roofy

4149 Kings Highway

Brooklyn, NY 11210BBL 3-07813-0106Map

Owner of record: Sdb 4149 Realty LLC

4149 Kings Highway is an elevator apartment building built in 1952 in Brooklyn, 11210. It has 101 residential units across 6 floors. The owner of record is Sdb 4149 Realty LLC. HPD has recorded 146 housing violations here, most recently on April 8, 2026. 15 of the 50 most recent violations are still open. City tax records listed 101 rent-stabilized apartments here in 2024.

HPD violations
146
DOB violations
42
ECB violations
16
HPD complaints
405

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
101
About 100% of the building's 101 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 146

  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the 3rd room from north at east located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the bathroom , the 3rd room from north at west, the private hallway , the kitchen located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Nov certified late
  • B

    Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from north at east located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective washbasin cabinet in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10sqft at ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10sqft at south wall in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at 2nd window frame from east at south wall in the 3rd room from north at east located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st door from west at north wall, 1st door frame from north at east wall in the foyer located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sqft at north wall in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Apr 8, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sqft at north wall in the bathroom located at apt 6c, 6th story, 1st apartment from east at south original violation 18773328 issued 08-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Apr 8, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6b, 6th story, 1st apartment from east at south

    Dec 31, 2025 · Apt 6B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north, east, south and west wall in the bathroom located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 4th apartment from north at east

    Nov 29, 2025 · Apt 6A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock in the entrance located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east located at apt 6h, 6th story, 3rd apartment from north at east

    Nov 29, 2025 · Apt 6H

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Nov 29, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south and west wall in the bathroom located at apt 6a, 6th story, 4th apartment from north at east

    Nov 29, 2025 · Apt 6A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 2nd apartment from north at east

    Nov 25, 2025 · Apt 1G

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1g, 1st story, 2nd apartment from north at east

    Nov 25, 2025 · Apt 1G

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1g, 1st story, 2nd apartment from north at east

    Nov 25, 2025 · Apt 1G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 2nd apartment from east at south

    Aug 6, 2025 · Apt 3D

    Open — Notice of issuance sent to tenant
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 20, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [ missing notice ] at public hall, 1st story

    Feb 20, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at fire door leading to compactor closet at south, latch at public hall, 1st story

    Feb 20, 2024

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 1st apartment from west at north

    Oct 7, 2023 · Apt 3G

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3g, 3rd story, 1st apartment from west at north

    Oct 7, 2023 · Apt 3G

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective with new the rubber seal at refrigerator door in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west , section ''4155''

    Sep 22, 2023 · Apt 3G

    Open — Invalid certification
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 1st apartment from south at west , section ''4155''

    Sep 22, 2023 · Apt 3G

    Open — Invalid certification
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5h, 5th story, 1st apartment from east at south

    Aug 11, 2023 · Apt 5H

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective knob on mortese lock at door in the entrance located at apt 3g, 3rd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 3G

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective cabinet bottom panel at wash basin in the bathroom located at apt 3g, 3rd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 3G

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock at door to fire escape in the 3rd room from north located at apt 3g, 3rd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 3G

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 3G

    Open — Nov certified late
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3g, 3rd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 3G

    Closed — Violation closed
  • C

    Fire escape defective. properly secure the loose metal tread first from bottom between third and fourth story landing of fire-escape at building west

    May 28, 2023

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at building front east stack at fire escape, 3rd story

    May 7, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes a/c portruding past window sill rear of building south stack at fire escape, 6th story

    May 7, 2023

    Closed — Violation dismissed

DOB building violations · 42

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 5, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 8, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 8, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2016

    Dob violation - resolved
Show 32 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2016

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years

    Jun 1, 2015

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4

    Dec 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 11, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 11, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 4, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 4, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 8, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 8, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    3p4346

    Feb 20, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    3p4346

    Dec 19, 2001

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatorrequired

    (73)perform 5 yr test and file form elv 3

    Jun 19, 1990

    Dob violation - resolved

ECB violations · 16

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000

    Oct 1, 2024 · Penalty $625

    Active
  • Class - 2

    Rockmills mp-4186 boiler=front rt bottom washout leaking+gas piolit regulator missing vent limiter+oil shutoff missing top of tank+body drains missing@safety valves+fresh air proving switch defective;correct vi

    Apr 22, 2024

    Resolve
  • Class - 2

    Repair noise and vibrations on hoist machine

    May 6, 2021 · Penalty $625

    Resolve
  • Class - 1

    Cease use item: 1)excessive gaps in brake pads . over 70% on left pad and 10% on right pad. 125% brake test required if pads are changed. 2) oil on brake drum. class 2 items: inoperative phone. provide designat

    Feb 11, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Provide designated lobby braille tags. secure pit steel. provide pit ladder. adjust car door gibs. inoperative under car light. unguarded under car light. oil build-up in overhead. inoperative phone. dlm missin

    Feb 11, 2020 · Penalty $312

    Resolve
  • Class - 1

    Cease use items: 1) inoperative zone lock restrictor. 2) extremely misaligned brake pads. 125% brake test required for reinspection if pads are changed class 2 items: adjust cab mirror. provide designated lobby

    Aug 6, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Provide designated lobby braille tags. repair car phone. adjust cab mirror. provide in case of fire signs where needed. provide pit ladder. adjust car door gibs to ride at code minimum depth in saddle. oil buil

    Aug 6, 2019

    Resolve
  • Class - 3

    0354 50a. 50a manhole at top of boiler leaking steam

    Dec 14, 2009 · Penalty $200

    Resolve
  • Class - 3

    46/42/50a/50b/50c/50d/32a/50a-flue pipe not properly sealed to chimney50b-clean out dr need to be sealed around opening/50c-oil line leaking50d-coil plate & leaking

    Nov 16, 2009 · Penalty $100

    Resolve
  • Hazardous

    Cease use 6i1/16i11/26i11/19h11/36o2/37#9/52o2/62o2 6j1 adjust to codefor closing of door to switch contact switch contact switch makes at 2 7/8 inchesto striker.19h11 b to 6 37h9 wires through window non-elev

    Jun 27, 2003 · Penalty $500

    Resolve
Show 6 more ↓
  • Non-hazardous

    57o2.

    Apr 17, 2000

    Resolve
  • Non-hazardous

    40#15,57o2,22d6,29m7,50y14. *40 governor rope needs to be shortened. *22 emergency escape hatch needs all bolts and tighten loose ones. *29 needs cotter pins at bottom of rods.

    Apr 17, 2000

    Resolve
  • Non-hazardous

    75u16

    Jan 26, 1999

    Resolve
  • Non-hazardous

    8v1,9h10,35p17,57o2.

    Mar 28, 1998

    Resolve
  • Non-hazardous

    8v1,14i11,15l11,35p17,57o2. 15-hoist door slamming.

    Mar 28, 1998

    Resolve
  • Non-hazardous

    14i, 18q, 53x, 54g,. (54) remove jumper and properly fuse mainline switch. call (212) 312-8740 before returning elevator service.

    Sep 13, 1995 · Penalty $500

    Resolve

Complaints

  • Plumbing

    Bathtub/shower

    Apr 5, 2026 · Apt 6C

    Close
  • Plumbing

    Toilet

    Mar 5, 2026 · Apt 1G

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 8, 2026 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2025 · Apt 6H

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 4, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2025 · Apt 1G

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2025 · Apt 6B

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2025 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2025 · Apt 6B

    Close
  • Heat/hot water

    Entire building

    Oct 30, 2025 · Apt 6E

    Close
  • Water leak

    Slow leak

    Aug 21, 2025 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    Jul 31, 2025 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Jul 31, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2025 · Apt 3D

    Close
  • Water leak

    Damp spot

    Jul 18, 2025 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Feb 13, 2025 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2025 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2024 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Jun 14, 2024 · Apt 5E

    Close
  • General

    Cabinet

    Jun 14, 2024 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Jun 14, 2024 · Apt 5E

    Close
  • Water leak

    Slow leak

    Jun 14, 2024 · Apt 5E

    Close
  • Plumbing

    Bathtub/shower

    Jun 14, 2024 · Apt 5E

    Close
  • Plumbing

    Bathtub/shower

    Apr 23, 2024 · Apt 5E

    Close
  • General

    Cabinet

    Apr 23, 2024 · Apt 5E

    Close
  • Paint/plaster

    Wall

    Apr 23, 2024 · Apt 5E

    Close
  • Plumbing

    Bathtub/shower

    Apr 23, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 25, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2024 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
1952
Floors
6
Residential units
101
Building area
96,000 ft²
Lot area
26,900 ft²
Zoning
R5
Community board
318
Council district
45
Block / lot
7813 / 106
Assessed value
$4,295,250
Landmark / historic district
No

HPD registration #327935, last renewed Jun 4, 2025.

Questions about 4149 Kings Highway

Who owns 4149 Kings Highway?

The owner of record in NYC Department of City Planning PLUTO data is Sdb 4149 Realty LLC.

Does 4149 Kings Highway have violations?

Yes. NYC HPD has recorded 146 housing violations at this property.

Is 4149 Kings Highway rent stabilized?

NYC Department of Finance tax bills listed 101 rent-stabilized units here in 2024 (about 100% of its 101 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 4149 Kings Highway built?

City records list 1952 as the year it was built.

How many apartments are in 4149 Kings Highway?

It has 101 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.