40-35 Ithaca Street
Queens, NY 11373BBL 4-01505-7501Map
Owner of record: Ithaca Arms Condominium
40-35 Ithaca Street is a condominium built in 1937 in Queens, 11373. It has 65 residential units across 6 floors. The owner of record is Ithaca Arms Condominium. HPD has recorded 198 housing violations here, most recently on October 12, 2026. 46 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 198
- DOB violations
- 25
- ECB violations
- 13
- HPD complaints
- 273
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 198
- CImmediately hazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from vestibule to cellphone access in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective electrical outlet at north and west walls in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets cartridge in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at the bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout at walls tiles in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets faucet in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective vanity cabinet in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 12, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th story
Dec 17, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarndant material at ceiling at public hall, 6th story
Dec 17, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling at public hall, 6th story
Dec 17, 2025
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 6g, 6th story, 4th apartment from east at south
Dec 17, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline drain pipe at sink in the kitchen located at apt 6g, 6th story, 4th apartment from east at south
Dec 17, 2025 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 4th apartment from east at south
Dec 17, 2025 · Apt 6G
Open — Notice of issuance sent to tenant - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling creating 2 room in the 4th room from east located at apt 5b, 5th story, 2nd apartment from west at north
Dec 9, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from west at north
Dec 9, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from west at north
Dec 9, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retard material at ceiling at public hall, 6th story
Sep 11, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 5g, 5th story, 4th apartment from east at south
Sep 11, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5g, 5th story, 4th apartment from east at south
Sep 11, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5g, 5th story, 4th apartment from east at south
Sep 11, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5g, 5th story, 4th apartment from east at south
Sep 11, 2025 · Apt 5G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Sep 11, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 6th story
Sep 11, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 6g, 6th story, 4th apartment from east at south
Sep 11, 2025 · Apt 6G
Open — Not complied with - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 6g, 6th story, 4th apartment from east at south
Sep 11, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east at south located at apt 6g, 6th story, 4th apartment from east at south
Sep 11, 2025 · Apt 6G
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5g, 5th story, 4th apartment from east at south
Sep 11, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 6g, 6th story, 4th apartment from east at south
Sep 11, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at south wall in the kitchen located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at east closet in the private hallway located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall, north wall, and south wall at east closet in the private hallway located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the private hallway located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6g, 6th story, 4th apartment from east at south
Apr 10, 2025 · Apt 6G
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 10, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 10, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 10, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Apr 10, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 6th story
Apr 10, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Apr 10, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of bushes preventing dropladder from free falling at 2nd stack from east at south (building front) at fire escape
Apr 10, 2025
Closed — Violation closed
DOB building violations · 25
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed
Show 15 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2014
Dob violation - resolved - Plumbing none
Dryers, washers, hot and cold water lines, gas, waste and vent lines installed in the cellar laundry room without a permit remedy: obtain a permit
Mar 26, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active
ECB violations · 13
- Class - 1
Dlm not working. repair. phone not working. repair. car top light not working. repair. provide cat5 tags. provide 2025 fire extinguisher. adjust lobby door lock. adjust basement floor landing.
Sep 24, 2025 · Penalty $1,250
Resolve - Class - 1
Entire device inoperative repair and call d.o.b. for reinspection
Jun 2, 2025 · Penalty $1,250
Resolve - Class - 2
07x10,08v01,67b10,68b07,56y02,03o06. 07x10-zone restrictor tied up; 03d06-toebuard unsecured.
Jul 6, 2016
Resolve - Class - 1
07x10 zone restrictor tied up.
Jul 6, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to provide a system of automatic sprinklers where required. 2 dryer or more during physical inspection i observed 2 speed queen dryer in operation in the cellar laundry room w/o an automatic sprinkler
Mar 26, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to have new or altered plumbing system tested. during physicalinspection i observed 2 dryer and gas piping servicing dryers in the cellar laundry room w/o gas test done. gas test must be performed on al
Mar 26, 2014 · Penalty $1,000
Resolve - Class - 1
Gas being supplied to bldg w/o inspection & certification by d.o.b. during physical inspection i observed 2 speed queen dryers in use in thecellar laundry room w/o gas authorization inspections must be done to
Mar 26, 2014 · Penalty $1,000
Resolve - Class - 1
Occupancy contrary to that allowed by certificate of occupancy or bldgdept. records. during physical inspection i observed 1 lanudry room inuse cellar. certificate of occupany does not show a laundry room in th
Mar 26, 2014 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. during physical inspection i observed 2 speed queendryers, 3l.g. washers, hot & cold water lines, vent & waste lines & gas piping installed in the cellar laundry room w/o a permit. remedy: ob
Mar 26, 2014 · Penalty $1,600
Resolve - Class - 2
11x10,40o02,41t07,60q03,39q03,39o02,56y13,59o02,98bb05,99u05,68m07,69m07,81m07,77b11. 11x- in car communication 40o- oil on floor. 39q- car top lite 59o- oil on brake pads. 99u- one yr tag 77b- replace toe guar
Dec 13, 2010 · Penalty $500
Resolve
Show 3 more ↓
- Class - 1
97x10)only elevator in 6story bldg is out of service thereby creating condition dangerous to human life.restore to service so full inspection can be performed.
Nov 23, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances.noted @ said premises:a # of medium to large size ac units @ a # of apt windows are not properly braced & supported from the exterior side @ various flrs througho
Aug 23, 2010
Resolve - Class - 2
98bb5.41t7.60q3.39q3.39q3 car top lite
Sep 18, 2009 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Pests
Oct 23, 2026 · Apt 4D
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Plumbing
Toilet
Oct 13, 2026 · Apt 3A
Open - General
Bell/buzzer/intercom
Oct 10, 2026 · Apt 3A
Open - Plumbing
Toilet
Oct 7, 2026 · Apt 3A
Close - Paint/plaster
Wall
Oct 7, 2026 · Apt 3A
Close - Plumbing
Basin/sink
Oct 7, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Oct 7, 2026 · Apt 3A
Close - Plumbing
Bathtub/shower
Oct 7, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Oct 7, 2026 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jan 6, 2026 · Apt 1L
Close - Unsanitary condition
Mold
Jan 6, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 1A
Close - Water leak
Slow leak
May 30, 2025 · Apt 6G
Close - Plumbing
Bathtub/shower
May 30, 2025 · Apt 6G
Close - Water leak
Slow leak
May 29, 2025 · Apt 5G
Close - Heat/hot water
Entire building
Apr 8, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Mar 21, 2025 · Apt 6G
Close - Plumbing
Basin/sink
Mar 21, 2025 · Apt 6G
Close - Plumbing
Bathtub/shower
Mar 21, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Oct 30, 2024 · Apt 6C
Close - Heat/hot water
Apartment only
Aug 5, 2024 · Apt 5G
Close - Flooring/stairs
Floor
May 2, 2024 · Apt 4D
Close - Safety
Fire escape
May 2, 2024 · Apt 4D
Close - Plumbing
Basin/sink
May 2, 2024 · Apt 4D
Close - Door/window
Window frame
May 2, 2024 · Apt 4D
Close - Door/window
Door
May 2, 2024 · Apt 4D
Close - Appliance
Electric/gas range
May 2, 2024 · Apt 4D
Close - Heat/hot water
Entire building
Mar 12, 2024 · Apt 6C
Close - Paint/plaster
Ceiling
Feb 1, 2024 · Apt 5G
Close - Appliance
Electric/gas range
Feb 1, 2024 · Apt 5G
Close - Plumbing
Basin/sink
Feb 1, 2024 · Apt 5G
Close - General
Cabinet
Feb 1, 2024 · Apt 5G
Close - Plumbing
Bathtub/shower
Jan 2, 2024 · Apt 4D
Close - General
Bell/buzzer/intercom
Aug 4, 2023 · Apt 6J
Close - Paint/plaster
Ceiling
Jul 31, 2023 · Apt 1F
Close - Door/window
Door
Oct 10, 2022 · Apt APT5K
Close - Flooring/stairs
Floor
Oct 10, 2022 · Apt APT5K
Close - Door/window
Window frame
Oct 10, 2022 · Apt APT5K
Close - Plumbing
Toilet
Oct 10, 2022 · Apt APT5K
Close - Water leak
Heavy flow
Aug 30, 2022 · Apt 6J
Close - Heat/hot water
Entire building
Mar 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2022 · Apt 6C
Close - Heat/hot water
Entire building
Jan 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Plumbing
Radiator
Nov 19, 2021 · Apt 2E
Close - Plumbing
Basin/sink
Nov 19, 2021 · Apt 2E
Close - Water leak
Slow leak
Nov 19, 2021 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R4)
- Year built
- 1937
- Floors
- 6
- Residential units
- 65
- Building area
- 51,890 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7B
- Community board
- 404
- Council district
- 25
- Block / lot
- 1505 / 7501
- Assessed value
- $2,522,259
- Landmark / historic district
- No
HPD registration #401053, last renewed Aug 26, 2025.
Questions about 40-35 Ithaca Street
Who owns 40-35 Ithaca Street?
The owner of record in NYC Department of City Planning PLUTO data is Ithaca Arms Condominium.
Does 40-35 Ithaca Street have violations?
Yes. NYC HPD has recorded 198 housing violations at this property.
Is 40-35 Ithaca Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 14% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 40-35 Ithaca Street built?
City records list 1937 as the year it was built.
How many apartments are in 40-35 Ithaca Street?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.

