24-25 27 Street
Queens, NY 11102BBL 4-00851-0025Map
Owner of record: Casamento, Dominic
24-25 27 Street is a walk-up apartment building built in 1924 in Queens, 11102. It has 9 residential units across 4 floors. The owner of record is Casamento, Dominic. HPD has recorded 82 housing violations here, most recently on September 23, 2025. 3 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 82
- DOB violations
- 3
- ECB violations
- 4
- HPD complaints
- 70
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 82
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st riser from west at north wall in the bathroom located at apt 1
Sep 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Sep 17, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing wall cover for electrical outlet at east wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north
Sep 17, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Sep 17, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Sep 6, 2025 · Apt 1
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of lockable door knob and door leading to fire escape in the 1st room from east at north located at apt 42, 4th story, 1st apartment from east at south
Aug 27, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel reglaze at bathtub in the bathroom located at apt 42, 4th story, 1st apartment from east at south
Aug 27, 2025 · Apt 42
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of lower sash of 1st window from north at east leading to fire escape is stuck in the 1st room from east at north located at apt 42, 4th story, 1st apartment from east at south
Aug 27, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges 1st from south at west (2nd door leading to boiler room) at cellar
Aug 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch assembly 2nd door from south at west boiler room entrance at cellar
Aug 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges 2nd from south at west boiler room entrance at cellar
Aug 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame 1st from south at west boiler room entrance at cellar
Aug 18, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Aug 18, 2025 · Apt 1
Open — Not complied with - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entrance located at apt 1, 1st story, 1st apartment from north at east
Aug 18, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north, west and south walls in the bathroom located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 42, 4th story, 1st apartment from south at west
Aug 18, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 11, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 11, 2025 · Apt 1
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Aug 11, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum temperature of 130 degrees fahrenheit in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Aug 11, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Aug 11, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north
Jul 8, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Jul 8, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north
Jul 8, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north
Jul 8, 2025 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 3, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 3, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jul 3, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jul 3, 2025 · Apt 1
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Jul 3, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jul 3, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north
Jul 3, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing on wall at public hall, 1st story
Jul 3, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 3, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 3, 2025
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 3, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the private hallway located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north at east located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electric outlets at north wall in the 1st room from north at east located at apt 11, 1st story, 1st apartment from north at east
Jun 20, 2025 · Apt 11
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
27-597 misc.vio.questionable construction.@ front yard-1 white brick wall installed approx. 38' in height bearing on concrete slab x20ft. long as follows:(1)brick wall barrier along walkway leading to front ent
Aug 5, 2011
Resolve - Class - 2
Failure to comply with the commissioners order to file a certificate of correction with the department of buildings. failure to file certificate of correction for ecb nov #34566801y/dob nov# 030207c01xz01. reme
Jul 7, 2008 · Penalty $800
Resolve - Non-hazardous
Work w/o permit. work noted: const off st parking space approx 20'0 x 20'-0. in front of premises. remedy: obtain permit or restore premisesto prior legal condition.
Mar 2, 2007 · Penalty $500
Resolve - Hazardous
Work w/o permit. work noted: const off st parking space approx 20'-0 x20'-0 in from of premises. remedy: obtain permit or restore premises to prior legal condition.
Feb 27, 2007
Resolve
Complaints
- Door/window
Door
Dec 28, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Aug 17, 2025 · Apt 42
Close - Paint/plaster
Wall
Aug 6, 2025 · Apt 42
Close - Heat/hot water
Entire building
Jul 3, 2025 · Apt 1
Close - Heat/hot water
Entire building
Jun 19, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 19, 2025 · Apt 2-2
Close - Plumbing
Toilet
Jun 18, 2025 · Apt 11
Close - Plumbing
Bathtub/shower
Jun 18, 2025 · Apt 11
Close - Plumbing
Water supply
Jun 18, 2025 · Apt 11
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2025 · Apt BLDG
Close
Show 40 more ↓
- General
Signage missing
Apr 6, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 3, 2025 · Apt BLDG
Close - General
Signage missing
Feb 3, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 9, 2025 · Apt BLDG
Close - Plumbing
Water supply
Dec 31, 2024 · Apt BLDG
Close - General
Signage missing
Dec 31, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 31, 2024 · Apt BLDG
Close - General
Janitor/super
Dec 31, 2024 · Apt 22
Close - Unsanitary condition
Pests
Mar 29, 2024 · Apt 11
Close - Unsanitary condition
Pests
Mar 6, 2024 · Apt 11
Close - Unsanitary condition
Pests
Jun 28, 2023 · Apt 11
Close - Plumbing
Water supply
Mar 22, 2023 · Apt 21
Close - Plumbing
Water supply
Mar 22, 2023 · Apt 21
Close - Unsanitary condition
Garbage/recycling storage
Oct 18, 2021 · Apt BLDG
Close - Water leak
Heavy flow
Jul 27, 2020 · Apt 11
Close - Heat/hot water
Entire building
Nov 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2016 · Apt 22
Close - Heat/hot water
Entire building
Nov 12, 2016 · Apt 21
Close - Heat/hot water
Apartment only
Nov 12, 2016 · Apt 22
Close - Heat/hot water
Apartment only
Nov 11, 2016 · Apt 21
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt 21
Close - Plumbing
Radiator
Feb 24, 2007 · Apt 42
Close - Plumbing
Radiator
Feb 24, 2007 · Apt 42
Close - Plumbing
Radiator
Feb 24, 2007 · Apt 42
Close - Plumbing
Radiator
Feb 24, 2007 · Apt 42
Close - Heating
Heat related
Feb 8, 2007 · Apt 3I
Close - Plumbing
Water supply
Oct 3, 2005 · Apt 3L
Close - Appliance
Refrigerator
Jun 6, 2005 · Apt 3I
Close - Plumbing
Basin/sink
May 21, 2005 · Apt 31
Close - Appliance
Refrigerator
May 21, 2005 · Apt 31
Close - Plumbing
Basin/sink
May 21, 2005 · Apt 31
Close - Electric
Wiring
May 21, 2005 · Apt 31
Close - Electric
Wiring
May 21, 2005 · Apt 31
Close - Heating
Heat related
Feb 22, 2005 · Apt 3I
Close - Heating
Heat related
Dec 21, 2004 · Apt 3I
Close - Plumbing
Water-leaks
Nov 12, 2004 · Apt 3I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1924
- Floors
- 4
- Residential units
- 9
- Building area
- 8,350 ft²
- Lot area
- 4,900 ft²
- Zoning
- R5D
- Community board
- 401
- Council district
- 22
- Block / lot
- 851 / 25
- Assessed value
- $749,700
- Landmark / historic district
- No
HPD registration #405525, last renewed Jul 21, 2026.
Questions about 24-25 27 Street
Who owns 24-25 27 Street?
The owner of record in NYC Department of City Planning PLUTO data is Casamento, Dominic.
Does 24-25 27 Street have violations?
Yes. NYC HPD has recorded 82 housing violations at this property.
Is 24-25 27 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 22% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 24-25 27 Street built?
City records list 1924 as the year it was built.
How many apartments are in 24-25 27 Street?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.