26-17 28 Street
Queens, NY 11102BBL 4-00596-0033Map
Owner of record: Victorio Pace LLC
26-17 28 Street is an elevator apartment building built in 2010 in Queens, 11102. It has 19 residential units across 6 floors. The owner of record is Victorio Pace LLC. HPD has recorded 28 housing violations here, most recently on March 3, 2024. 4 of the 28 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 28
- DOB violations
- 21
- ECB violations
- 7
- HPD complaints
- 159
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ..latch at exit door-a to fire stairs at public hall, 2nd story
Mar 3, 2024
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ..latch at exit door -a to fire stairs at public hall, 1st story
Mar 3, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building front entrance door at public hall, 1st story
Mar 3, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective locking device and assembly at vestibule door at public hall, 1st story
Mar 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective locking and assembly at building front entrance door at public hall, 1st story
Mar 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire stair door a at public hall, 5th story
Feb 28, 2024
Open — Not complied with - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at fire stairs, 4th story
Aug 10, 2022
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at fire stairs, 5th story
Aug 10, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 9, 2020
Closed — Violation dismissed
Show 18 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 24, 2020
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 24, 2020
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from north at west located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - ANon-hazardous
Refit door in the 1st room from north located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16, 6th story, 1st apartment from south at west
Mar 2, 2016 · Apt 16
Closed — Violation closed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from north at west located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Properly repair the broken or defective sink base cabinet in the kitchen located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Replace with new the missing light fixture at ceiling. in the 2nd room from north at west located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the 2nd room from north at west located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16, 5th story, 1st apartment from south at west
Dec 28, 2015 · Apt 16
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 22, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2014
Dob violation - resolved
Show 11 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
Failure to provide protection at sides of excavation with no sheeting/ shoring at exposures # 2,3,&4. soil is shear cut and noted at locations. stop all work except to backfill adjoining rubble foundati on at exposure # 4 contact sep/ex for further instructions
Aug 7, 2008
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to provide protection at sides of excavation. no support for the excavation at exposures 2,3 & 4. the depth of the excavation is approx 10'-12' deep (shear cut). job #402539785-01-nb. remedy: provide
Aug 25, 2008
Resolve - Class - 2
Sec. bc3304.3.1;27-195. failure to notify dob w/i 24-48 hours of the start of excavation. the excavation is approx 10'-12' deep at exposure 2,3 & 4. remedy:comply w/nov. officially notify dob by calling
Aug 25, 2008 · Penalty $800
Resolve - Class - 1
Sec. bc3304.2 & 27-1031. failure to adequately support adjoining ground and/or structures affected by excavation. the excavation is approx 10'-12' deep @ exposures 2 and 4 w/no support of the adjoining property
Aug 25, 2008 · Penalty $1,600
Resolve - Class - 1
Sec. 27-1032b, bc 3304.4.4. failure to provide 3'6" guard rail or solid enclosure around open & accessible sides of excavation. no guard rails provided to protect workers at shear excavations approximately 20'
Aug 7, 2008 · Penalty $1,600
Resolve - Class - 2
Sec. rcny27-04, bc 3301.9.1. failure to provide a sign w/wording "to anonymously report unsafe conditions at this workside that endangers workers, call" on new bldg or demo site. at time of inspection no sign
Aug 7, 2008 · Penalty $400
Resolve - Class - 2
Failure to provide/post signs at job site pursuant to subsection. no signs at jobsite construction fence identifying owner or contractor as required. remedy: stop all work. comply w/nov. provide required signs
Aug 7, 2008 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. no solid construction fence at exposures #2, 3 & 4. gate at entrance swings out completely blocking sidewalk. plywood fence at
Aug 7, 2008 · Penalty $1,200
Resolve
Complaints
- Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Oct 28, 2025 · Apt 8
Close - Heat/hot water
Entire building
May 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Water leak
Slow leak
Nov 8, 2024 · Apt 3
Close - Heat/hot water
Entire building
Aug 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2010
- Floors
- 6
- Residential units
- 19
- Building area
- 20,739 ft²
- Lot area
- 6,938 ft²
- Zoning
- R6B
- Community board
- 401
- Council district
- 22
- Block / lot
- 596 / 33
- Assessed value
- $1,588,500
- Landmark / historic district
- No
HPD registration #429878, last renewed Jul 21, 2026.
Questions about 26-17 28 Street
Who owns 26-17 28 Street?
The owner of record in NYC Department of City Planning PLUTO data is Victorio Pace LLC.
Does 26-17 28 Street have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 26-17 28 Street rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 26-17 28 Street built?
City records list 2010 as the year it was built.
How many apartments are in 26-17 28 Street?
It has 19 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.