27-16 21 Street
Queens, NY 11102BBL 4-00539-0032Map
Owner of record: Astoria 21 LLC
27-16 21 Street is an elevator apartment building built in 2023 in Queens, 11102. It has 49 residential units across 1 floor. The owner of record is Astoria 21 LLC. HPD has recorded 20 housing violations here, most recently on October 8, 2026. 17 of the 20 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 2
- ECB violations
- 6
- HPD complaints
- 43
Available now in this building
For rent2-bedroom condo for rent in astoria
New York, NY
For rent2-bedroom condo for rent in astoria
New York, NY
For rent2-bedroom condo for rent in astoria
New York, NY
For rent2-bedroom condo for rent in astoria
New York, NY
For rent2-bedroom condo for rent in astoria
New York, NY
For rent2-bedroom condo for rent in astoria
New York, NY
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 2nd apartment from south at west
Oct 8, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system hot water tank room door is locked at roof story at boiler room
Oct 8, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 8a, 8th story, 1st apartment from east at south
Sep 28, 2026 · Apt 8A
Open — Violation will be reinspected - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 8a, 8th story, 1st apartment from east at south
Sep 28, 2026 · Apt 8A
Open — Civ14 mailed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 8a, 8th story, 1st apartment from east at south
Sep 28, 2026 · Apt 8A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5f, 5th story, 2nd apartment from east at south
Sep 28, 2026 · Apt 5F
Open — Violation will be reinspected - BHazardous
Remove all obstructions and repair all defects in wash basin wasteline in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 28, 2026 · Apt 5F
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door at cellar locked at boiler room
Sep 28, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 19, 2026 · Apt 5F
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 19, 2026 · Apt 5F
Open — Civ14 mailed
Show 10 more ↓
- ANon-hazardous
Properly repair or replace the broken or defective lock assembly at door in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 19, 2026 · Apt 5F
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective door lock in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 7, 2026 · Apt 5F
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 5f, 5th story, 2nd apartment from east at south
Sep 7, 2026 · Apt 5F
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation fan at ceiling in the bathroom located at apt 5f, 5th story, 2nd apartment from north at east
Aug 27, 2026 · Apt 5F
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south
Mar 2, 2026 · Apt 4G
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet in the bathroom located at apt 4g, 4th story, 2nd apartment from east at south
Mar 2, 2026 · Apt 4G
Open — Invalid certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south
Mar 2, 2026 · Apt 4G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at wood base cabinet at sink in the kitchen located at apt 4g, 4th story, 2nd apartment from east at south original violation 18680588 issued 02-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 2, 2026 · Apt 4G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed
DOB building violations · 2
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 8, 1998
Dob violation - dismissed
ECB violations · 6
- Class - 1
At the time of inspection of a proposed 7 story new building. work not conforming to the approved ccd1 line # 5. stairwells not enclosed as required by fdny. stop all construction operations from the 6th floor
May 23, 2023 · Penalty $625
Resolve - Class - 1
Bc 3307.2.1 obstruction of streets or sidewalks at time of inspection it was observed street occupancy not in a continous line by yoddok system on the street,accessible to public(bobcat machine and concrete was
May 13, 2023
Resolve - Class - 2
Observed exp1 soil slope more than 45deg no more than 65deg app.soe drw notes slope at 45deg field conditions not in conformance to drawings.also observed makeshift shoring of soil exp1 soe notes state contract
Mar 1, 2023 · Penalty $625
Resolve - Class - 2
Observed water hose in jobsite leads to public street exp1 leading to sewer dranainge (21stand28thav) upon request for dep permits and dewatering plan req per code 3303.14.5.1 failed to provide.comply with cod
Mar 1, 2023 · Penalty $625
Resolve - Class - 1
At the time of inspection, i observed on site to the rear of expo #3 in use a (worker/contractor shed)within construction site erected greater than 120sft adjacent to an occupied 3-story dwelling with electric
Feb 8, 2023 · Penalty $625
Resolve - Class - 2
At time of inspection, i observed on site to the rear of expo #3 in use an (worker/contractor shed) within construction site erected greather than 120sft, adjacent to an occupied 3-story dwelling with electrica
Feb 8, 2023
Resolve
Complaints
- Water leak
Heavy flow
Oct 24, 2026 · Apt 5F
Open - Plumbing
Steam pipe/riser
Oct 24, 2026 · Apt 5F
Open - Unsanitary condition
Garbage/recycling storage
Oct 14, 2026 · Apt BLDG
Open - Plumbing
Bathtub/shower
Oct 10, 2026 · Apt 5F
Open - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 2D
Open - Door/window
Door
Oct 6, 2026 · Apt 2D
Open - Unsanitary condition
Sewage
Oct 6, 2026 · Apt 5E
Close - Water leak
Heavy flow
Sep 27, 2026 · Apt 8A
Close - Heat/hot water
Apartment only
Sep 27, 2026 · Apt 8A
Close - Water leak
Heavy flow
Sep 22, 2026 · Apt 2D
Close
Show 33 more ↓
- Door/window
Door
Sep 22, 2026 · Apt 2D
Close - Plumbing
Toilet
Sep 20, 2026 · Apt 5F
Close - Door/window
Door
Sep 20, 2026 · Apt 5F
Close - Plumbing
Basin/sink
Sep 20, 2026 · Apt 5F
Close - General
Ventilation system
Sep 14, 2026 · Apt 5F
Close - General
Ventilation system
Sep 13, 2026 · Apt 5F
Close - Plumbing
Basin/sink
Sep 12, 2026 · Apt 5F
Close - Door/window
Door
Sep 12, 2026 · Apt 5F
Close - General
Ventilation system
Sep 12, 2026 · Apt 5F
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 5F
Close - Door/window
Door
Sep 8, 2026 · Apt 5F
Close - Plumbing
Toilet
Sep 8, 2026 · Apt 5F
Close - General
Ventilation system
Sep 8, 2026 · Apt 5F
Close - General
Ventilation system
Sep 4, 2026 · Apt 5F
Close - General
Ventilation system
Aug 31, 2026 · Apt 5F
Close - General
Ventilation system
Aug 28, 2026 · Apt 5F
Close - Door/window
Door
Aug 28, 2026 · Apt 5F
Close - Safety
Window guard broken/missing
Aug 28, 2026 · Apt 5F
Close - General
Ventilation system
Aug 27, 2026 · Apt 5F
Close - General
Ventilation system
Aug 26, 2026 · Apt 5F
Close - General
Ventilation system
Aug 18, 2026 · Apt 5F
Close - Electric
Power outage
Aug 5, 2026 · Apt APT4G
Close - Door/window
Door
May 28, 2026 · Apt 1B
Close - Door/window
Door
May 28, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 22, 2026 · Apt 7F
Close - Plumbing
Toilet
Dec 9, 2025 · Apt 4G
Close - Unsanitary condition
Mold
Dec 9, 2025 · Apt 4G
Close - Unsanitary condition
Pests
Aug 24, 2025 · Apt 2A
Close - Unsanitary condition
Pests
May 4, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 6, 2024 · Apt 5E
Close - Plumbing
Basin/sink
Jun 29, 2024 · Apt 5E
Close - Plumbing
Water supply
Jun 29, 2024 · Apt 5E
Close - Unsanitary condition
Pests
May 1, 2024 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 1
- Residential units
- 49
- Building area
- 36,817 ft²
- Lot area
- 6,735 ft²
- Zoning
- R7X
- Community board
- 401
- Council district
- 22
- Block / lot
- 539 / 32
- Assessed value
- $3,072,600
- Landmark / historic district
- No
HPD registration #434223, last renewed Aug 28, 2025.
Questions about 27-16 21 Street
Who owns 27-16 21 Street?
The owner of record in NYC Department of City Planning PLUTO data is Astoria 21 LLC.
Does 27-16 21 Street have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 27-16 21 Street rent stabilized?
NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 27-16 21 Street built?
City records list 2023 as the year it was built.
How many apartments are in 27-16 21 Street?
It has 49 residential units and 50 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.