35-24 103 Street
Queens, NY 11368BBL 4-01743-0018Map
Owner of record: Ramon, Manuel D
35-24 103 Street is a two-family home built in 1920 in Queens, 11368. It has 2 residential units across 2 floors. The owner of record is Ramon, Manuel D. HPD has recorded 62 housing violations here, most recently on April 11, 2004. 50 of the 50 most recent violations are still open.
- HPD violations
- 62
- DOB violations
- 0
- ECB violations
- 8
- HPD complaints
- 67
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 62
- BHazardous
Properly repair the broken or defective ceiling light fixture in the 1st room from north located at apt 2, 2nd story
Apr 11, 2004 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2, 2nd story
Apr 11, 2004 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wire at ceiling in the 1st room from north located at apt 2, 2nd story
Apr 11, 2004 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wire at ceiling in the bathroom located at apt 2, 2nd story
Apr 11, 2004 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit entrance door at public hall, 1st story
Apr 2, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling throughout in the entire apartment located at apt 2fl, 2nd story
Apr 2, 2004 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2fl, 2nd story
Apr 2, 2004 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective ceramic tiles at north , south and west walls in the bathroom located at apt 2fl, 2nd story
Apr 2, 2004 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls all stories at public hall
Apr 2, 2004
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture in the bathroom located at apt 2fl, 2nd story
Apr 2, 2004 · Apt 2FL
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department at east, west, north and south walls in the bathroom located at apt 2, 2nd story
Apr 2, 2004 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative ceiling light fixture in the bathroom located at apt 2fl, 2nd story
Apr 2, 2004 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of expossed electrical wiring ceiling in the bathroom located at apt 2, 2nd story
Dec 30, 2003 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing ballusters (total 6) at fire stairs, 2nd story
Dec 30, 2003
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over at entire apartment, 2nd story, apartment
Dec 30, 2003 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wiring ceiling in the bedroom from east located at apt 2, 2nd story
Dec 30, 2003 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls thruout at entire apartment, 1st story, apartment
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass at door in the bathroom located at apt 2, 2nd story
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sub floor at 1st room from north, 2nd story, apartment
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wall ceramic tiles in the bathroom located at apt 2, 2nd story
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective floor ceramik tiles in the bathroom located at apt 2, 2nd story
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ballastrades at public hall , 1st story
Nov 24, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective sink base cabinet and counter top in the kitchen located at apt 2, 2nd story
Nov 24, 2003 · Apt 2
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylider lock key operate entrance door
Nov 24, 2003
Open — Nov sent out - BHazardous
Replace with new the missing ballusters at hand rail 1st.&2nd stry. at public hall
Nov 5, 2003
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical light fixture at ceiling. at bathroom, 2nd story, apartment
Nov 5, 2003 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective rubber gaskit arround refrigerator door. in the kitchen located at apt 2, 2nd story
Nov 5, 2003 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling. at bathroom, 2nd story, apartment
Nov 5, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles. in the bathroom located at apt 2, 2nd story
Nov 5, 2003 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective vestibule door lock. at public hall, 1st story
Nov 5, 2003
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at iron gate. at public hall, 1st story
Nov 5, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock at entrance door at public hall, 1st story
Oct 2, 2003
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder lock at entrance metal gate at public hall, 1st story
Oct 2, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling all sty at public hall
Oct 2, 2003
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture in the bathroom located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter top at base cabinet sink in the kitchen located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles around bathtub in the bathroom located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at street entrance metal gate to building.
Aug 21, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock assembly at street entrance door
Aug 21, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st bedroom from north located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd bedroom from north located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective entrance door in the bathroom located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ! in the bathroom located at apt 2, 2nd story
Aug 21, 2003 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the bathroom located at apt 2fl, 2nd story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 2fl, 2nd story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling throughout in the entire apartment located at apt 2fl, 2nd story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective counter top of kitchen sink in the kitchen located at apt 2fl, 2nd story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 2fl, 2nd story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing balusters first and 2ndsty public hall at public hall, 1st story
Jul 14, 2003 · Apt 2FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 8
- Hazardous
Failure to comply w/the commissioner order to obtain a permit per violation 34476727y. remedy: comply w/the order.
Mar 18, 2006 · Penalty $5,000
Active - Hazardous
Failure to comply with an order of the apartment to correct vio#344767274 on 3/19/05 for work w/o permit and all conditions noted on violation. remedy: obtain permit/restore to leagl
Nov 28, 2005 · Penalty $5,000
Active - Hazardous
Residence altered for occupancy as a dwelling for more than the legal number of families. dept of bldg records indicates residence to be legal 2 families. residence now altered and occupied as 2 families with 2
Nov 7, 2005 · Penalty $11,500
Active - Hazardous
Residence altered for occupancy a dwelling for more than the legally approved number of families dob records indicates residence to be legally approved 2 families residence now altered for occupancy for 3 pc
Jul 9, 2005 · Penalty $7,000
Active - Hazardous
Failure to comply with commissioners order in that vi #34476427y issued on 3-19-05 no permits of file to remove class a apt plumbing. remedy: conform to commissioners order.
Jul 9, 2005 · Penalty $5,000
Active - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families.dept of building records indicates residence to be legally approved 2 family.residence now altered and occupie
Mar 19, 2005 · Penalty $11,500
Active - Hazardous
Work without a permit.work noted:1.at cellar level installed water and waste lines for 3 piece bathroom(toilet,sink,shower).2.at second floor level erected partitions dividing living room into 2 room(bedrooms).
Mar 19, 2005 · Penalty $2,500
Active - Hazardous
Occupancy contrary to dept of building records.d.o.b. records indicate cellar to be boiler room and storage.illegal occupancy noted:at cellar level now used for dwelling with bedroom(bed,t.v. dresser)and 3 piec
Mar 19, 2005 · Penalty $2,500
Active
Complaints
- General
Cooking gas
Apr 24, 2004 · Apt 2
Close - Electric
Wiring
Apr 7, 2004 · Apt 2
Close - Electric
Electric-supply
Apr 7, 2004 · Apt 2
Close - General
Stairs
Apr 7, 2004 · Apt 2
Close - General
Stairs
Feb 27, 2004 · Apt 2
Close - Paint/plaster
Wall
Feb 27, 2004 · Apt 2
Close - Paint/plaster
Ceiling
Feb 27, 2004 · Apt 2
Close - Paint/plaster
Ceiling
Feb 27, 2004 · Apt 2
Close - Paint/plaster
Wall
Feb 27, 2004 · Apt 2
Close - Electric
Electric-supply
Feb 27, 2004 · Apt 2
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 27, 2004 · Apt 2
Close - Paint/plaster
Wall
Feb 27, 2004 · Apt 2
Close - General
Doors
Feb 25, 2004 · Apt 2
Close - Paint/plaster
Wall
Feb 25, 2004 · Apt 2
Close - General
Stairs
Feb 25, 2004 · Apt 2
Close - Electric
Lighting
Feb 25, 2004 · Apt 2
Close - General
Stairs
Dec 26, 2003 · Apt 2
Close - Appliance
Refrigerator
Dec 26, 2003 · Apt 2
Close - General
Doors
Dec 26, 2003 · Apt 2
Close - Plumbing
Water-leaks
Dec 26, 2003 · Apt 2
Close - Electric
Wiring
Dec 26, 2003 · Apt 2
Close - General
Ceramic-tile
Oct 16, 2003 · Apt 2
Close - Appliance
Refrigerator
Oct 16, 2003 · Apt 2
Close - General
Doors
Oct 16, 2003 · Apt 2
Close - General
Stairs
Oct 16, 2003 · Apt 2
Close - Plumbing
Basin/sink
Oct 15, 2003 · Apt 2
Close - Plumbing
Toilet
Oct 15, 2003 · Apt 2
Close - General
Floor
Oct 15, 2003 · Apt 2
Close - General
Floor
Oct 15, 2003 · Apt 2
Close - General
Stairs
Oct 15, 2003 · Apt 2
Close - Appliance
Electric/gas range
Oct 15, 2003 · Apt 2
Close - General
Doors
Oct 15, 2003 · Apt 2
Close - General
Locks
Oct 15, 2003 · Apt 2
Close - Plumbing
Water-leaks
Oct 15, 2003 · Apt 2
Close - General
Locks
Sep 30, 2003 · Apt 2
Close - Plumbing
Water-leaks
Sep 30, 2003 · Apt 2
Close - Plumbing
Basin/sink
Sep 24, 2003 · Apt 2FL
Close - General
Doors
Sep 24, 2003 · Apt 2FL
Close - Plumbing
Water-leaks
Sep 24, 2003 · Apt 2FL
Close - General
Floor
Sep 24, 2003 · Apt 2FL
Close - General
Cabinet
Sep 24, 2003 · Apt 2FL
Close - Plumbing
Basin/sink
Sep 24, 2003 · Apt 2FL
Close - Plumbing
Bathtub/shower
Sep 4, 2003 · Apt 2
Close - Plumbing
Toilet
Aug 11, 2003 · Apt 2
Close - Plumbing
Bathtub/shower
Aug 11, 2003 · Apt 2
Close - General
Doors
Aug 11, 2003 · Apt 2
Close - Plumbing
Water-leaks
Aug 11, 2003 · Apt 2
Close - General
Doors
Aug 11, 2003 · Apt 2
Close - Plumbing
Basin/sink
Aug 11, 2003 · Apt 2
Close - General
Locks
Aug 11, 2003 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,027 ft²
- Lot area
- 3,375 ft²
- Zoning
- R5
- Community board
- 403
- Council district
- 21
- Block / lot
- 1743 / 18
- Assessed value
- $55,740
- Landmark / historic district
- No
Questions about 35-24 103 Street
Who owns 35-24 103 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ramon, Manuel D.
Does 35-24 103 Street have violations?
Yes. NYC HPD has recorded 62 housing violations at this property.
Is 35-24 103 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 35-24 103 Street built?
City records list 1920 as the year it was built.
How many apartments are in 35-24 103 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.