35-01 34 Street
Queens, NY 11106BBL 4-00638-0019Map
Owner of record: 35-15 34th St Realty LLC
35-01 34 Street is a walk-up apartment building built in 1928 in Queens, 11106. It has 60 residential units across 4 floors. The owner of record is 35-15 34th St Realty LLC. HPD has recorded 574 housing violations here, most recently on August 27, 2026. 17 of the 50 most recent violations are still open. City tax records listed 60 rent-stabilized apartments here in 2024.
- HPD violations
- 574
- DOB violations
- 18
- ECB violations
- 9
- HPD complaints
- 921
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 574
- BHazardous
Properly repair with similar material the broken or defective reglaze at bathtub in the bathroom located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt d43, 4th story, 1st apartment from south at west
Aug 27, 2026 · Apt D43
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 4th room from north located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame in the private hallway located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 4th room from north located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the foyer located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the foyer located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door in the foyer located at apt c42, 4th story, 2nd apartment from north at east
Jul 22, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c24, 2nd story, 1st apartment from west at north
Jul 18, 2026 · Apt C24
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Jul 18, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Jul 18, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at cellar
Jul 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c42, 4th story, 2nd apartment from north at east , section at northeast
Jul 14, 2026 · Apt C42
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt c42, 4th story, 2nd apartment from north at east , section at northeast
Jul 14, 2026 · Apt C42
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) door frame from north at east wall in the 1st room from east located at apt c42, 4th story, 2nd apartment from west at north
May 14, 2026 · Apt C42
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f at all hot water fixtures in the entire apartment located at apt c1, 1st story, 1st apartment from east at south
May 2, 2026 · Apt C1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt c42, 4th story, 2nd apartment from west at north
May 2, 2026 · Apt C42
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt c42, 4th story, 2nd apartment from west at north
May 2, 2026 · Apt C42
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt c42, 4th story, 2nd apartment from west at north
May 2, 2026 · Apt C42
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f at all hot water fixtures, in the entire apartment located at apt c42, 4th story, 2nd apartment from west at north
May 2, 2026 · Apt C42
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Apr 17, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c41, 4th story, 1st apartment from east at south
Apr 17, 2026 · Apt C41
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c1, 1st story, 1st apartment from east at south
Apr 16, 2026 · Apt C1
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c1, 1st story, 1st apartment from east at south
Apr 16, 2026 · Apt C1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c1, 1st story, 1st apartment from east at south
Apr 16, 2026 · Apt C1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Apr 16, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c41, 4th story, 1st apartment from east at south , section ''c''
Apr 16, 2026 · Apt C41
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c42, 3rd story, 2nd apartment from north at east
Apr 15, 2026 · Apt C42
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door is locked at basement story at boiler room
Apr 15, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door is locked at basement story at boiler room
Apr 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c21, 2nd story, 1st apartment from east at south
Apr 14, 2026 · Apt C21
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door to building at public hall, 1st story, section ''c''
Feb 28, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob in the 1st room from north at east located at apt c43, 4th story, 1st apartment from north at east
Feb 16, 2026 · Apt C43
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective missing radiator shut-off knob in the 1st room from north at west located at apt c43, 4th story, 1st apartment from north at east
Feb 16, 2026 · Apt C43
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at north wall window in the 1st room from north at east located at apt c43, 4th story, 1st apartment from east at south , section at southeast
Oct 27, 2025 · Apt C43
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at second stack from north at east building front at fire escape
Jun 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective brick and mortor joints at north exterior wall at fire escape, 2nd story
Jun 18, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department around window frame in the 1st room from north at east located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom return in the foyer located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor by radiator in the 1st room from north at west located at apt c43, 4th story, 1st apartment from north at east
Jun 9, 2025 · Apt C43
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 4th story north east fire escape top east return rail eroded bolts at connection plate into wall
Jun 9, 2025
Closed — Violation closed
DOB building violations · 18
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Plumbing none
The department of buildings intends to revoke all plumbing approvals & permits under application #440163485 due to suspension of license.stop all plumbing work immediately except to make site safe
Jul 29, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to comply with commissioner's order contained in summons/viol ation #35370139k issued on 10/17/18 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable cert
Jul 10, 2019 · Penalty $625
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35259935n issued on 11/22/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit @ cellar level. remedy: comply w/comm's o
Nov 26, 2018 · Penalty $2,500
Resolve - Class - 2
Work without a permit.noted:rebuiding chimney with bricks at roof level.two workers observed one on scaffold at roof and the other at groundlevel.no filing in dob records.obtain permit to legalize work.obtain p
Oct 17, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons violation 35259935n issued on 11/22/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work w/o a permit.
Sep 6, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35259935n issued 11/22/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work without a permit
Jul 18, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35259935n issued on 11/22/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar level. remedy: comply w/comm's orde
May 26, 2018 · Penalty $6,250
Resolve - Class - 1
Work without a permit. failure to comply with the commissioner's order contained in summons/violation #35259935n issued on 11/22/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102.01.
Apr 20, 2018 · Penalty $2,500
Resolve - Class - 2
Residence altered as a dwelling for more than the # of families legally authorized by the c of o or official records. according to hpd mdr#401097(00)noted: cellar rear created a class'a'apt w/kitchen & gas stov
Nov 22, 2017 · Penalty $1,200
Resolve - Class - 1
Work w/o a permit. note: at cellar level(receive)full height partition walls created w/kitchen w/gas stove,3pc bathroom(shower,toilet,sink)w/water & waste lines installed. remedy: comply w/the notice of violati
Nov 22, 2017 · Penalty $1,600
Resolve
Complaints
- Heat/hot water
Entire building
Oct 17, 2026 · Apt C21
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt C21
Close - Paint/plaster
Wall
Sep 29, 2026 · Apt D42
Close - General
Cooking gas
Sep 29, 2026 · Apt D42
Close - Unsanitary condition
Mold
Sep 29, 2026 · Apt D42
Close - Door/window
Window frame
Sep 29, 2026 · Apt D42
Close - Plumbing
Bathtub/shower
Aug 24, 2026 · Apt D43
Close - Door/window
Door
Aug 24, 2026 · Apt D43
Close - Appliance
Refrigerator
Aug 24, 2026 · Apt D43
Close - Plumbing
Basin/sink
Aug 24, 2026 · Apt D43
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Aug 7, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt B4
Close - Appliance
Refrigerator
Aug 4, 2026 · Apt B4
Close - Heat/hot water
Entire building
Jul 21, 2026 · Apt C21
Close - General
Janitor/super
Jul 19, 2026 · Apt C21
Close - Heat/hot water
Entire building
Jul 19, 2026 · Apt C21
Close - Heat/hot water
Entire building
Jul 18, 2026 · Apt D31
Close - Plumbing
Water supply
Jul 18, 2026 · Apt D31
Close - Heat/hot water
Entire building
Jul 17, 2026 · Apt C21
Close - Heat/hot water
Entire building
Jul 17, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jul 14, 2026 · Apt C44
Close - Paint/plaster
Wall
Jul 14, 2026 · Apt C44
Close - Unsanitary condition
Pests
Jul 3, 2026 · Apt C33
Close - Heat/hot water
Entire building
May 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 6, 2026 · Apt 31
Close - Heat/hot water
Entire building
May 6, 2026 · Apt C21
Close - Heat/hot water
Apartment only
Apr 25, 2026 · Apt C21
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt C21
Close - Heat/hot water
Entire building
Apr 18, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt C44
Close - Plumbing
Water supply
Apr 16, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 16, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 16, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2026 · Apt BLDG
Close - General
Signage missing
Apr 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 15, 2026 · Apt C21
Close - Door/window
Door
Apr 15, 2026 · Apt C44
Close - Plumbing
Water supply
Apr 15, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 14, 2026 · Apt C44
Close - Heat/hot water
Entire building
Apr 14, 2026 · Apt B43
Close - Heat/hot water
Entire building
Apr 13, 2026 · Apt C21
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1928
- Floors
- 4
- Residential units
- 60
- Building area
- 43,200 ft²
- Lot area
- 15,000 ft²
- Zoning
- R5
- Community board
- 401
- Council district
- 26
- Block / lot
- 638 / 19
- Assessed value
- $1,279,350
- Landmark / historic district
- No
HPD registration #401097, last renewed Sep 15, 2025.
Questions about 35-01 34 Street
Who owns 35-01 34 Street?
The owner of record in NYC Department of City Planning PLUTO data is 35-15 34th St Realty LLC.
Does 35-01 34 Street have violations?
Yes. NYC HPD has recorded 574 housing violations at this property.
Is 35-01 34 Street rent stabilized?
NYC Department of Finance tax bills listed 60 rent-stabilized units here in 2024 (about 100% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 35-01 34 Street built?
City records list 1928 as the year it was built.
How many apartments are in 35-01 34 Street?
It has 60 residential units and 62 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.