45-19 Davis Street is an elevator apartment building built in 2023 in Queens, 11101. It has 122 residential units across 17 floors. The owner of record is Davis Street Development LLC. HPD has recorded 1 housing violation here, most recently on January 28, 2026. City tax records listed 89 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 1
- ECB violations
- 22
- HPD complaints
- 9
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 15th story
Jan 28, 2026
Closed — Violation closed
DOB building violations · 1
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed
ECB violations · 22
- Class - 2
Failure to provide protection of adjoining properties during construction as required.observed setback/terrace at exp#3 with unfurnished parapet no coping and loose material such as concrete pieces left on top
Aug 17, 2024 · Penalty $5,000
Resolve - Class - 1
28-111 model apartment inside active jobsite without a permit.observeda model apartment on the 5th fl-apt 5e fully furnished including a made bed & personal effects/decorations ready to be shown to prospective
Aug 17, 2024 · Penalty $2,500
Resolve - Class - 2
Work after hours without a variance permit,contrary to 28-105.12.5.observed active removing of adj building roof protection at exp#2 review of active afh permit shows that this work was not included in the work
Aug 17, 2024 · Penalty $625
Resolve - Class - 2
Responsability for safety. observed matrial storage on the street at exposure, not protected from being accessible to pedestrians open at multiple exposures and crossing of pedestrians. material stones, a-frame
Aug 11, 2024 · Penalty $2,500
Resolve - Class - 2
Observed two 2-point outrigger beam suspended scaffolds at exps#1&2 built contrary to the dob-approved design drawings- 2 tie-back anchors (1 at both rigs) installed in crooked position/ not as per drawing; exp
Jun 10, 2024
Resolve - Class - 2
Observed ez-scale multi-point suspended scaffolds at exps# 1 & 3 with several crimp clips different than others and not shown on the dob-approved design drawings.. stop all use of all ez-scale multi-point suspe
Jun 10, 2024
Resolve - Class - 2
Observed ez-scale multi-point suspended scaffolds at exps# 1 & 3 with the majority of suspension points/connections missing inspection tags, as required.. stop all use of all ez-scale multi-point suspended scaf
Jun 10, 2024
Resolve - Class - 1
Responsability for safety. it was observed workers working on leading edge of a balcony on the 14th floor with damaged retractable worker ontop of sidewalk shed approx. 10 feet above ground floor without full p
Jun 8, 2024 · Penalty $5,000
Resolve - Class - 2
Work after hours. observed workers working on balcony at exposure 3 installing guardrails, at exposure 1 masonry work on exposure and washing on supported scaffold. scope of work allowed for after hours permit
Jun 8, 2024 · Penalty $625
Resolve - Class - 1
Failure to provide/maintain guardrails. observed guardrails at setbacks and balconies with cable system loose, ripped/teared netting, balcony on 17 floor with loose netting missing rails conponent and 1 floor e
Jun 8, 2024 · Penalty $5,000
Resolve
Show 12 more ↓
- Class - 1
Fire code. observed workers cutting metal at ground floor and later during course of the inspection on the 17th floor close to exposure 1 balcony. residues of cut left unattended on the floor with different mat
Jun 8, 2024 · Penalty $5,000
Resolve - Class - 1
Documents to be kept on site. observed 2 workers working/operating on the 17th floor, upon request for planning calos to operate the manlifts, none were available or provided. nor inspections to use manlifts. s
Jun 8, 2024
Resolve - Class - 2
Observed a make-shift safety netting system consisting of wood draped with loose netting attached to the nb's exp#4 exterior wall, on the property line w/ the exp#4 adj property. upon request for a design drawi
Feb 9, 2024 · Penalty $1,250
Resolve - Class - 2
Bc 3308.5- vertical safety netting systems. observed 17 str bldg. topped off, with the vertical safety netting inadequate in multiple areas,-cables not taut and deflecting up to 12", netting loose, not properly
Feb 9, 2024 · Penalty $2,500
Resolve - Class - 2
During my inspection of new 17 story building, construction in progress at the 17th fl., observed numerous holes / openings in floor on numerous floors with inadequate coverings, not shot down, not marked "hole
Oct 23, 2023
Resolve - Class - 1
Observed numerous floors with no "0" cable or toe board provided, upon reaching the 5th floor, vertical netting had been removed, workers were not tied off and no control access zone had been established to pre
Oct 23, 2023 · Penalty $2,500
Resolve - Class - 2
I observed workers leaving and locking the jobsite. pedestrian protection: missing 4' construction fence and wire mesh above, along w/ missing in-street barriers enclosing the work storage zone adjacent the ped
Sep 1, 2023 · Penalty $2,400
Resolve - Class - 2
28-104-7 submittal of construction document. as noted: at time of inspection on an active construction site, foundation phase work in progress. i observed at exposure # 1, foundation wall was completed, approx.
May 25, 2023
Resolve - Class - 2
At the time of my inspection i observed rakers & walers installed on the adjacent property at expos 2. after reviewing approved dob drawings it was determined the installed work was contrary to approved drawing
Mar 10, 2023
Resolve - Class - 1
Inspection of an 17 story building with work in progress ,i observed at exposure four and chine link fence with yudock in place for adjoin porperty. upon review site safety plan there were no indication of lo
Jun 8, 2022
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection,observed inadequate housekeeping consisting of large amount of construction combustible material such as styrofoam and wo
Dec 31, 2020 · Penalty $625
Resolve - Class - 1
Bc3301.13.1,failure to provide site safety plan.note:at time of my inspection observed active jobsite.9/10 workers were working at jobsite compatent person present at job site.upon request for site safety plan
Dec 10, 2020
Resolve
Complaints
- General
Signage missing
Apr 15, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 7A
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt 3C
Close - Appliance
Electric/gas range
Jun 9, 2025 · Apt 5A
Close - General
Mailbox
Feb 6, 2025 · Apt 12F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2023
- Floors
- 17
- Residential units
- 122
- Building area
- 122,861 ft²
- Lot area
- 12,500 ft²
- Zoning
- M1-5/R7-3
- Community board
- 402
- Council district
- 26
- Block / lot
- 85 / 13
- Assessed value
- $16,482,150
- Landmark / historic district
- No
HPD registration #434417, last renewed Jun 17, 2025.
Questions about 45-19 Davis Street
Who owns 45-19 Davis Street?
The owner of record in NYC Department of City Planning PLUTO data is Davis Street Development LLC.
Does 45-19 Davis Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 45-19 Davis Street rent stabilized?
NYC Department of Finance tax bills listed 89 rent-stabilized units here in 2024 (about 73% of its 122 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 45-19 Davis Street built?
City records list 2023 as the year it was built.
How many apartments are in 45-19 Davis Street?
It has 122 residential units and 123 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.