88-01 37 Avenue
Queens, NY 11372BBL 4-01462-7501Map
Owner of record: The Centre Court Condominium
88-01 37 Avenue is a condominium built in 1927 in Queens, 11372. It has 88 residential units across 6 floors. The owner of record is The Centre Court Condominium. HPD has recorded 147 housing violations here, most recently on October 4, 2026. 45 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 147
- DOB violations
- 56
- ECB violations
- 48
- HPD complaints
- 88
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 147
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5p, 5th story, 1st apartment from north at east
Oct 4, 2026 · Apt 5P
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from east located at apt 5p, 5th story, 1st apartment from north at east
Oct 4, 2026 · Apt 5P
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 5p, 5th story, 1st apartment from north at east
Oct 4, 2026 · Apt 5P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance window lower sash at south wall in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from east at south
Jul 28, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from east at south
Jul 28, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from east at south
Jul 28, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from east at south
Jul 28, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4c, 4th story, 1st apartment from east at south
Jul 28, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinge in the entrance located at apt 4b, 4th story, 2nd apartment from east at south
Jun 11, 2024 · Apt 4B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5m, 6th story, 2nd apartment from south at west , section at east
Sep 8, 2023 · Apt 5M
Open — Nov sent out
Show 40 more ↓
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3p, 4th story, 1st apartment from north at east , section at east
Sep 8, 2023 · Apt 3P
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2n, 3rd story, 3rd apartment from south at west , section at east
Sep 8, 2023 · Apt 2N
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1k, 2nd story, 2nd apartment from east at south , section at east
Sep 8, 2023 · Apt 1K
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1l, 2nd story, 1st apartment from south at west , section at east
Sep 8, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4a, 5th story, 1st apartment from south at west , section at west
Sep 8, 2023 · Apt 4A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4g, 5th story, 1st apartment from west at north , section at west
Sep 8, 2023 · Apt 4G
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4e, 5th story, 2nd apartment from north at east , section at west
Sep 8, 2023 · Apt 4E
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3a, 4th story, 1st apartment from south at west , section at west
Sep 8, 2023 · Apt 3A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1n, 2nd story, 3rd apartment from south at west , section ''35-63'', 1st from north at east
Sep 8, 2023 · Apt 1N
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt o, 1st story, 2nd apartment from west at north , section ''35-63'', 1st from north at east
Sep 8, 2023 · Apt O
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Jul 13, 2023 · Apt 2-O
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jul 13, 2023 · Apt 2-O
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Replace with new the broken or defective formica countertop and base cabinet at sink in the kitchen located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the foyer located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls throughout in the private hallway located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from east located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from east located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and walls throughout in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Repair or replace the smoke detector ; missing in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). ; missing in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 10 sq. ft.) in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment granted - CImmediately hazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Jul 9, 2022 · Apt 4C
Open — Certification postponment denied - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at public hall, 5th story
Jul 6, 2022
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at fire door at public hall, 5th story
Jul 6, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jul 5, 2022
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock at metal door at north yard
Jul 5, 2022
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 5 sq ft) in the bathroom located at apt 4c, 5th story, 1st apartment from east at south original violation 15110405 issued 19-apr-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 19, 2022 · Apt 4C
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). ; missing in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Apr 19, 2022 · Apt 4C
Open — Certification postponment denied - BHazardous
Repair or replace the smoke detector ; missing in the entire apartment located at apt 4c, 5th story, 1st apartment from east at south
Apr 19, 2022 · Apt 4C
Open — Certification postponment denied - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4c, 5th story, 1st apartment from east at south
Apr 19, 2022 · Apt 4C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Apr 19, 2022 · Apt 4C
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Apr 19, 2022 · Apt 4C
Open — Certification postponment denied
DOB building violations · 56
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
.damage observed to have been sustainned to the sidewalk shed due to vehicle impact
Jun 3, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 3, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 23, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2003
Dob violation - resolved
ECB violations · 48
- Class - 2
Failure to submit an acceptable cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910803. agg1: prior nov 37023124y under
Apr 8, 2025 · Penalty $6,250
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #916970. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain building facade and appurtenances. at time of inspection at exposure 2, multiple areas of step cracks. on exposure 4 vertical crack that runs up the wall. remedy: maintain exterior facade ta
Nov 30, 2023 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle8c report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#810803.submit acceptable required tech report
Oct 19, 2022 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioners order to file a certificate of correction with the department of buildings.note:at the time of inspection respondent do not comply with previous violation#35542168h issued o
Mar 20, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade andappurtenances.note:at the time of inspection observed defective facade:exposure#1 east elevation:(1)defective mortar joints(2)stop cracks(3)vertical crack 1,2,and
Mar 20, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. upon inspection observed step cracks on brick masonry at exposure#1. also crack window head stone at exp#2 step cracks at facade brick masonry at
Dec 30, 2020 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note:at time of inspection observed at 1)east elevation,exposure#1;step cracked brick masonry (i)cracked window head stone (2)south elevation,expo
Nov 9, 2020 · Penalty $6,250
Active - Class - 1
Failure to provide safety measures(such as sidewalk shed,netting etc.)where required. note:at time of inspection,observed defective conditions on exposure#1(89 st) and exposure#2(87 ave) where no safety measure
Nov 9, 2020
Resolve - Class - 1
Failure to provide sidewalk shed where required.note:at time of inspection observed that respondent did not correct previous violation ecb#35538725j dated 07/15/2020.rem:immediate provide sidewalk shed at main
Sep 15, 2020
Resolve
Show 38 more ↓
- Class - 1
Failure to maintain exterior building facade and appurtenancess.note:at time of inspection observed at 1)east elevation,exposure#1 step cracked brick masonry on multiple locations.2)south elevation,exposure#2;d
Sep 15, 2020 · Penalty $2,500
Active - Class - 1
Failure to provide side walls shed where required. oted: @the of inspection. east excavation exp#1 spalled & loose masonry drive & mortar joints @parapet level above entrance to bldg. conditions in previous lvl
Jul 15, 2020
Resolve - Class - 1
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection i observed on exposure #1 east elevation:cracks & step cracks on brick parapet wall,6th floor and several other locati
May 6, 2020 · Penalty $2,500
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. as noted: exposure roof. step cracks on bulkhead and chimney damaged joints on fire escape. loose metal coping on parapet wall. exp #1, step crack
Oct 1, 2018 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35301814x issued 11/24/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. at cellar level, work w/o
Sep 28, 2018
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35301813y issued 11/24/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi
Sep 28, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35301813y issued on 11-24-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply w/comm's order &/or file
Aug 23, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35301814x issued on 11/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply w/comm's order &/or file
Aug 23, 2018
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/vio# 35301814x issued on 11/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/out a permit. rem: comply w/ commissioner'
Jul 10, 2018
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/vio# 35301813y issued on 11/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. rem: comply w/ commissioner's order &/or file a c of
Jul 10, 2018
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation# 38301813y issued on 11/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by c of o or
May 7, 2018
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation# 35301814x issued on 11/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. installed metal stairs to cellar full height pa
May 7, 2018
Resolve - Class - 1
Failure to comply w/comm's order contained in summ/viol#35301814x issued 11/24/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01. for work w/o permti.rem;comply w/summ/file a cofc
Apr 9, 2018
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35301814x issued 11/24/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work without a permit
Feb 16, 2018
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35301813y issued 11/24/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi
Feb 16, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35301813y issued on 12/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jan 9, 2018
Resolve - Class - 2
67x10)communication is not operative.
Dec 19, 2017 · Penalty $500
Resolve - Class - 1
Occupancy contrary to that allowed by the c or o or dob records:at time of inspection of "lucky nails spa & more"cellar level-observed 1 dining/eating area.1 2pc.bathroom,slop sink-massaging table w/(sorting-wa
Nov 24, 2017
Resolve - Class - 1
Work without permits:work noted:at cellar level of "lucky nails spa & more"installed full set of stairs from cellar to 1 & 2fl(interior stairs metal)full height partitions to create additional block space,exten
Nov 24, 2017
Resolve - Class - 2
B254:50a-smoke alarm not operation 50 b-seals on boiler front and rear clean outs leaking 50c-missing tie down on rear door.rem:correct all violating conditions and submit cofc.
Jun 20, 2017 · Penalty $250
Resolve - Class - 2
As per class 2(b265)28-303.7 failure to file a complete boiler inspection report as per dob records.submit a current bo-9 report.
Jun 20, 2017 · Penalty $500
Active - Class - 1
B154,51,3a&c. flue pipe disconnected and rotted.
Sep 9, 2014 · Penalty $5,000
Resolve - Class - 2
B254,36,31,15,24b,50. *unregistered. no spill switch.
Sep 9, 2014 · Penalty $2,500
Resolve - Class - 2
44h10,08v01,32h10,70o02,72m07,56y02,56y13,59y02.44h10:deflector sheave in machine room is worn. 72m07:provide pit stop switch as per appendix k.
Apr 15, 2012 · Penalty $500
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob -noted ecb vio #34388193k condition still exists. remedy: file c/c.
Mar 26, 2010 · Penalty $4,000
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved number of families dept of building records indicates apt 5b to be legally approved bedrooms by subdivided living room created 1
May 7, 2009
Resolve - Class - 3
Work w/o a permit work noted: at 5th flr apt 5b subdivided living roomby erected a full height partition installed entry door created 1 sro.remedy: obtain permit or restore to prior legal condition.
May 7, 2009
Resolve - Non-hazardous
51b14,55y13,41g11,51m07,38q03. 41-g jumped fuse. 51-m anti spin device. 38-q lite.
Nov 20, 2007 · Penalty $350
Resolve - Non-hazardous
10i11,31h10,51b14,55y13,59x10.
Nov 20, 2007 · Penalty $350
Resolve - Non-hazardous
39p07 36i10 28i10 36 overhead room loose bricks repair all walls
Sep 15, 2004 · Penalty $180
Resolve - Non-hazardous
At first of rear store built new sheetrock partitions with new doors to created room and bathroom with toilet installed electrical plumbing fixtures also built new wood mezzanine with new wood steps new doors
Jun 4, 2003 · Penalty $500
Active - Non-hazardous
73# 73-operating device without an equipment use permit (certificate rem. call 212-3128745 to arrange for appointment to test device to finalize ebn 1368/97. art (c26-117-27-185.
Feb 20, 1998 · Penalty $250
Resolve - Non-hazardous
46l, 18l, 9m. 1st floor stops car when door is pulled. 2 gibs on door.
May 8, 1995 · Penalty $1,000
Resolve - Non-hazardous
75#, 22d, 08v, 11q, 17m. 75 - and tag device properly.- 17 grill.
May 20, 1993 · Penalty $200
Resolve - Non-hazardous
75#, 22d, 08v, 10r, 11q, 62m. 75 - and properly tag device - 10 - plughole 62 - provide cover junction box.
May 20, 1993 · Penalty $200
Resolve - Non-hazardous
8v,28h,30l,52l,18l,50y,17m,73#,#(30)main floor #(52)oil soaked #(18)1st floor&properly secure 2 mf floor #(17)gnd floor,grilol guard. #(73)perform 5 yr test,properly tag device and file elv3 form
Jun 24, 1991
Resolve - Non-hazardous
08v,28h,33l,22d,73#,#(33)eliminate excessive noise #(03)perform 5 yr test,properly tag device and file elv 3 form
Jun 24, 1991
Resolve - Non-hazardous
08-v, 20-l, 33-l, 33-d, 57-z, 57-o, 73#, 50-y, 20)- 5fl hall staion button repair to call car. 33) repair lighting. 33) secure ladder way o.h. room to wall of same. 57) keep water out of pit, provide & proper
Mar 29, 1991 · Penalty $75
Resolve
Complaints
- Unsanitary condition
Pests
Sep 16, 2026 · Apt 5P
Close - Unsanitary condition
Pests
Sep 16, 2026 · Apt 5P
Close - Water leak
Damp spot
Sep 16, 2026 · Apt 5P
Close - Water leak
Slow leak
Jun 1, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Apr 3, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Nov 21, 2025 · Apt 4C
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 4C
Close - Water leak
Heavy flow
Nov 21, 2025 · Apt 4C
Close - Door/window
Window frame
Nov 21, 2025 · Apt 4C
Close - Plumbing
Water supply
Oct 21, 2025 · Apt 3M
Close
Show 40 more ↓
- Plumbing
Water supply
Oct 8, 2025 · Apt 3M
Close - Unsanitary condition
Pests
Jun 28, 2024 · Apt 4B
Close - Unsanitary condition
Pests
Jun 3, 2024 · Apt 4B
Close - Plumbing
Bathtub/shower
Jul 13, 2022 · Apt 4B
Close - Electric
Outlet/switch
Jul 13, 2022 · Apt 4B
Close - Plumbing
Radiator
Jul 13, 2022 · Apt 4B
Close - General
Cabinet
Jul 13, 2022 · Apt 4B
Close - Plumbing
Basin/sink
Jul 13, 2022 · Apt 4B
Close - General
Cooking gas
Jul 13, 2022 · Apt 4B
Close - Plumbing
Radiator
Jul 13, 2022 · Apt 4B
Close - Plumbing
Toilet
Jul 7, 2022 · Apt APT4C
Close - Flooring/stairs
Floor
Jul 1, 2022 · Apt 4C
Close - Plumbing
Toilet
Jul 1, 2022 · Apt 4C
Close - Plumbing
Basin/sink
Apr 28, 2022 · Apt F
Close - General
Cabinet
Apr 28, 2022 · Apt F
Close - Flooring/stairs
Floor
Apr 28, 2022 · Apt F
Close - Paint/plaster
Wall
Apr 11, 2022 · Apt APT4C
Close - Water leak
Damp spot
Apr 11, 2022 · Apt APT4C
Close - Unsanitary condition
Mold
Apr 11, 2022 · Apt APT4C
Close - Unsanitary condition
Pests
Apr 11, 2022 · Apt APT4C
Close - Electric
Outlet/switch
Apr 11, 2022 · Apt APT4C
Close - Unsanitary condition
Pests
Apr 11, 2022 · Apt APT4C
Close - Unsanitary condition
Pests
Aug 26, 2021 · Apt 5P
Close - Door/window
Window frame
Aug 26, 2021 · Apt 5P
Close - Heat/hot water
Entire building
Jan 21, 2019 · Apt 4L
Close - Heat/hot water
Entire building
Feb 2, 2018 · Apt 5G
Close - Heat/hot water
Apartment only
Nov 30, 2017 · Apt 2M
Close - Heat/hot water
Entire building
Nov 26, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 9, 2017 · Apt 2M
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt 1B
Close - Unsanitary condition
Mold
Mar 29, 2017 · Apt 4C
Close - Heat/hot water
Entire building
Mar 12, 2017 · Apt G
Close - Heat/hot water
Apartment only
Feb 2, 2016 · Apt 5G
Close - Heat/hot water
Apartment only
Nov 10, 2015 · Apt 5E
Close - Heat/hot water
Entire building
Nov 3, 2015 · Apt 5E
Close - Heat/hot water
Entire building
Mar 5, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2015 · Apt 1N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1927
- Floors
- 6
- Residential units
- 88
- Building area
- 83,943 ft²
- Lot area
- 20,000 ft²
- Zoning
- R7-1
- Community board
- 403
- Council district
- 25
- Block / lot
- 1462 / 7501
- Assessed value
- $4,512,172
- Landmark / historic district
- No
HPD registration #409296, last renewed Aug 25, 2025.
Questions about 88-01 37 Avenue
Who owns 88-01 37 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is The Centre Court Condominium.
Does 88-01 37 Avenue have violations?
Yes. NYC HPD has recorded 147 housing violations at this property.
Is 88-01 37 Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 7% of its 88 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 88-01 37 Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 88-01 37 Avenue?
It has 88 residential units and 99 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.