roofy

55-06 102 Street

Queens, NY 11368BBL 4-01939-0046Map

Owner of record: 40-11 190 St LLC

55-06 102 Street is a walk-up apartment building built in 2022 in Queens, 11368. It has 7 residential units across 4 floors. The owner of record is 40-11 190 St LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
2
ECB violations
12
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 2

  • Construction other optional

    The borough commissioner has issued a notice of intent to revoke permit & order to stop work immediately. stop all work on job # q00568483.

    May 23, 2023

    Dob violation - dismissed
  • Construction other optional

    The borough commissioner has issued a notice of intent to revoke permit & order to stop work immediately. stop all work on job# q00663462.

    May 23, 2023

    Dob violation - dismissed

ECB violations · 12

  • Class - 2

    At the time of inspection, observed installed main structure beam connection details did not conform to the plan. plan details shows 24" angle with 3 anchor bolts but installed angles were less than 12" with 2

    Jul 27, 2023

    Resolve
  • Class - 2

    At the time of inspection, observed inadequate vertical egress from cellar level to ground level. temporary stair was installed without design drawings. also, the landing was not comply with code required clear

    Jul 27, 2023

    Resolve
  • Class - 2

    28-116.2.3 failure to provide an adequate inspection program tr-3 technical report concrete design mix, 4000 psi lightweight. as noted: at time of my re-inspection 4 story new building complete to roof level, i

    May 18, 2023 · Penalty $1,280

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.as noted:at time of my re-inspection 4 story new building completed to roof level.i observed at exposure#1,#3 floor#3,#4 missi

    May 18, 2023 · Penalty $1,280

    Resolve
  • Class - 2

    Temporary construction equipment on site-expired permit.as noted:at time of inspection on active construction site observed construction plywood fence in place job site & construction plywod fence permit expire

    Feb 1, 2023

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.as noted:at time of inspection observed at exp #1 directly in front of job site large delivery truck completely blocking public si

    Feb 1, 2023 · Penalty $10,000

    Resolve
  • Class - 2

    Four story building in progress, cmu work at exp#1, i noticed that construction fence not maintained per code, fence panels out of plumb, unwanted graffiti on the fence creating nuisances in the area.maintain t

    Dec 12, 2022

    Resolve
  • Class - 1

    At the time of inspection on proposed active nb jobsite, upon request for records on pre-shift safety meeting to ensure workers performing construction activities attend pre-shift prior to star of work, none w

    Nov 10, 2022 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection on active 4 story nb jobsite, cs on records for job addresses-55-06 102 st-qn & 55-04 102 st-qn present at site. upon request for designated competent person by cs for each jobsite. as per

    Nov 10, 2022

    Resolve
  • Class - 2

    At the time of inspection on proposed 4 story active nb active jobsite, i observed a ladder used as means of access to 1st floor level for workers performing work on 1st fl not secured or tied-back. this condit

    Nov 10, 2022

    Resolve
Show 2 more ↓
  • Class - 1

    At the time of inspection on proposed 4 story active nb jobsite, i observed stored const material (corrugated/ galvanized sheeting) in place on ist fl level steel joist close to leading edge of approximately

    Nov 10, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of inspection on proposed 4 story nb active jobsite, i observed in place at exp#-1 entrance walkway to jobsite missing overhead protection for workers performing construction activities. this condit

    Nov 10, 2022 · Penalty $5,000

    Resolve

Complaints

  • Heating

    Heat related

    Jan 5, 2006 · Apt 1FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2022
Floors
4
Residential units
7
Building area
5,682 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
404
Council district
21
Block / lot
1939 / 46
Assessed value
$382,950
Landmark / historic district
No

Questions about 55-06 102 Street

Who owns 55-06 102 Street?

The owner of record in NYC Department of City Planning PLUTO data is 40-11 190 St LLC.

Does 55-06 102 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 55-06 102 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 55-06 102 Street built?

City records list 2022 as the year it was built.

How many apartments are in 55-06 102 Street?

It has 7 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.