36-02 28 Avenue
Queens, NY 11103BBL 4-00630-0017Map
Owner of record: 28-03 36th Street LLC
36-02 28 Avenue is an elevator apartment building built in 2025 in Queens, 11103. It has 10 residential units across 6 floors. The owner of record is 28-03 36th Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 35
- ECB violations
- 20
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 25 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Construction other optional
C-construction other optional
Jul 14, 2000
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Construction other optional
C-construction other optional
Feb 5, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Construction other optional
Jm
Feb 22, 1991
Dob violation - active - Zoning none
Jm
Feb 22, 1991
Dob violation - active - Construction other optional
Mp
Feb 11, 1991
Vp-violation unserved ecb-active - Zoning none
Ac
Jan 5, 1990
Dob violation - active - Boiler boiler optional
6a
Oct 18, 1989
Vp-violation unserved ecb-active
ECB violations · 20
- Class - 2
Obs. closed 6 story nb with cons fence installed @ expo 1 & 2. several fence panels have holes as well as cracks & protruding towards the bottom onto the public right of way that expose pedestrians to cuts/slas
Aug 6, 2026 · Penalty $1,000
Resolve - Class - 2
New 6 story building . observed: active site ,cs present upon inspecrtion was noted sws has been erected on exposure 1.2 ., compare with drawings was found it has been build contrary to plans , missing cross b
Mar 4, 2025
Resolve - Class - 2
New 6 story building observed: active site and permit cs present upon inspection was noted several iteams through building like wood, playwood and styrofoam not fixed or tie up when dob issued a weather adviso
Mar 4, 2025
Resolve - Class - 2
On exposure #3 from 1st to 4th floor exterior walls outboard insulation were installed with thickness 3" r-value 15 contrary to architectural drawing which is thickness 2.5" r-value 16.7, conform work to approv
Feb 12, 2025
Resolve - Class - 2
B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records. submit a current inspeciton rep ort correct all violating conditions and submit the certificate of cor
Jun 6, 2016 · Penalty $500
Active - Hazardous
Work w/o permit. illegal work noted: at rear of bldg steel structure (deck) erected between garage & premises. approx 25'x20' at 2nd fl level. remedy: obtain approvals & permits for work stated above.
Sep 26, 1998
Resolve - Non-hazardous
Work without a permit illegal steel structure for deck bet bldg and car garage and enclosed with gate and brick wall (25'x20' & mt 15" also illegal curb cut. remedy: obtain a permit if feasible or restore premi
Mar 6, 1997 · Penalty $350
Resolve - Non-hazardous
Failure to comply with the commissioners order to correct the violati-ng condition and file a c of c with dept of bldg for violation 34141083p.remedy:correct the violating condition and file a c of c
Oct 16, 1996 · Penalty $500
Active - Non-hazardous
Failure to comply with the commissioner's order to correct the violat-ing condition and file a c of o with dept of bldgs for violation 34141084r.remedy:correct the violating condition file a c of c.
Oct 16, 1996 · Penalty $500
Active - Non-hazardous
Work without a permit work noted 1 story metal garage demolished. remedy- obtain a permit
Apr 11, 1996 · Penalty $350
Resolve
Show 10 more ↓
- Non-hazardous
Non complying building enlarged and converted note erection of roof deck and walls enclosing more than 50% of perimeter created floor area and an enlargemnt no per 12-10 zoning rezolutin which is contrary to
Apr 11, 1996 · Penalty $475
Active - Non-hazardous
Work without permit- work noted- a curb cut, pprox. 16'wide have been instlled at rear of above address, without permit from this dept. remedy: obtain permit if feasible or restore to prior legal condition.
Oct 25, 1995 · Penalty $350
Resolve - Non-hazardous
Fence exceeds permitted height.erected a fence at the rear of premiseson the south lot line.remedy:obtain a permit if feasible or lower fen-ce to 6 ft. overall.
Sep 19, 1995 · Penalty $300
Resolve - Non-hazardous
Fence exceeds permitted height noted: rear of premises on south side lot line. remedy obtain a permit if feasible or lower fence ot 6' overall.
Apr 20, 1994 · Penalty $150
Active - Non-hazardous
Occupancy contrary to that allowed by dept records (bn-983-89) legal use:open breezway. illegal use:open breezway being used to park motor vehicles. remedy:discontinue illegal use.
Nov 14, 1991
Resolve - Non-hazardous
Occupancy contrary to that allowed by dept records (nb 73-86)legal use:garage for parking of motor vehiles only. illegal use:storage of sodapaper goods,pushcarts. remedy:discontinue illegal use and return to us
Nov 14, 1991 · Penalty $285
Active - Non-hazardous
Illegal use in a residential district. operation and storage of food for push cart business. remedy: discontinue illegal use.
Sep 16, 1991 · Penalty $460
Active - Non-hazardous
Work without a permit steel car port erected approximately 22'x22'x15'high stairs installed,at rear between house&garage. remedy:obtain permit or remove illegal construction. note amend c of o
Jul 11, 1991
Resolve - Non-hazardous
Fence exceeds permitted height:(rear of premises,on the south lot line) remedy:obtain a permit if feasible or lower fence to 6' overall.
Feb 11, 1991 · Penalty $140
Active - Non-hazardous
B4a 6a safety or relief valve defective
Oct 18, 1989
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2025
- Floors
- 6
- Residential units
- 10
- Building area
- 8,994 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 401
- Council district
- 22
- Block / lot
- 630 / 17
- Assessed value
- $101,250
- Landmark / historic district
- No
Questions about 36-02 28 Avenue
Who owns 36-02 28 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 28-03 36th Street LLC.
Does 36-02 28 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 36-02 28 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 36-02 28 Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 36-02 28 Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.