24-50 28 Street
Queens, NY 11102BBL 4-00851-0054Map
Owner of record: 2820 Ditmars LLC
24-50 28 Street is a walk-up apartment building built in 1924 in Queens, 11102. It has 9 residential units across 4 floors. The owner of record is 2820 Ditmars LLC. HPD has recorded 60 housing violations here, most recently on March 20, 2025. 41 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 60
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 14
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 60
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ...frame missing at wall.. at public hall, 1st story
Mar 20, 2025
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 11, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 2nd story, 1st apartment from east at south
Mar 20, 2025 · Apt 3
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ..two electrical outlets at north wall in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
Mar 20, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 8, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 8, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 8, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 8, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west
Aug 8, 2024 · Apt 1L
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling, south and west walls at bulkhead, roof.
May 23, 2022
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling, south and west walls at bulkhead, roof.
May 23, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
May 23, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Dec 28, 2021
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from east at south
Dec 28, 2021 · Apt 5
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required , light fixtures present
Mar 29, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles front step landing at front entrance to bldg.
Mar 12, 2010
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sagging wood floor in the private hallway located at apt 2, 1st story, apartment at east
Jul 15, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sagging cement and ceramic tiles at floor in the bathroom located at apt 2, 1st story, apartment at east
Jul 15, 2002 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east court
Jul 5, 2002
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door to heating plant key locked north court
Jul 5, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling 4th sty at public hall
Jul 5, 2002
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1st sty at public hall
Jul 5, 2002
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt b1
Jun 20, 2002 · Apt B1
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby
Jun 20, 2002
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at second story public hall
Jun 20, 2002
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots all stories throughout rear fire escape
Jun 20, 2002
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 8, 3rd story
Jun 5, 2001 · Apt 8
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures washbasin in the bathroom located at apt 8, 3rd story, apartment at east
Jun 5, 2001 · Apt 8
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures washbasin in the bathroom located at apt 8, 3rd story
Jun 5, 2001 · Apt 8
Open — Nov sent out - BHazardous
Replace with new the missing hook and eye on roof bulkhead door
May 23, 2001
Open — Nov sent out - ANon-hazardous
Refit roof bulkhead door
May 23, 2001
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 1st story
May 4, 2001 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 1st story
May 4, 2001 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective floor ceramic tiles in the bathroom located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts incand.or equivalent minimum agregate required in the front areaway located at public parts 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at vestibule , 1st story
May 3, 2001
Open — Nov sent out - BHazardous
Properly repair the broken or defective caulking aroung bathtub in the bathroom located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls throughout in the entire apartment located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of water leaks at ceiling and walls throughout in the entire apartment located at apt 2, 1st story
May 3, 2001 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets kitchen sink cellar apt.
Jul 2, 1997
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood sink cabinet kitchen cellar apt.
Jul 2, 1997
Open — Nov sent out - BHazardous
Replace with new the broken or defective wood paneling walls kitchen cellar apt.
Jul 2, 1997
Open — Nov sent out
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 2
- Non-hazardous
50a/50b/34b. 50a- hole in ceiling. 50b- grate above door must be sealed up
May 8, 2006 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior bldg.wall.hazardous defects are cracked stucco at 4th story south wall and at 2nd story north wall of bldg.remedy;maintain exterior bldg wall.
Jul 31, 2002 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 4, 2025 · Apt 4
Close - Electric
Outlet/switch
Nov 1, 2024 · Apt 3
Close - Door/window
Door
Nov 1, 2024 · Apt 3
Close - Water leak
Slow leak
Aug 7, 2024 · Apt 1L
Close - Water leak
Damp spot
Aug 7, 2024 · Apt 1L
Close - Electric
No lighting
Aug 7, 2024 · Apt 1L
Close - Unsanitary condition
Mold
Aug 7, 2024 · Apt 1L
Close - Unsanitary condition
Garbage/recycling storage
Jan 9, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
May 21, 2022 · Apt 7
Close - Water leak
Heavy flow
Dec 23, 2021 · Apt 5
Close
Show 4 more ↓
- Plumbing
Water supply
Mar 11, 2010 · Apt 8
Close - Nonconst
Vermin
Mar 22, 2007 · Apt 3
Close - Plumbing
Water-leaks
Oct 12, 2005 · Apt B
Close - Plumbing
Sewer
Oct 12, 2005 · Apt B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1924
- Floors
- 4
- Residential units
- 9
- Building area
- 6,400 ft²
- Lot area
- 5,000 ft²
- Zoning
- R5D
- Community board
- 401
- Council district
- 22
- Block / lot
- 851 / 54
- Assessed value
- $641,250
- Landmark / historic district
- No
HPD registration #405661, last renewed Aug 15, 2025.
Questions about 24-50 28 Street
Who owns 24-50 28 Street?
The owner of record in NYC Department of City Planning PLUTO data is 2820 Ditmars LLC.
Does 24-50 28 Street have violations?
Yes. NYC HPD has recorded 60 housing violations at this property.
Is 24-50 28 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 22% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 24-50 28 Street built?
City records list 1924 as the year it was built.
How many apartments are in 24-50 28 Street?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.