, i was unable to locate a restroom, upon asking the workers where the restroom was, i was informed there was no restroom available on-s
Jul 5, 2023
Resolve - Class - 2
Upon walking entire new 4 story building, approx 5 workers on-site, i observed 2 fire extinguishers on the 1st floor, i was unable to determine when last inspection due to no tags on extinguishers, both not ful
Jul 5, 2023
Resolve - Class - 2
Upon entering active 4 story building approx 5 workers on-site observed formwork erected on bulkhead for coping concrete pour, also observed no overhead protection was in place for the adjoining rear yard at ex
Jul 5, 2023
Resolve - Class - 2
At time of my inspection, i observed a construction wood fence surrounding the property, upon checking in dob record it showed that the construction fence permit expired on 04/09/2023 comply with code
Apr 18, 2023
Resolve - Class - 2
Supported scaffold at exp#1 not conforming to codes debris netting not enclosing full perimeter of supported scaffold, safety guardrails and end rails missing, deck is not fully planked, scaffold is close to th
Dec 31, 2022
Resolve - Class - 2
At time of my inspection observed active job site supported pipe scaffold installed perimeter of the building exposure 1, 2, 3 and exposure one up to roof level over 40 feet height not obtain permit as required
Aug 25, 2022
Resolve - Class - 1
At time of my inspection observed supported pipe scaffold installed perimeter of the building exposure 1, 2, 3 up to roof level with did not maintain as required. the scaffold missing guardrails, netting, loose
Aug 25, 2022 · Penalty $625
Resolve - Class - 1
Failure to provide roof protection. i observed active job site. 4 story building roof level under construction. the building exposure 4 adjoining property 3 story building roof did not provided roof protection
Aug 25, 2022 · Penalty $625
Resolve
Show 29 more ↓
- Class - 2
Superintendent was not onsite. competent person onsite did not have knowledge about documents required by chapter 33 to be kept and filled out daily onsite. for instance, upon request cp did not provide pre-sh
Aug 18, 2022 · Penalty $2,500
Resolve - Class - 2
Competent person onsite did not provide documents- for instance, no site safety plans, no pre-shift safety meeting log, no supported scaffold daily inspection log.provide and maintain documents required by chap
Aug 18, 2022
Resolve - Class - 1
Bc3309.1 failure to provide overhead protection for adjoining propertyroof.noted:at the time of my inspection of active new bldg job site i observed work being performed on cmu walls at roof level.at exp.#4 app
Mar 29, 2022 · Penalty $625
Resolve - Class - 2
Failure to perform proper concrete washout procedures i observed active worksite in progress of pouring concrete for 2fl roof slab.concrete washout water process during pour was inadequately collected on 102nds
Dec 14, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection observed large piles of construction debris and combustible materials housekeeping at a site must adhere to this section
Dec 9, 2021
Resolve - Class - 2
Bc 3314.1 scaffolds utilized in conjunction with construction or demolition of a building or structure shall be erected and maintained.at time of inspection observed a supported scaffold in place at exposure 1,
Dec 9, 2021
Resolve - Class - 1
Bc 3305.2 structural steel assembly.at time of inspection observed fabricated steel structural beams and many off cuts.field cut fabricationmust follow the provisions of the aisc(american institute of steel con
Dec 9, 2021 · Penalty $625
Resolve - Class - 2
Bc28-116.2.3 failure to provide anadequant inspection program tr-3 technical report light weight concrete design mix.as noted:at time of inspection at an active construction site.fl #1,#2 on metal deck was plac
Dec 1, 2021
Resolve - Class - 1
Failure to provide sidewalk shed where required. noted: at time of my inspection of a new 4 sty bldg,construction in progress at the top of the 2nd fl(approx 20ft)& approx 16ft from the sidewalk,upon reviewing
Oct 28, 2021
Resolve - Class - 2
Sec. bc 3301.6.1 platform design drawings-none. noted: at time of my inspection of a new 4 sty bldg construction in progess at the top off the 2nd fl. approx 7 workers on site,upon reaching the 2nd fl,i observe
Oct 28, 2021
Resolve - Class - 1
Sec. 28-105.12.8 site conditions contrary to site safety plan. noted: at time of my inspection of a new 4 sty bldg,construction in progress at the top of the 2nd fl. approx 7 workers on site,after walking the
Oct 28, 2021 · Penalty $2,500
Resolve - Class - 2
Bc33012-no safety measures/egress blocked/obstruction.at the time of inspection,this was proposed a 4 storied buildling.construction site was active and performing boomwork at foundation phase.i observed there
Aug 2, 2021
Resolve - Class - 2
Bc33012-failure to institute safety equipment measures/uncapped rebar.at the time of inspection,construction site was active an performing formwork at foundation phase.i observed uncapped rebar at multiple loca
Aug 2, 2021
Resolve - Class - 2
Bc330372-failure to comply with new york city fire code.at the time ofinspection this was proposed 4 storied active construction site performing formwork at foundation phase.i observed there was no secured fire
Aug 2, 2021
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperation.at the time of inspection this was proposed 4 storied building.construction site was active and performing boomwork in foundation
Aug 2, 2021 · Penalty $500
Resolve - Class - 2
Failure to provide approved.accepted plans construction documents at jobsite at the time of my inspection as noted at the time of my inspection on an active construction site i observed at exposure #3 (rear sid
May 25, 2021
Resolve - Class - 2
Temporary construction equipment onsite-expired permit fence.at the time of inspection inactive jobsite,i observed temporary construction equipment-construction fence in place at exposure 1,2,3 and at front yar
Feb 18, 2021
Resolve - Class - 2
28-105.9 work w/o a permit(construction plywood fence permit expired).as noted:at time of inspection const site was closed. i observed constplywood fence permit has expired on 9/8/2020 permit#q00232074-i1-fn. r
Oct 16, 2020
Resolve - Class - 1
Failure to comply w/the comm's order to obtain a permit per nov#34812780p,issued 12-24-09for work w/o permit-cellar.rem:comply w/code
Jun 17, 2011 · Penalty $12,000
Resolve - Class - 1
Unlawful acts. fail to comply w/an order of the commissioner. respondent failed to correct the conditions cited in nov# 34812780p for illegal work in cellar. rem:comply w/commissioner's order.
Apr 8, 2011 · Penalty $24,000
Resolve - Class - 1
Unlawful acts.failure to comply w/an order of the comm's respondent failed to correct the violating condition cited in nov#34812780p.water&waste lines in the cellar and timber framed structure w/3pc bathroom @
Feb 7, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/ an order of the comms respondent failed to correct the conditions cited in the prior notice of violation #34812780p having constructed at cellar full height partitions installed water & was
Nov 5, 2010
Resolve - Class - 2
Failure to comply w/ the comm's order to file a cert of correction w/ dob.noted:respondent failed to comply w/ the comm's order to correct the violating conditions & file a cert of correction pursuant to 28-204
Nov 5, 2010
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect the condition(s) noted in prior nov #34812780p erected class aapt in cellar and erected wood structure in rear yard w/installation
Sep 21, 2010 · Penalty $12,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances noted at rear yard steel framed awning attached to house partially collapsed w/ support angles detached from house and rear support bracket pulling away from hous
Sep 21, 2010 · Penalty $5,000
Resolve - Class - 1
Failure to comply with comm's order to correct vio#34812780p for work w/o permit @ cellar installed 1-class "a"apt & @ rear wood extension built no record of correction.rem:comply w/comm's order & obtain permit
May 10, 2010 · Penalty $12,000
Resolve - Class - 1
Residence altered for occupancy as a dwelling for more than the legally approved # of families dept of building records indicates premises to be legally approved for 1 family cellar boiler & storage residence
Dec 24, 2009 · Penalty $1,450
Resolve - Class - 1
Work w/o a permit work noted: at cellar level erected partitions & installed water & waste lines for 3pc bathroom (sink,toilet,shower) residencetial sink & electric stove at rear of premises erected 1 story woo
Dec 24, 2009
Resolve - Non-hazardous
Work w/o a permit. work noted: at rear of premises yard erected a wood frame canopy approx: 10'-0 x 10'-0 x 8'high supported by 4 wood columns. remedy: obtain permit or restore to prior legal condition.
Apr 22, 2008
Resolve
Complaints
- Heating
Heat related
Nov 27, 2009 · Apt 12
Close - Nonconst
Rubbish
May 27, 2008 · Apt 1FL
Close - Nonconst
Rubbish
May 27, 2008 · Apt BSMN
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 25, 2026 | $2,272,050 | Rentals - walkup apartments | 6 |
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 2022
- Floors
- 4
- Residential units
- 6
- Building area
- 4,404 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6B
- Community board
- 404
- Council district
- 21
- Block / lot
- 1939 / 49
- Assessed value
- $326,250
- Landmark / historic district
- No
HPD registration #434689, last renewed May 5, 2026.
Questions about 55-12 102 Street
Who owns 55-12 102 Street?
The owner of record in NYC Department of City Planning PLUTO data is 55-12 Zheng Property INC..
Does 55-12 102 Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 55-12 102 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 55-12 102 Street built?
City records list 2022 as the year it was built.
How many apartments are in 55-12 102 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.