21-34 45 Road
Queens, NY 11101BBL 4-00076-0036Map
Owner of record: Nuff Realty Corp
21-34 45 Road is a walk-up apartment building built in 1931 in Queens, 11101. It has 25 residential units across 5 floors. The owner of record is Nuff Realty Corp. HPD has recorded 30 housing violations here, most recently on February 7, 2026. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 30
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 264
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 7, 2026
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 40, 4th story, 1st apartment from east at south
Feb 17, 2025 · Apt 40
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 40, 4th story, 1st apartment from east at south
Feb 17, 2025 · Apt 40
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water of 140 degrees; exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 40, 4th story, 1st apartment from east at south
Feb 17, 2025 · Apt 40
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt 40, 4th story, 1st apartment from east at south
Feb 17, 2025 · Apt 40
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north at east located at apt 12, 2nd story, 1st apartment from west at north
Feb 12, 2025 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story , 1st story
Feb 12, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees in the entire apartment located at apt 12, 2nd story, 1st apartment from west at north
Feb 12, 2025 · Apt 12
Closed — Violation dismissed - BHazardous
Properly secure the loose wood handrail leading to 4th story from intermediate landing at public hall stairs, 3rd story
Dec 27, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kck down door stopper installed at building entrance door at public hall, 1st story
Jun 19, 2024
Closed — Violation closed
Show 20 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper installed at vstibule door at public hall, 1st story
Jun 19, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 31, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Dec 17, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 17, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 17, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 17, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby, 1st story
Oct 30, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Oct 30, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby, 1st story
Oct 30, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 40, 4th story
Apr 29, 2014 · Apt 40
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Apr 29, 2014
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... window moulding at west wall in the bathroom located at apt 4, 1st story, 1st apartment from north at east
Jan 12, 2008 · Apt 4
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint 1 sty apt 4 heat riser rear room chavarria 784 1459 er1. , section '' ''
May 7, 1990 · Apt 4
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint 3 sty apt 22 ceiling foyer & bathroom outer door frame mr keister 937 5496 er1. located at apt 22
May 7, 1990 · Apt 22
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 1
- Hazardous
Work without a permit. remedy: obtain a permit if feasable or restore premises to prior legal condition. failure to provide 8 foor high fence where required during excavation operations.
Aug 3, 1988 · Penalty $1,500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 5
- Residential units
- 25
- Building area
- 17,762 ft²
- Lot area
- 5,000 ft²
- Zoning
- M1-4/R6B
- Community board
- 402
- Council district
- 26
- Block / lot
- 76 / 36
- Assessed value
- $1,171,350
- Landmark / historic district
- No
HPD registration #409487, last renewed Jul 2, 2025.
Questions about 21-34 45 Road
Who owns 21-34 45 Road?
The owner of record in NYC Department of City Planning PLUTO data is Nuff Realty Corp.
Does 21-34 45 Road have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 21-34 45 Road rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 72% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 21-34 45 Road built?
City records list 1931 as the year it was built.
How many apartments are in 21-34 45 Road?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.