41-40 Denman Street
Queens, NY 11373BBL 4-01566-0021Map
Owner of record: 41-40 Denman Street Ventures, LLC
41-40 Denman Street is an elevator apartment building built in 1961 in Queens, 11373. It has 122 residential units across 6 floors. The owner of record is 41-40 Denman Street Ventures, LLC. HPD has recorded 1,279 housing violations here, most recently on August 5, 2026. 42 of the 50 most recent violations are still open. City tax records listed 113 rent-stabilized apartments here in 2024.
- HPD violations
- 1,279
- DOB violations
- 68
- ECB violations
- 49
- HPD complaints
- 964
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,279
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition wall erected from floor to ceiling with door, subdividing room into two rooms in the 1st room from east located at apt 5w, 5th story, 4th apartment from west at north
Aug 5, 2026 · Apt 5W
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire stair a at public hall, 4th story
Jul 31, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire stair a at public hall, 5th story
Jul 31, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire stair a at public hall, 6th story
Jul 31, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening slide bolt lock in the entrance located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower counter balance at the west 1 and west 2 windows in the 1st room from north at east located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lower counter balance at the west 1 and west 2 windows in the 1st room from north at west located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at the west wall in the kitchen located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the east wall in the bathroom located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout and mortar joints at north, east and south walls in the bathroom located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at the north wall in the bathroom located at apt 6p, 6th story, 5th apartment from south at west
Jul 31, 2026 · Apt 6P
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 3rd story
Jul 31, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire stair a at public hall, 3rd story
Jul 31, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercommunication system from building front to north wall panel in the foyer located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floors in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste drain line at sink in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq feet at north wall and ceiling in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at south wall in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective grout and mortar joints at north, east and west walls in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection at water c.oset in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at wash basin in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater then 30 sq feet at the east and south walls in the 1st room from east at south located at apt 4n, 4th story, 1st apartment from north at east
Jul 31, 2026 · Apt 4N
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective east wood base cabinet floor in the kitchen located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste drain line at the sink in the kitchen located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at the north wall in the kitchen located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east at north located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from east at south located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east walls in the 2nd room from east at south located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, and east walls in the bathroom located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east walls in the bathroom located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at east wall in the bathroom located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4t, 4th story, 4th apartment from north at east
Jul 31, 2026 · Apt 4T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical ventilation at the north wall in the bathroom located at apt 3r, 3rd story, 4th apartment from south at west
Jul 31, 2026 · Apt 3R
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lower counter balance at the west 1 window in the 2nd room from north located at apt 3r, 3rd story, 4th apartment from south at west
Jul 31, 2026 · Apt 3R
Open — Civ14 mailed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3r, 3rd story, 4th apartment from south at west
Jul 31, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at west wall in the kitchen located at apt 3r, 3rd story, 4th apartment from south at west
Jul 31, 2026 · Apt 3R
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material approx 30 sq feet at ceiling at boiler room
Jul 31, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the east window frame in the 1st room from east at north located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east 1 and east 2 window frame in the 1st room from east at south located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroom located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at west in the kitchen located at apt 4m, 4th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 4M
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at the washbasin in the bathroom located at apt 6m, 6th story, 2nd apartment from north at east
Jul 31, 2026 · Apt 6M
Open — Civ14 mailed
DOB building violations · 68
- Immediate emergency anythingoptional
.remedy; seal accessible openings
Jun 15, 2026
Dob violation - dismissed - Construction other optional
Emergency work order.at time of inspctn,obsrvd due to fire which originatd in apt 3b&traveld upwrds into the roof/cocklft area:roof joists,cocklft framng&roof deck w/minor to severe charrng over.ownr to immed engage nyspe&endrsd cntrctr to make the roof strctre stable& weathrtght via temp framng,deckng,shorng,temp
Jun 15, 2026
Dob violation - active - Construction other optional
Failure to maintain.at time of inspctn,obsrvd due to fire which orignatd in apt&traveld upwrds into the roof/cocklft area.roof joists, cocklft framng,&roof deck w/minor to severe charrng over "a".ownr to engage nyspe&endrsd cntrctr to eval the ent bldg & rpair under prmt file for prmts by 8/14/26.sgn off by 10/14/26
Jun 15, 2026
Dob violation - active - Construction other optional
Ewo on occupied parking structure 1 level below 6stories bldg.cracked wall,cracked concrete, exposed rebars, spalled concrete slab causing immedi hazard to vehicle/ped traffic req immed safe meas.remedy:owner to retain nys (rdp) to direct,supv installing of safe meas.progress report to [email protected]
Mar 21, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Construction other optional
Excavation and concrete operations observed at exp1 without a permit
Mar 16, 2021
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2018
Dob violation - resolved - Construction other optional
Borough commissioner ordered all work stopped for job # 421258114 due to revocation of filing privileges of applicant on record
Mar 13, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2009
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Aug 7, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2006
Dob violation - resolved
ECB violations · 49
- Class - 1
Failure to maintain - parking structure for 35726749m. observed occupied parking structure still in a state of deterioration with cracked/spalled structural walls, concrete beams, slabs and encasements, holes/g
Aug 10, 2026 · Penalty $6,250
Active - Class - 3
Summons issued for failure to maintain due to water damaged to interior walls in bedroom/living room area along damaged sheetrock around the walls in the windows in the bathroom of apartment 4n, repair and or r
Aug 2, 2026 · Penalty $500
Active - Class - 1
Failure to maintain parking structure insafe condition. at time of inspection on an occupied parking structure consisting of 01 level below 6 stories bldg. observed cracked structure wall at various locations,
May 27, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain parking structure in safe condition. note: at timeof inspection on an occupied parking structure consisting of 01 level below 6 stories bldg. observed cracked structure wall at various loc.,
Mar 21, 2026 · Penalty $2,500
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid #q0001029 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024 · Penalty $2,530
Active - Class - 1
Found entire device unoprable restore to service
May 21, 2024 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications.note:at time of inspection observed sidewalk shed at exp #1 missing high visibility indicators on vertical members for observed garage creating hazard of
Mar 17, 2023 · Penalty $2,400
Resolve - Class - 2
Failure to submit acceptable required cycle 8z report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #812280.agg1:prior nov 37014461k under 28-
Jun 1, 2021 · Penalty $3,125
Resolve - Class - 2
Phone in car operative. repair. cat 1 tag expired 1/1/2021. perform and file test.
Jan 22, 2021 · Penalty $312
Resolve - Class - 1
(c/u)05a10;02x10,68m07,70o2 (05-a-10)restrictor is not operative. thisis a safety device to ensure el. passengers safety. (02-x-10)phone is not operative. (68-m-07)provide maint log missing signage to 2019 and
Sep 13, 2019 · Penalty $1,250
Resolve
Show 39 more ↓
- Class - 1
Cu5x17; 68bb7. 4x-upon inspection. door zone. restrictor found inoperative. this is a safety device repair immediaely, repair restrictor and call dob for reinspection.
Mar 7, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to submit a requred cycle 8a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #812280.rem:submit required technical report
Feb 11, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg walls & appurtenances. @ time of insp observe on exp#1 east elevation: ac units on several flrs were inadequately supported, damage mortar joints @ several location & parapet,
Nov 27, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection.noted: construction manager/super failed to provide construction plans for ongoing work at site under job#421268988 for renovation of
Sep 1, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code compliant manner re: prohibited material. i observed in laundry rooms on east and west side of building gas fired dryers with prohibite gas flex connectors. igc 411.1.4.als
Sep 1, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. noted: at exp#1 excessive construction debris piled on pedestrian sidewalk,including doors, timber w/nails, bags of construction debris.
Sep 1, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved.accepted plans at job site at time of inspection.noted: construction manager/super failed to provide construction manager/super failed to provide construction plans for ongoing work
Sep 1, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code compliant manner:lack of a systemof automatic sprinklers where required per bc 903.2; 27-954. at time of inspection i observed gas fired dryers in 2 laundry rooms total of
Sep 1, 2016 · Penalty $1,000
Resolve - Class - 2
Electrical work w/o a permit. observed at 2pm in apt lw & 2h new installation of boxes,outlets,switches panel boxes & breakers & demo of the old electrical system. remedy: obtain permit.
Sep 1, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to maintain building noted:at front of building above main entrance, facade area approx 3ftx30ft with exposed bricks cracks and cei ling delaminating detaching.remedy:repair defects forthwith & maintain
Aug 8, 2016
Resolve - Class - 2
14m07,70o02,provide mirror 4p3596
Jul 31, 2014
Resolve - Class - 1
Failure to provide unobstructed exit passageway.note:@ground floor,right side hallway.exit door locked closed w/metal strap & screws,passageway beyond door excavated to an approx depth of 30" w/piping installed
Mar 26, 2014 · Penalty $1,200
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy of building dept records.cellar use changed from storage and ordinary useto an apt. partitions erected w/kitchen and bathroom facilities instal
Dec 20, 2013 · Penalty $1,200
Resolve - Class - 2
56y13,56o02,68b#,03m07,08v01,72m07: 68b#;maintenance log not up to date. 03m07;provide 24 hr emergency communication as per appendix k. 72m07;provide pit stop switch as per appendix k.
Sep 7, 2012 · Penalty $500
Resolve - Class - 2
14i11,08v01,56y13,56o02,39o02,52b14,68b#,72m07,03m07,40o02: 68bh;maintenance log not up to date. 72m07;provide pit stop switche as per appendix k. 03m07;provide 24 hr emergency communication as per appendix k.
Sep 7, 2012 · Penalty $500
Resolve - Class - 2
Failure to maintain ext bldg north elevation(exp#1)observed a/c sleeve metal cover stored on fire escape landing.south elevation(exp#3)observe step ladder,plastic containers,cable metal dish,flower pots stored
Jul 21, 2011 · Penalty $500
Resolve - Class - 2
Failure to provide safety measures (sdwlk shed)to protect public from hazardous condition.unsafe fisp technical report filed for cycle 6 on 08-07-2009.provide safety measure as per flsp rcny 103.04
Jul 13, 2011 · Penalty $500
Resolve - Class - 2
72m07,56y13,56o02,39o02,40o02,70o02. 72m07- provide pitstop such as per appendix k. 40o02- clean machine room flr.
Mar 18, 2011 · Penalty $250
Resolve - Class - 2
08v01,40b#,56y13,56o02,40o02,41i10,69m07,17h11,70o02,73o02,74o02,34o0240b- mach run fire extinguisher recharge or replace. 40o- oil on fl 17h- gibs where needed.
Mar 2, 2010 · Penalty $250
Resolve - Class - 2
56y13,56o02,69m07,41t07,05b01,70o02,73o02,74o02,34o02,17h11. 05b- car door reopens a little when car in flight. 17h- door gibs where needed.
Mar 2, 2010 · Penalty $250
Resolve - Class - 2
15m07.08v01.61m07.60q03.26s07.56y13.56o02.68m07.17h11.10h11.39o02.34o02.70o02.52e11.32h11 31m07 co sticker main line 52b11 anti-spin device
Jan 13, 2009 · Penalty $250
Resolve - Class - 2
60x10.60q03.56y13.56o02.59y02.31m07.40d06.68m07.17h11.70o02.34o02.26s07.08v01.56y02 oil brake pads 61m07 company sticker main line 40d06 smokehole unsecured
Jan 13, 2009 · Penalty $250
Resolve - Non-hazardous
Failure to provide elevator landing sign that shall read:"in case of fire use stairs,unless otherwise instructed"at the elevator bank on flr1 to 6.failure to provide 3-inch minimum high alphabetic letter of ide
Dec 7, 2005 · Penalty $800
Resolve - Non-hazardous
85bb05/88y13/83o02/17h11(17)maijn 2-5 floors
Mar 15, 2004 · Penalty $180
Resolve - Non-hazardous
85bb05/10h11/17h11(17)4 floor
Mar 15, 2004 · Penalty $180
Resolve - Non-hazardous
59,x,07 39,o,02 08,v,01 66,0,02 40,d,06 41,n,09 85,bb,05 41h remove by pass wire on fuse
Nov 5, 2003 · Penalty $180
Resolve - Non-hazardous
85,bb,05 66,0,02 08,v,01
Nov 5, 2003 · Penalty $180
Resolve - Non-hazardous
59m07-55x11-37o02-39g10-80#10-07b01-08v01-36o02-62o02. 80 - remove oil from roof.
Jan 13, 2003
Resolve - Non-hazardous
08v01-52y14-42h11-37o02-39g12-48q03-48q03-36y02-62o02. 42 gov making noise.
Jan 13, 2003
Resolve - Non-hazardous
46h12-16h12-09m07. 16-main floor & 3 floor 09-rear.
Sep 18, 2002
Resolve - Non-hazardous
06l01,14l11,18v01,50y14,03r09,57o02,74o02,74m07,13m07,74l11.06l-gate closing too fast.03r-remove card board from car ceiling.74o-top of car dirty.74m-capicity sigh.74l-car handrail loose.
Sep 20, 2000 · Penalty $180
Resolve - Non-hazardous
52h12,46k12,75u05,50y0238x11,57o02,16h12,74p17,07x11,. 52- replace brake lining. 74- no access to top of car. 07- repair door reopening. 16-replace hoistway door gibs.
Aug 5, 1998
Resolve - Non-hazardous
75u05,50y02,07x11,09h12,16h1274o02,. 74-clean top of car. 50-clean main machine. 16-replace hoistway door gibs. 09- replace car door gibs 75- perform and file 5 yr test.
Aug 5, 1998
Resolve - Non-hazardous
46h,50y.
Jan 13, 1995 · Penalty $100
Resolve - Non-hazardous
36m, 50y.
Jan 13, 1995 · Penalty $100
Resolve - Non-hazardous
46k,35u.
Dec 15, 1994 · Penalty $100
Resolve - Non-hazardous
75#,57o,22i.
May 4, 1993
Resolve - Non-hazardous
01l,22d,10m,52l,25l,20l,74m,74o,35p, (74)provide sign from company in motoroom.(74)clean top of car.
Jul 3, 1990 · Penalty $75
Resolve - Non-hazardous
74o,35p,25l,22d, (74)clean car top.
Jul 3, 1990 · Penalty $75
Resolve
Complaints
- Safety
Smoke detector
Aug 3, 2026 · Apt 5W
Close - General
Cooking gas
Jul 10, 2026 · Apt 4N
Close - General
Cooking gas
Jul 7, 2026 · Apt 4N
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt 3A
Close - Water leak
Slow leak
Jun 29, 2026 · Apt 4C
Close - Door/window
Window frame
Jun 29, 2026 · Apt 4C
Close - General
Cooking gas
Jun 26, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
May 24, 2026 · Apt 6F
Close - Water leak
Heavy flow
May 6, 2026 · Apt 3A
Close - Unsanitary condition
Mold
May 6, 2026 · Apt 3A
Close
Show 40 more ↓
- Door/window
Door
May 6, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 6, 2026 · Apt 3A
Close - Paint/plaster
Wall
May 6, 2026 · Apt 3A
Close - Electric
No lighting
May 6, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 27, 2026 · Apt 4N
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Feb 23, 2026 · Apt 1J
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Water leak
Damp spot
Feb 18, 2026 · Apt 6V
Close - Paint/plaster
Radiator
Feb 18, 2026 · Apt 6V
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 6V
Close - Plumbing
Bathtub/shower
Feb 18, 2026 · Apt 6V
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 6V
Close - Door/window
Door
Feb 18, 2026 · Apt 6V
Close - General
Bell/buzzer/intercom
Feb 18, 2026 · Apt 6V
Close - Door/window
Door
Feb 18, 2026 · Apt 6V
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 6V
Close - Paint/plaster
Wall
Feb 18, 2026 · Apt 6V
Close - General
Cabinet
Feb 18, 2026 · Apt 6V
Close - Paint/plaster
Wall
Feb 18, 2026 · Apt 6V
Close - Door/window
Door
Feb 18, 2026 · Apt 6V
Close - Unsanitary condition
Mold
Feb 18, 2026 · Apt 6V
Close - Unsanitary condition
Mold
Feb 16, 2026 · Apt 1J
Close - Plumbing
Basin/sink
Feb 16, 2026 · Apt 1J
Close - Electric
Outlet/switch
Feb 16, 2026 · Apt 1J
Close - Unsanitary condition
Mold
Jan 30, 2026 · Apt 4N
Close - Water leak
Slow leak
Jan 30, 2026 · Apt 4N
Close - Door/window
Window frame
Jan 30, 2026 · Apt 4N
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 3P
Close - Water leak
Slow leak
Nov 19, 2025 · Apt 4C
Close - Unsanitary condition
Mold
Nov 19, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Plumbing
Toilet
Sep 25, 2025 · Apt 4U
Close - Door/window
Window frame
Sep 25, 2025 · Apt 4U
Close - Unsanitary condition
Pests
Sep 25, 2025 · Apt 4U
Close - Paint/plaster
Wall
Sep 25, 2025 · Apt 4U
Close - Plumbing
Basin/sink
Sep 7, 2025 · Apt 1A
Close - Plumbing
Toilet
Apr 19, 2025 · Apt 4N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1961
- Floors
- 6
- Residential units
- 122
- Building area
- 99,180 ft²
- Lot area
- 25,000 ft²
- Zoning
- R5
- Community board
- 404
- Council district
- 21
- Block / lot
- 1566 / 21
- Assessed value
- $3,878,550
- Landmark / historic district
- No
HPD registration #419947, last renewed Oct 30, 2025.
Questions about 41-40 Denman Street
Who owns 41-40 Denman Street?
The owner of record in NYC Department of City Planning PLUTO data is 41-40 Denman Street Ventures, LLC.
Does 41-40 Denman Street have violations?
Yes. NYC HPD has recorded 1,279 housing violations at this property.
Is 41-40 Denman Street rent stabilized?
NYC Department of Finance tax bills listed 113 rent-stabilized units here in 2024 (about 93% of its 122 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 41-40 Denman Street built?
City records list 1961 as the year it was built.
How many apartments are in 41-40 Denman Street?
It has 122 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.