27-16 21 Street is an elevator apartment building built in 2023 in Queens, 11102. It has 49 residential units across 1 floor. The owner of record is Astoria 21 LLC. HPD has recorded 20 housing violations here, most recently on October 8, 2026. 17 of the 20 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.

HPD violations
20
DOB violations
2
ECB violations
6
HPD complaints
43

Available now in this building

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
49
About 100% of the building's 49 apartments
Up from 41 in 2023

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 20

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 2nd apartment from south at west

    Oct 8, 2026 · Apt 2D

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system hot water tank room door is locked at roof story at boiler room

    Oct 8, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 8a, 8th story, 1st apartment from east at south

    Sep 28, 2026 · Apt 8A

    Open — Violation will be reinspected
  • C

    Repair the roof so that it will not leak over ceiling in the bathroom located at apt 8a, 8th story, 1st apartment from east at south

    Sep 28, 2026 · Apt 8A

    Open — Civ14 mailed
  • C

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 8a, 8th story, 1st apartment from east at south

    Sep 28, 2026 · Apt 8A

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 28, 2026 · Apt 5F

    Open — Violation will be reinspected
  • B

    Remove all obstructions and repair all defects in wash basin wasteline in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 28, 2026 · Apt 5F

    Open — Civ14 mailed
  • C

    Provide ready access to buildings heating system boiler room door at cellar locked at boiler room

    Sep 28, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective mechanical ventilation system in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 19, 2026 · Apt 5F

    Open — Civ14 mailed
  • B

    Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 19, 2026 · Apt 5F

    Open — Civ14 mailed
Show 10 more ↓
  • A

    Properly repair or replace the broken or defective lock assembly at door in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 19, 2026 · Apt 5F

    Open — Civ14 mailed
  • A

    Properly repair or replace the broken or defective door lock in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 7, 2026 · Apt 5F

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south

    Sep 7, 2026 · Apt 5F

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective mechanical ventilation fan at ceiling in the bathroom located at apt 5f, 5th story, 2nd apartment from north at east

    Aug 27, 2026 · Apt 5F

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south

    Mar 2, 2026 · Apt 4G

    Closed — Violation dismissed
  • C

    Remove all obstructions from water closet in the bathroom located at apt 4g, 4th story, 2nd apartment from east at south

    Mar 2, 2026 · Apt 4G

    Open — Invalid certification
  • A

    Trace and repair the source and abate the visible mold condition... at wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south

    Mar 2, 2026 · Apt 4G

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south original violation 18680588 issued 02-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 2, 2026 · Apt 4G

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed

DOB building violations · 2

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 8, 1998

    Dob violation - dismissed

ECB violations · 6

  • Class - 1

    At the time of inspection of a proposed 7 story new building. work not conforming to the approved ccd1 line # 5. stairwells not enclosed as required by fdny. stop all construction operations from the 6th floor

    May 23, 2023 · Penalty $625

    Resolve
  • Class - 1

    Bc 3307.2.1 obstruction of streets or sidewalks at time of inspection it was observed street occupancy not in a continous line by yoddok system on the street,accessible to public(bobcat machine and concrete was

    May 13, 2023

    Resolve
  • Class - 2

    Observed exp1 soil slope more than 45deg no more than 65deg app.soe drw notes slope at 45deg field conditions not in conformance to drawings.also observed makeshift shoring of soil exp1 soe notes state contract

    Mar 1, 2023 · Penalty $625

    Resolve
  • Class - 2

    Observed water hose in jobsite leads to public street exp1 leading to sewer dranainge (21stand28thav) upon request for dep permits and dewatering plan req per code 3303.14.5.1 failed to provide.comply with cod

    Mar 1, 2023 · Penalty $625

    Resolve
  • Class - 1

    At the time of inspection, i observed on site to the rear of expo #3 in use a (worker/contractor shed)within construction site erected greater than 120sft adjacent to an occupied 3-story dwelling with electric

    Feb 8, 2023 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection, i observed on site to the rear of expo #3 in use an (worker/contractor shed) within construction site erected greather than 120sft, adjacent to an occupied 3-story dwelling with electrica

    Feb 8, 2023

    Resolve

Complaints

  • Water leak

    Heavy flow

    Oct 24, 2026 · Apt 5F

    Open
  • Plumbing

    Steam pipe/riser

    Oct 24, 2026 · Apt 5F

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Oct 14, 2026 · Apt BLDG

    Open
  • Plumbing

    Bathtub/shower

    Oct 10, 2026 · Apt 5F

    Open
  • Heat/hot water

    Apartment only

    Oct 6, 2026 · Apt 2D

    Open
  • Door/window

    Door

    Oct 6, 2026 · Apt 2D

    Open
  • Unsanitary condition

    Sewage

    Oct 6, 2026 · Apt 5E

    Close
  • Water leak

    Heavy flow

    Sep 27, 2026 · Apt 8A

    Close
  • Heat/hot water

    Apartment only

    Sep 27, 2026 · Apt 8A

    Close
  • Water leak

    Heavy flow

    Sep 22, 2026 · Apt 2D

    Close
Show 33 more ↓
  • Door/window

    Door

    Sep 22, 2026 · Apt 2D

    Close
  • Plumbing

    Toilet

    Sep 20, 2026 · Apt 5F

    Close
  • Door/window

    Door

    Sep 20, 2026 · Apt 5F

    Close
  • Plumbing

    Basin/sink

    Sep 20, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Sep 14, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Sep 13, 2026 · Apt 5F

    Close
  • Plumbing

    Basin/sink

    Sep 12, 2026 · Apt 5F

    Close
  • Door/window

    Door

    Sep 12, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Sep 12, 2026 · Apt 5F

    Close
  • Plumbing

    Basin/sink

    Sep 8, 2026 · Apt 5F

    Close
  • Door/window

    Door

    Sep 8, 2026 · Apt 5F

    Close
  • Plumbing

    Toilet

    Sep 8, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Sep 8, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Sep 4, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Aug 31, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Aug 28, 2026 · Apt 5F

    Close
  • Door/window

    Door

    Aug 28, 2026 · Apt 5F

    Close
  • Safety

    Window guard broken/missing

    Aug 28, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Aug 27, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Aug 26, 2026 · Apt 5F

    Close
  • General

    Ventilation system

    Aug 18, 2026 · Apt 5F

    Close
  • Electric

    Power outage

    Aug 5, 2026 · Apt APT4G

    Close
  • Door/window

    Door

    May 28, 2026 · Apt 1B

    Close
  • Door/window

    Door

    May 28, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Jan 22, 2026 · Apt 7F

    Close
  • Plumbing

    Toilet

    Dec 9, 2025 · Apt 4G

    Close
  • Unsanitary condition

    Mold

    Dec 9, 2025 · Apt 4G

    Close
  • Unsanitary condition

    Pests

    Aug 24, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    May 4, 2025 · Apt 4A

    Close
  • Plumbing

    Water supply

    Aug 6, 2024 · Apt 5E

    Close
  • Plumbing

    Basin/sink

    Jun 29, 2024 · Apt 5E

    Close
  • Plumbing

    Water supply

    Jun 29, 2024 · Apt 5E

    Close
  • Unsanitary condition

    Pests

    May 1, 2024 · Apt 5B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2023
Floors
1
Residential units
49
Building area
36,817 ft²
Lot area
6,735 ft²
Zoning
R7X
Community board
401
Council district
22
Block / lot
539 / 32
Assessed value
$3,072,600
Landmark / historic district
No

HPD registration #434223, last renewed Aug 28, 2025.

Questions about 27-16 21 Street

Who owns 27-16 21 Street?

The owner of record in NYC Department of City Planning PLUTO data is Astoria 21 LLC.

Does 27-16 21 Street have violations?

Yes. NYC HPD has recorded 20 housing violations at this property.

Is 27-16 21 Street rent stabilized?

NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 27-16 21 Street built?

City records list 2023 as the year it was built.

How many apartments are in 27-16 21 Street?

It has 49 residential units and 50 units in total.