1602 East 43 Street
Brooklyn, NY 11234BBL 3-07840-0027Map
Owner of record: 1602 Realty LLC
1602 East 43 Street is a walk-up apartment building built in 1927 in Brooklyn, 11234. It has 19 residential units across 4 floors. The owner of record is 1602 Realty LLC. HPD has recorded 51 housing violations here, most recently on December 10, 2023. 2 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 51
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 122
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt c4, 3rd story, 1st apartment from north at east
Dec 10, 2023 · Apt C4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c4, 3rd story, 1st apartment from north at east
Dec 10, 2023 · Apt C4
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of key operated lock installed at door at south wall at public hall, 1st story
Jul 18, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt c2, 3rd story, 2nd apartment from north at east
Jul 18, 2022 · Apt C2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt c2, 3rd story, 2nd apartment from north at east
Jul 18, 2022 · Apt C2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt c2, 3rd story, 2nd apartment from north at east
Jul 18, 2022 · Apt C2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt c2, 3rd story, 2nd apartment from north at east
Jul 18, 2022 · Apt C2
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing stop at door frame in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Jul 28, 2021 · Apt B1
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical light switch cover at east wall in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Jul 28, 2021 · Apt B1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
Jul 28, 2021 · Apt B1
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Replace with new the missing electrical outlet cover at east wall in the 2nd room from east located at apt 1b, 2nd story, 1st apartment from south at west
Jul 20, 2021 · Apt 1B
Open — Nov sent out - BHazardous
Replace with new the missing wood frame at entrance door in the 3rd room from east located at apt 1b, 2nd story, 1st apartment from south at west
Jul 20, 2021 · Apt 1B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective warped wood floor in the 3rd room from east at south located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective warped wood floor in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Jun 10, 2021 · Apt B1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - BHazardous
Replace with new the broken or defective counter balance at lower windows in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
May 4, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 4; missing stop at all windows, sheetrock screws installed at all windows and two air conditioer installed at windows in the entire apartment located at apt b1, 2nd story, 1st apartment from east at south
May 3, 2021 · Apt B1
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter baance at second window rom east at south wall in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Apr 27, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective counter balances at west 1 window upper sash in the 3rd room from east at south located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the 3rd room from east at south, the private hallway located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at south 1 and 2 windows upper sash in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective connection at wasteline at washbasin in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Replace with new the broken or defective washbasin cabinet in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, south wall, east wall, west wall, ceiling in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... (approx 4 sq ft) at west wall, north wall in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall, north wall in the bathroom located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, south wall, east wall, west wall in the 3rd room from east at south located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, east wall in the 2nd room from east located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt b1, 2nd story, 1st apartment from south at west
Mar 19, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 16, 2016
Closed — Violation closed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 16, 2016
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 1; located at apt a4, 1st story, 2nd apartment from south at west
Mar 16, 2016 · Apt A4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the bathroom located at apt a4, 1st story, 2nd apartment from south at west
Mar 16, 2016 · Apt A4
Closed — Violation closed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 25, 2023 · Apt B1
Close - Plumbing
Toilet
May 15, 2023 · Apt B1
Close - Door/window
Window frame
May 15, 2023 · Apt B1
Close - Paint/plaster
Ceiling
Jul 14, 2022 · Apt C2
Close - Appliance
Refrigerator
Jun 25, 2021 · Apt B1
Close - Unsanitary condition
Pests
May 3, 2021 · Apt B1
Close - Door/window
Window frame
Apr 24, 2021 · Apt B1
Close
Show 40 more ↓
- Plumbing
Basin/sink
Apr 23, 2021 · Apt B1
Close - Flooring/stairs
Floor
Apr 23, 2021 · Apt B1
Close - Plumbing
Toilet
Apr 23, 2021 · Apt B1
Close - Unsanitary condition
Pests
Mar 17, 2021 · Apt B1
Close - Paint/plaster
Wall
Mar 17, 2021 · Apt B1
Close - Unsanitary condition
Mold
Mar 17, 2021 · Apt B1
Close - Door/window
Window frame
Mar 17, 2021 · Apt B1
Close - Water leak
Heavy flow
Mar 17, 2021 · Apt B1
Close - Plumbing
Basin/sink
Mar 17, 2021 · Apt B1
Close - General
Cabinet
Mar 17, 2021 · Apt B1
Close - Plumbing
Basin/sink
Mar 17, 2021 · Apt B1
Close - Electric
Power outage
Mar 3, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2017 · Apt D4
Close - Heat/hot water
Entire building
Feb 14, 2017 · Apt B3
Close - Heat/hot water
Apartment only
Dec 23, 2016 · Apt A2
Close - Paint/plaster
Ceiling
Mar 15, 2016 · Apt A4
Close - Paint/plaster
Ceiling
Mar 15, 2016 · Apt A4
Close - Heat/hot water
Apartment only
Feb 18, 2016 · Apt A4
Close - Heat/hot water
Apartment only
Feb 15, 2016 · Apt A4
Close - General
Signage missing
Dec 1, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2014 · Apt B1
Close - Plumbing
Water supply
Jul 20, 2013 · Apt A3
Close - Plumbing
Water supply
Jul 20, 2013 · Apt A3
Close - Plumbing
Water supply
Jul 20, 2013 · Apt A3
Close - Plumbing
Water supply
Jul 20, 2013 · Apt B3
Close - Heating
Heat related
Feb 17, 2013 · Apt C3
Close - Nonconst
Vermin
Jan 22, 2013 · Apt A3
Close - Electric
Wiring
Jan 22, 2013 · Apt A3
Close - General
Locks
Jan 22, 2013 · Apt A3
Close - General
Doors
Jan 22, 2013 · Apt A3
Close - Heating
Heat related
Apr 28, 2012 · Apt C3
Close - Paint/plaster
Ceiling
Feb 3, 2010 · Apt D3
Close - Plumbing
Water-leaks
Feb 3, 2010 · Apt D3
Close - Heating
Heat related
Dec 29, 2009 · Apt 5D
Close - Nonconst
Vermin
May 4, 2009 · Apt A3
Close - Heating
Heat related
Apr 23, 2009 · Apt 4A
Close - General
Locks
Apr 9, 2009 · Apt BLDG
Close - Electric
Electric-supply
Nov 22, 2008 · Apt D3
Close - Heating
Heat related
Nov 22, 2008 · Apt D3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 19
- Building area
- 15,200 ft²
- Lot area
- 5,013 ft²
- Zoning
- R3-2
- Community board
- 318
- Council district
- 45
- Block / lot
- 7840 / 27
- Assessed value
- $625,500
- Landmark / historic district
- No
HPD registration #350517, last renewed Oct 15, 2025.
Questions about 1602 East 43 Street
Who owns 1602 East 43 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1602 Realty LLC.
Does 1602 East 43 Street have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 1602 East 43 Street rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1602 East 43 Street built?
City records list 1927 as the year it was built.
How many apartments are in 1602 East 43 Street?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.