31-18 33 Street
Queens, NY 11106BBL 4-00614-0049Map
Owner of record: Pavosevic, LLC
31-18 33 Street is a walk-up apartment building built in 1923 in Queens, 11106. It has 6 residential units across 3 floors. The owner of record is Pavosevic, LLC. HPD has recorded 37 housing violations here, most recently on September 3, 2024. 15 of the 37 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 37
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 100
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Sep 3, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 3, 2024
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 1st story
Sep 3, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Sep 3, 2024
Open — Nov sent out - ANon-hazardous
Post at or near the mailboxes or distribute to each tenant upon commencement of new lease or upon lease renewal, in the form approved by the commissioner, the annual bedbug report and a copy of the dohmh preventing and getting rid of bedbugs safely guide, according to the certification made on such annual bedbug report., 1st story
Sep 3, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of slidebolt with eye capable of being padlocked installed at metal gate obstructng egress from rear yard to street
Mar 13, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 3rd room from north at west located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and west wall in the 3rd room from north at east located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east and north wall in the 3rd room from north at east located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed
Show 27 more ↓
- ANon-hazardous
Replace with new the missing heat riser pipe escutcheon plate at ceiling in the bathroom located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the bathroom located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south, west and east walls in the bathroom located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 2nd room from north at east located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 2nd apartment from north at east
Feb 28, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 2nd apartment from north at east
Dec 28, 2023 · Apt 2F
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked at 1st story at public hall, 1st story
Dec 28, 2023
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 2f, 2nd story, 2nd apartment from north at east
Dec 28, 2023 · Apt 2F
Open — Nov certified late - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling at public hall, 1st story
Aug 9, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 9, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 9, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 9, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 9, 2023
Open — Nov certified late - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick down door stopper installed at building entrance door at public hall, 1st story
Aug 9, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 9, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story
Nov 26, 2018 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story
Nov 26, 2018 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 21, 2018
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2f, 2nd story, 2nd apartment from west at north
Mar 27, 2017 · Apt 2F
Open — Nov certified late - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2f, 2nd story, 2nd apartment from west at north
Mar 27, 2017 · Apt 2F
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2016
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 2nd apartment from west at north
Apr 28, 2012 · Apt 2F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 2nd apartment from west at north
Apr 28, 2012 · Apt 2F
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water at kitchen and bathroom fixtures located at apt 2f, 2nd story, apartment at north
Jan 31, 2012 · Apt 2F
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ...
Mar 25, 2008
Open — Not complied with
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- General
Signage missing
Jul 16, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 10, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 27, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 12, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Dec 26, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 22, 2023 · Apt BLDG
Close - General
Signage missing
Aug 15, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 5, 2023 · Apt BLDG
Close - Electric
No lighting
Jul 14, 2023 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Jul 4, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2021 · Apt 1F
Close - Heat/hot water
Entire building
Feb 6, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 19, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 23, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 15, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Oct 25, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Oct 19, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Apr 27, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 29, 2020 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 1, 2019 · Apt 3F
Close - Heat/hot water
Entire building
Nov 24, 2018 · Apt 3F
Close - Heat/hot water
Entire building
Nov 20, 2018 · Apt 1F
Close - Heat/hot water
Entire building
Nov 13, 2018 · Apt 1L
Close - Heat/hot water
Entire building
Nov 12, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 10, 2018 · Apt 2F
Close - Heat/hot water
Apartment only
Apr 17, 2018 · Apt 2F
Close - Heat/hot water
Apartment only
Apr 15, 2018 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 24, 2018 · Apt 2F
Close - Heat/hot water
Entire building
Nov 29, 2017 · Apt 3F
Close - Heat/hot water
Entire building
Nov 26, 2017 · Apt 3F
Close - Heat/hot water
Entire building
Nov 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2017 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 10, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Mar 25, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Mar 22, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 7, 2017 · Apt 2F
Close - Heat/hot water
Entire building
Dec 26, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 25, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Dec 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2016 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 21, 2016 · Apt 3F
Close - Heat/hot water
Entire building
Nov 21, 2016 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 10, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Nov 10, 2016 · Apt 3F
Close - Heat/hot water
Entire building
Nov 8, 2016 · Apt 3F
Close - Heat/hot water
Entire building
Oct 28, 2016 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1923
- Floors
- 3
- Residential units
- 6
- Building area
- 3,666 ft²
- Lot area
- 2,368 ft²
- Zoning
- R6
- Community board
- 401
- Council district
- 22
- Block / lot
- 614 / 49
- Assessed value
- $559,350
- Landmark / historic district
- No
HPD registration #420932, last renewed Jul 16, 2025.
Questions about 31-18 33 Street
Who owns 31-18 33 Street?
The owner of record in NYC Department of City Planning PLUTO data is Pavosevic, LLC.
Does 31-18 33 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 31-18 33 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 31-18 33 Street built?
City records list 1923 as the year it was built.
How many apartments are in 31-18 33 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.