roofy

45-46 48 Street

Queens, NY 11377BBL 4-00151-0053Map

Owner of record: Mohammad Amjad Ali

45-46 48 Street is a walk-up apartment building built in 1928 in Queens, 11377. It has 6 residential units across 3 floors. The owner of record is Mohammad Amjad Ali. HPD has recorded 86 housing violations here, most recently on September 10, 2026. 42 of the 50 most recent violations are still open.

HPD violations
86
DOB violations
5
ECB violations
0
HPD complaints
46

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 86

  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel surface at bathtub by method of reglazing in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the 3rd room from east at south, the foyer , the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at suspended ceiling in the 2nd room from east at north located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at suspended ceiling in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood panel inside the sink cabinet in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyer located at apt 1r, 1st story, 2nd apartment from east at south

    Sep 10, 2026 · Apt 1R

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 2F

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 2F

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 2F

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 2F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 28, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from east at south original violation 14734170 issued 19-dec-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Dec 19, 2021 · Apt 2R

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from east at south

    Dec 19, 2021 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector mssing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Dec 19, 2021 · Apt 2R

    Open — Nov certified late
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Dec 19, 2021 · Apt 2R

    Open — Nov certified late
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Dec 19, 2021 · Apt 2R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Dec 19, 2021 · Apt 2R

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the broken or defective second window from east at south, lower sash, counter balance in the 3rd room from north at east located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retarded ceiling, west and north walls at public hall, 3rd story

    Oct 27, 2021

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at the ceiling at public hall, 3rd story

    Oct 27, 2021

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste line under the wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, west and north walls in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wire at the ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Properly repair the broken or defective first and second window from south at west, lower sash, counter balance in the kitchen located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Properly repair the broken or defective first and second window from at south, lower sash counter balance in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at the ceiling in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from south at west

    Oct 27, 2021 · Apt 3F

    Open — Nov sent out

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - active

ECB violations · 0

No ECB violations on record

Complaints

  • General

    Cabinet

    Sep 9, 2026 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Sep 9, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 9, 2026 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Sep 9, 2026 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jul 7, 2025 · Apt 3F

    Close
  • Safety

    Window guard broken/missing

    Jul 7, 2025 · Apt 3F

    Close
  • Flooring/stairs

    Floor

    Jul 7, 2025 · Apt 3F

    Close
  • General

    Bell/buzzer/intercom

    Jul 7, 2025 · Apt 3F

    Close
  • Safety

    Fire escape

    Jul 7, 2025 · Apt 3F

    Close
Show 36 more ↓
  • Unsanitary condition

    Mold

    Jul 7, 2025 · Apt 3F

    Close
  • Safety

    Smoke detector

    Mar 17, 2025 · Apt 1F

    Close
  • Safety

    Carbon monoxide detector

    Mar 17, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Dec 1, 2021 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Dec 1, 2021 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Dec 1, 2021 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2021 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Nov 30, 2021 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Oct 23, 2021 · Apt 3F

    Close
  • Unsanitary condition

    Sewage

    Oct 23, 2021 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Oct 23, 2021 · Apt 3F

    Close
  • Water leak

    Slow leak

    Oct 23, 2021 · Apt 3F

    Close
  • Unsanitary condition

    Mold

    Oct 23, 2021 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2020 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2019 · Apt 3F

    Close
  • Heating

    Heat related

    Mar 14, 2013 · Apt 3FLR

    Close
  • Heating

    Heat related

    Feb 21, 2013 · Apt 3R

    Close
  • Heating

    Heat related

    Feb 18, 2013 · Apt NA

    Close
  • Paint/plaster

    Wall

    Jun 16, 2010 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 16, 2010 · Apt 2F

    Close
  • General

    Ventilation system

    Jun 16, 2010 · Apt 2F

    Close
  • General

    Locks

    Jun 16, 2010 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 16, 2010 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 16, 2010 · Apt 2F

    Close
  • Paint/plaster

    Window/frame

    Jun 16, 2010 · Apt 2F

    Close
  • Nonconst

    Janitor/super

    Dec 2, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 2, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 23, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 7, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 21, 2005 · Apt 3R

    Close
  • Heating

    Heat related

    Feb 19, 2005 · Apt 3R

    Close
  • Heating

    Heat related

    Feb 17, 2005 · Apt 3R

    Close
  • Heating

    Heat related

    Feb 13, 2005 · Apt 3B

    Close
  • Heating

    Heat related

    Feb 11, 2005 · Apt 3B

    Close
  • General

    Doors

    Dec 19, 2003 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1928
Floors
3
Residential units
6
Building area
3,600 ft²
Lot area
2,375 ft²
Zoning
R6A
Community board
402
Council district
26
Block / lot
151 / 53
Assessed value
$343,350
Landmark / historic district
No

HPD registration #408228, last renewed Jul 21, 2025.

Questions about 45-46 48 Street

Who owns 45-46 48 Street?

The owner of record in NYC Department of City Planning PLUTO data is Mohammad Amjad Ali.

Does 45-46 48 Street have violations?

Yes. NYC HPD has recorded 86 housing violations at this property.

Is 45-46 48 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 45-46 48 Street built?

City records list 1928 as the year it was built.

How many apartments are in 45-46 48 Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.