42-12 28 Street

Queens, NY 11101BBL 4-00422-0007Map

Owner of record: 4212 28st De LLC

42-12 28 Street is an elevator apartment building built in 2015 in Queens, 11101. It has 450 residential units across 58 floors. The owner of record is 4212 28st De LLC. HPD has recorded 7 housing violations here, most recently on November 15, 2022. 6 of the 7 most recent violations are still open. City tax records listed 450 rent-stabilized apartments here in 2024.

HPD violations
7
DOB violations
24
ECB violations
47
HPD complaints
19

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 15, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
450
About 100% of the building's 450 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 7

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2022

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective 2nd window at south wall in the 2nd room from east located at apt 56a, 56th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 56A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south & north walls in the 2nd room from east located at apt 56a, 56th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 56A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood baseboard at south & west walls in the 2nd room from east located at apt 56a, 56th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 56A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department south and west walls in the 2nd room from east located at apt 56a, 56th story, 1st apartment from south at west

    Aug 25, 2021 · Apt 56A

    Open — Nov certified late
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 25, 2021

    Open — Nov sent out
  • B

    Replace with new the broken or defective crack window glass in the 2nd room from north at west located at apt 55a, 55th story, 1st apartment from south at west

    Jun 12, 2019 · Apt 55A

    Open — Nov certified late

DOB building violations · 24

  • Hazardous condition (facade) facade required

    Cycle 9c unsafe report filed

    Jul 11, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 4, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 9, 2021

    Dob violation - dismissed
  • Construction other optional

    Emergency work orderdue to defective acm panels at exposure #3, west elevation on bulkhead. remedy: take and provide safety measures to secure the public safety and install public protection at exposure #3 west and exposure #4 north. make immed repairs under supervision of lic prof to the def acm panel @ 58fl bulkhead. vacate entire terr

    May 8, 2021

    Dob violation - dismissed
  • Construction other optional

    Ftm facade and appurtenances, on 05/05/2021 observed acm panel was missing on bulkhead. remedy: owner to immed retain services of nyc lic pe/ra wthon curtain wall facade to inspect and evaluate 100% of acm panels at all exposures to determine safety of same and cause of failure same pe/ra shall create report of result of inspection

    May 8, 2021

    Dob violation - dismissed
  • Construction other optional

    Vacate order. entire terraces at exposure #3 west elevation at 58fl and 6fl. secure noted areas from public access. remedy: comply with order of the commissioner

    May 8, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - dismissed
  • Construction other optional

    On 01/04/18 a glasss window fell out of 6th story occupied apartment @ exp#1. remedy:owner to immed retain a nys lic professional to evaluate all glass windows and facade glass curtain wall conditions. owner to immed inspect 100% of windows and curtain walls.provide eng'r report & repair drwgs/proposals by 2/18/18 submit all info to facades unit

    Jan 18, 2018

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant matter. on 1/4/18 a glass fell out of the 6th floor occupied apartment at expo#1 right side see dob# 334289, 334288, ecb# 35264801r maintain building safe and code compliant: install sidewalk shed to protect public and aound on the building

    Jan 18, 2018

    Dob violation - dismissed
  • Construction other optional

    Addt'l info:on 1/18/18 the deot of buildings ordered the facades to be immed evaluated and made safe. remedy:by close of business 1/31/18 provide copies of all house rig certifications all facade repair docs (filed or unfiled w/dob)

    Jan 18, 2018

    Dob violation - dismissed
Show 14 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 13, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 23, 2017

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 20, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 27, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 21, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 5, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 23, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 20, 2011

    Dob violation - dismissed
  • Construction other optional

    Due to construction of 402654971-01-nb and associated 41022816 steel sheetin has been installed at above referenced property approx 20 feet from above building causing linear crack and settlement causing pavement to move towards construction site. width of cracks approx 0"-2" and approx 40 linear feet long. make safe or replace pavement

    Aug 6, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed

ECB violations · 47

  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:at time of inspection observed defective facade.at roof level, facing exp #3, west elevation missing acm panels above terraces at bulkhead.rem

    Jun 15, 2021

    Resolve
  • Class - 1

    Failure to take/provide safety measures such as sidewalk shed fence,netting,etc where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04.facade technical report file

    May 8, 2021

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances.note:at time of inspection observed defective facade exp #3, west elevation(bulkhead):missing acm panels above terrace.remedy:maintain exterior bui

    May 8, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to take provide safety measures such as sidewalk shed's,fence,etc where required to protect and secure public safety from documentedunsafe facade as per 1rcny-103-04. facade technical report file unsafe

    Mar 13, 2021

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. at time of inspection observed at roof level ice has accumulated on equipment and on cooling tower louver's. ice particles have detached and fallen over pe

    Dec 18, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    97x10 repair and restore to service.

    Jun 17, 2019

    Resolve
  • Class - 2

    02x10 repair emergency phone.

    Dec 24, 2018 · Penalty $625

    Active
  • Class - 2

    Sec: bc 3310.3. failure to have site safety program as per code. @ time of insp on a active jobsite of a 58 story bldg, observed store(pizzeria) being built under permit# 421592477 alt2 @ exp#1,ground level. up

    Aug 21, 2018 · Penalty $250

    Resolve
  • Class - 1

    Failure to maintain @time of insp observed window on 57th fl balcont door from swinging unto window located as 2nd panel from edge of exp#2 adjacent to exp#1 some glass also ha fallen onto street @enclosed area

    Feb 5, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner: on 1/4/18 a glass window fell out of the 6th floor occupied apart at exp#1 right side. rmdy: maintain bldg safet and code compliant. install sidewalk shed to

    Jan 18, 2018 · Penalty $1,030

    Resolve
Show 37 more ↓
  • Class - 1

    Failure to safeguard public property in response to an incident where it was reported that 8 windows had fallen from apt 6d onto 28 st window size is approx. 5' x 3' and fell approx 6 stories over building entr

    Jan 4, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Sidewalk shed where required. in response to an incident of a window that blew away from the 6 story observed that sidwalk shed was missing at this location(exp #1) at front entrance.while checking site safety

    Jan 4, 2018 · Penalty $4,800

    Resolve
  • Class - 1

    3314.4.3.4 pre-shift inspection of scaffold. observed 2 men on scaffold on observation floor (59th fl) when i asked master rigger for pre-inspection report and logs of inspections for suspended scaffold use non

    Dec 19, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Guardrails inadequate/not maintained.@ inspection of 58 story new building observed guardrail system @ exp 1 where hoist removed,had cables that were not taut(give was more than 2in)& netting not secured or mis

    Oct 3, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Work w/o permit/expired. @ time of insp. noted permit for mini spider crane use had expired. permit 440244362 expired aug. 17 2016. as per ssm log bbok crane was operational fri sept 22,& sept 23 2017. remedy:

    Sep 23, 2017 · Penalty $800

    Resolve
  • Class - 1

    Work w/o a permit. @ time of insp. note 3 fully furnished apts locatedon the 10th fl when i asked if a permit was obtained for the use of these model apts i was told no. remedy: stop all use model apts obtain p

    Sep 23, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Contrary to plans noticed at time of inspection 58 sty nb in progress noticed sidewalk shed erected at exp33 not covering entire sidewalk. site safety plan shows shed to cover entire sidewalk. remedy: conform

    Oct 5, 2016 · Penalty $250

    Resolve
  • Class - 1

    Failure to safeguard all persons,public and property affected by construction operations.at time of inspection, active jobsite,the site safety manager states that a bolt fell from the bldg and struck a box truc

    Apr 21, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction. no toeboards. noted: at 38 story new building under con struction has missing toeboards at various places on multiple stories

    Apr 11, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    28-201.1 failure to comply w/an order of commissioner regarding concrete embedded safety strap dated on june 13,2008 at time of inspection concrete embedded safety straps installed with no maintenance log for

    Apr 11, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction oeperations. 16"long piece of #5 fell from 57th fl striking nycta bus at roof & impaling it at mid section. also metal stud approx 5'long als

    Jan 18, 2016 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to institute/maintain saftey equipment measures on temporary construction-no toe boards.at time or inspection observed no toe boardson 40th floor and surounded by staircase for walking deck.rem:maintain

    Nov 12, 2015 · Penalty $1,030

    Resolve
  • Class - 2

    3310.6 designated site safety manager:concrete safety manager not designated note:@time of insp observed 58 story bldg in progress.concrete ops in progress @41 fl since 10/2/15 csm lic #2109- (danizl t. morgan)

    Oct 29, 2015 · Penalty $830

    Resolve
  • Class - 2

    3310.7 desihn drawing required by the provision of chapter 33 of nyc bldg code:overhead protection note:responded to dob incident where planking from overhead protection above hoist was blown off of hoist into

    Oct 29, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to maintain:no guardrails.note:observed const site erecting/poring 41 fl deck observed approx 30 workers on deck.there were no guardrails in place @egress ladder from deck,there were no guardrails aroun

    Oct 29, 2015 · Penalty $2,430

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by const ops.no rebar caps note:const site erected @the 41 st fl observed concrete ops in progress.approx 30-40 workers caps in place.rebar pertruding approx

    Oct 29, 2015 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to safeguard all perons & property affected by construction operations. note: observed active jobsite,at the 22nd fl curtain walls operations in progress directly over adjacent jobsite under address 27-

    Oct 20, 2015 · Penalty $2,430

    Resolve
  • Class - 2

    Failure to maintain: housekeeping. note: at exp#1 along 28th street observe wood debris,pallets,plywood in front of ad;sites 2nd egress point. this area should not be allowed to collect debris. remove debris

    Oct 20, 2015

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. note: 58 sty bldg under const erecting 29 floor in progress. observed at 29 floor which is heaavily active work deck & rebar caps

    Sep 17, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 3301.7 design drawing required by the provision of chapter 33 of nyc bldg code. note: 58 sty bldg under construction,erecting 29 fl in progress. observed at the 21st fl a mechanical hoisting device being

    Sep 17, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no guardrails.noted @ time of inspection of 58 story new bldg @ the 13 fl has inadequate guardrails @ 3rd flood rear (setgreat)g

    Jul 27, 2015 · Penalty $2,430

    Resolve
  • Class - 1

    Failure to file evidence of compliance w/ workers comp law &/or disability benefits law:noted @ time of inspection of preposed 58 story new bldg under construction has approx 130-140 men on site @ (woreleiry)de

    Jul 27, 2015 · Penalty $1,280

    Resolve
  • Class - 1

    Use of supported scaffold w/o a scaffold user cert.noted @ time of inspection of proposed 58 story new bldg under construction has one man walking on 2 stage (baker) scaffold w/ no 4hr user cert to use supporte

    Jul 27, 2015 · Penalty $1,630

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary equipment-no handrails.noted @ time of inspection of 58 story new bldg @ 15 fl,has net installed temporary handrail between fls 12-13 fls for

    Jul 27, 2015 · Penalty $1,030

    Resolve
  • Class - 2

    Work does not conform to approved construction documents/or approved amendements. note: at time of inspection of active construction site ofa 50 sty bldg observed caccom chips installed on 7 & 8 fl at exp 1,2,3

    Jul 1, 2015

    Resolve
  • Class - 1

    Failure to institute maintain safety equipment measures or temporary construction-no handrail installed in stairway a & b in between floors 5th thru 7th floors poses a safety concern & endangering workers at

    Jul 1, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Sidewalk shed panels at exp#1 over hoist platform does not meet code specifications: sidewalk shed panels not painted hunter green & meet local law specifications. panels are painted red. remedy: comply w/code.

    Jul 1, 2015

    Resolve
  • Class - 1

    Fail to perform hydrostatic pressure test on standpipe at time of inspection @10am bldg complete to 11 sty active construction site. standpipe completed to 7th fl as per dob record no dp-98 on file work in prog

    Jul 1, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3308.1.3 horizontal safety netting not provided at time of inspection. note: (con) pouring in progressof 11th fl deck & no horizontal netting in place as required at exp#1,2 & 3 during conc operations,also

    Jul 1, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3301.4 inspection of equipment. concrete pump. note: at time of inspection active construction site pour concrete at 11th fl. upon request for maintance log for concrete pump none was provided-pump is inst

    Jul 1, 2015

    Resolve
  • Class - 2

    Failure to maintain housekeeping. at time of inspection observed active jobsite.bldg erected up to the 4th flr level. the horizontal nettingsystem in place at exp#2 had concrete debris,some larger pcs of debris

    May 11, 2015

    Resolve
  • Class - 1

    Failure to maintain toeboards. at time of inspection observed active jobsite at the 4th flr level observed erecting operations in progress rebar work. there were no toeboards installed around the perimeter of

    May 11, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    3307.7 fences: not adequate.no design drawing.a time of inspection ob served active jobsite,2nd flr erecting operations in progress. at exp1obseved chainlink fence erected on top of u dock barricades. ssp state

    Apr 11, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard: no overhead protection adjacent yard and driveway. at time of inspection observed action jobsite erected apprx 25'above ground. at exp#4 observed active driveway,cars,people making deliver

    Apr 11, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    No fdny permit for temp.heaters.noticed @ time of insp.nb in progress kerosene temp.heaters in use no permit from fdny on site for heaters.rem:obtain permit for heaters.

    Jan 7, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to have watch person present @ site during hrs when const operations are not inprogress as required by code & ground area between 5,00 & 40000 sq ft.rem:provide watch person.

    Aug 12, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Electrical work permit not obtain. note @ time of inspec.active job site observed electrical power is being supplied from adjacent property 27-03 42ndrd to const.site@ 42-12 28 st. w/o obtaining a temp.permit.r

    Apr 30, 2014 · Penalty $1,600

    Resolve

Complaints

  • Water leak

    Heavy flow

    Oct 6, 2026 · Apt 40C

    Open
  • Unsanitary condition

    Pests

    Sep 3, 2026 · Apt 22K

    Close
  • Door/window

    Door

    Jul 14, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Jun 24, 2026 · Apt 35I

    Close
  • Heat/hot water

    Apartment only

    Dec 24, 2025 · Apt 44H

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2025 · Apt 44H

    Close
  • Flooring/stairs

    Floor

    May 9, 2025 · Apt 19I

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 23, 2024 · Apt BLDG

    Close
  • Door/window

    Window frame

    Aug 18, 2021 · Apt 56A

    Close
Show 9 more ↓
  • Unsanitary condition

    Pests

    Apr 14, 2020 · Apt 9K

    Close
  • General

    Ventilation system

    Apr 14, 2020 · Apt 41C

    Close
  • Water leak

    Slow leak

    Apr 14, 2020 · Apt 41C

    Close
  • Electric

    Power outage

    Apr 14, 2020 · Apt 41C

    Close
  • Unsanitary condition

    Pests

    Apr 13, 2020 · Apt 5I

    Close
  • Safety

    Smoke detector

    Apr 13, 2020 · Apt 5I

    Close
  • Unsanitary condition

    Pests

    Apr 10, 2020 · Apt 9K

    Close
  • Electric

    Power outage

    Feb 4, 2020 · Apt 25A

    Close
  • Safety

    Fire escape

    Apr 24, 2019 · Apt 55A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2015
Floors
58
Residential units
450
Building area
475,485 ft²
Lot area
17,500 ft²
Zoning
M1-6/R10
Community board
402
Council district
26
Block / lot
422 / 7
Assessed value
$56,156,400
Landmark / historic district
No

HPD registration #432342, last renewed Aug 1, 2025.

Questions about 42-12 28 Street

Who owns 42-12 28 Street?

The owner of record in NYC Department of City Planning PLUTO data is 4212 28st De LLC.

Does 42-12 28 Street have violations?

Yes. NYC HPD has recorded 7 housing violations at this property.

Is 42-12 28 Street rent stabilized?

NYC Department of Finance tax bills listed 450 rent-stabilized units here in 2024 (about 100% of its 450 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 42-12 28 Street built?

City records list 2015 as the year it was built.

How many apartments are in 42-12 28 Street?

It has 450 residential units and 451 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.