roofy

2822 Brighton 8 Street

Brooklyn, NY 11235BBL 3-07263-0124Map

Owner of record: Rafyana Rlty Corp

2822 Brighton 8 Street is a walk-up apartment building built in 1930 in Brooklyn, 11235. It has 38 residential units across 4 floors. The owner of record is Rafyana Rlty Corp. HPD has recorded 755 housing violations here, most recently on September 9, 2026. 49 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.

HPD violations
755
DOB violations
29
ECB violations
14
HPD complaints
683

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
38
About 100% of the building's 38 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 755

  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 at all hotwater fixtures in the entire apartment in the entire apartment located at apt c2, 3rd story, 1st apartment from south at west

    Sep 9, 2026 · Apt C2

    Open — Civ14 mailed
  • C

    M/d law abate the nuisance consisting of refuse material at floor preventing drop ladder from descending. at fire escape

    Sep 9, 2026

    Open — Nov certified on time
  • C

    M/d law abate the nuisance consisting of discarded refrigerator and gas stove with doors intact at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 at all hotwater fixtures in the entire apartment in the entire apartment located at apt c1, 3rd story, 2nd apartment from south at west

    Sep 9, 2026 · Apt C1

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt b2, 3rd story, 1st apartment from south at west , section at south

    Sep 4, 2026 · Apt B2

    Open — Nov sent out
  • B

    Replace with new the missing electrical outlet covers(3) in the 1st room from north located at apt b2, 3rd story, 1st apartment from south at west , section at south

    Sep 4, 2026 · Apt B2

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyer located at apt b2, 3rd story, 1st apartment from south at west , section at south

    Sep 4, 2026 · Apt B2

    Open — Nov sent out
  • B

    Properly secure the loose top cabinet at west wall in the kitchen located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective concrete subfloor in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all ceilings and all walls in the entire apartment located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 4th story, section at south

    Sep 4, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 4th story, section at south

    Sep 4, 2026

    Open — Nov certified on time
  • B

    Repair the leaky and/or defective faucets spout at bathtub in the bathroom located at apt b2, 3rd story, 1st apartment from south at west , section at south

    Sep 4, 2026 · Apt B2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile at floor at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • B

    Replace with new the missing light fixture at ceiling in the foyer located at apt b2, 3rd story, 1st apartment from south at west , section at south

    Sep 4, 2026 · Apt B2

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling, north and west walls in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective all vinyl flooring in the entire apartment located at apt b4, 3rd story, 2nd apartment from north at east , section at south

    Sep 4, 2026 · Apt B4

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of refrigerator with doors attached at public hall, 1st story

    Sep 4, 2026

    Open — Nov certified on time
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 4th story, section at south

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 4, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire ratardant material at ceiling at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of refrigerator with door intact at public hall, 1st story

    Sep 4, 2026

    Open — Nov certified on time
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at balcony at 1st fire escape from west at north at fire escape, 4th story

    Aug 23, 2026

    Open — Nov certified on time
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt c5, 4th story, 1st apartment from north at east

    Aug 16, 2026 · Apt C5

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c5, 4th story, 1st apartment from north at east

    Aug 16, 2026 · Apt C5

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c5, 4th story, 1st apartment from north at east

    Aug 16, 2026 · Apt C5

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead , section at south

    Aug 8, 2026

    Open — First no access to re- inspect violation
  • A

    Cleanse to the satisfaction of this department the stairs

    Jul 23, 2026

    Open — False certification
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes clothes at 4th story balcony at south stack at building front at fire escape

    Jul 23, 2026

    Open — False certification
  • B

    Replace with new the missing electrical light fixture at ceiling in the foyer located at apt b2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt B2

    Open — False certification
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — First no access to re- inspect violation
  • A

    Cleanse to the satisfaction of this department the floor at south at public hall, 4th story

    Jul 23, 2026

    Open — False certification
  • A

    Cleanse to the satisfaction of this department the floor at public hall, 3rd story

    Jul 23, 2026

    Open — False certification
  • A

    Cleanse to the satisfaction of this department the floor at public hall, 2nd story

    Jul 23, 2026

    Open — False certification
  • A

    Cleanse to the satisfaction of this department the stairs at public hall stairs

    Jul 23, 2026

    Open — False certification
  • B

    Properly repair or replace the broken or defective cabinet at wash basin in the bathroom located at apt b2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt B2

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Jul 23, 2026

    Open — False certification
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at south stack at building front at fire escape

    Jul 23, 2026

    Open — False certification
  • C

    Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 4, 1st story, 1st apartment from west at north

    Jul 23, 2026 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east and north wall in the foyer located at apt 4, 1st story, 1st apartment from west at north

    Jul 23, 2026 · Apt 4

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt b2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt B2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood subfloor in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures . in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures . in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south

    Jul 23, 2026 · Apt A2

    Open — Nov sent out

DOB building violations · 29

  • Immediate emergency anythingoptional

    Seal and secure the building. remove all fire related debris and house hold items. clear all exit passageways serving the fire escapes for lines 7, 8, and 9. restore all required means of egresss to an unobstructed and safe condition

    Dec 22, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain bldg in a safe condition.bldg dmgd by fire on 12/20/25.moderate to severe fire dmg noted@unit c1:some of roof framng &roof open.water dmg to ceilng&int finishes noted@other loc.ownr to rtain nyspe to eval the ent bldg incldng ext walls&rpair undr prmts strt wrk by 2/2/25&cmplt/sgn off by 3/16/26

    Dec 22, 2025

    Dob violation - dismissed
  • Construction other optional

    Emergency work order.building damaged by fire on 12/20/25 some of roof framing at unit c1 severely damagd and roof open.under dirct&continous sprvsn of pe immed: 1.clear all debris frm all publc areas includng hllwys,rear&side yrds

    Dec 22, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain bldg in a safe condition.vertical and step cracks were observed at exposure 1 along brighton 8 st.ownr to rtain nyspe to eval the ent bldg includng exterior walls&rpair undr prmt.strt wrk by 11/2/26 & complte/sgn off by 12/14/26

    Dec 22, 2025

    Dob violation - active
  • Construction other optional

    Structure rendered noncompliant due to fire damage to bldg on fl1-fl4, structural damage to wood frame, wall; roof open to elements. vacate a1, a7, a8, a9, b1, b7, b8, b9, c1, c7, c8, c9 remedy: repair all areas damaged by fire

    Dec 21, 2025

    Dob violation - dismissed
  • Construction other optional

    Damage to bldg from fire on fl1-fl4, structural damage to frame and wa lls of bldg, roof open and caving in, smoke and water damage in bldg @ apts a1, a7, a8, a9, b1, b7, b8, b9, c1, c7, c8, c9 remedy: owner to hire nyspe to send report to ertinspections@buildings .nyc.gov w/in 3 days w/photos, plans, and recommended comp. timeframe

    Dec 21, 2025

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 14, 2016

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
Show 19 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 12, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 14

  • Class - 3

    Failure to maintain bldg in a code compliant manner. observed ceiling water daamage from roof leaks in food/butcher meat store. observed suspended ceiling panels stained,missing & air conditioning metal diffuse

    Jan 30, 2019

    Resolve
  • Class - 1

    Failure to have new or altered plumbing systems tested-observed on 9/18/16 @ 12:15pm in meat store 3compartment sink, installed w.pvc draw piping,grease interceptor-no dob inspection on file for work-*photos ta

    Sep 18, 2016 · Penalty $5,000

    Active
  • Class - 2

    Failure to have new or altered plumbing systems tested-observed on 9/18/16 @1215pm on 1st flr apt- pvc (draws)piping installed for(low),sink&stand up shower,no inspections on file.*photos taken*rem:perform insp

    Sep 18, 2016 · Penalty $2,500

    Active
  • Hazardous

    B4b,24b,34a,38,48a,50a,b,c,d,e,f,g,h,4b,32a,34b,40,48b.50a-clean out open at base of chimney breach.50b-boiler rear inspection door scorches.50c-pressure gauge needs anti-syphon guage.50d-pressuretroll manifold

    Sep 5, 2007 · Penalty $400

    Resolve
  • Hazardous

    Failure to provide protection for side walk and walk walks during construction of parapet walls ( and replacement ) no protection for courtyard area ( side walk shed absent at secondary means of egress. stop al

    Aug 12, 2002 · Penalty $5,000

    Resolve
  • Hazardous

    Woek without permit. parapet wall at courtyard area demolished at several locaitons: demo r brick work done is unsafe manner corner no tied in (see photos ) stop all work immediately" remedy;obtain permit or re

    Aug 12, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    B4a-34a-34b-49. boiler room not astonrgage room. controll covers missing pipe hot water reliet value down air vacil on back flow pronetion.

    Aug 6, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    B4a-34a-34b-32a-32b-40-33b-hot water relief value missing controll covers missing.

    Aug 6, 2002 · Penalty $2,500

    Resolve
  • Hazardous

    Work w/o a permit. work noted at frotn entry court yard at roof level parapet wall was. partiallt demolished & under reconstruction being rebuilt with brick aprx. size 2 1/2 feet high x 25ft long. wth no provio

    Apr 29, 2002 · Penalty $800

    Resolve
  • Hazardous

    Failure to provide protection for sidewalk and walkways. duirng construction operations unsafe practice at brick parapet wall above 4th fl. & above front entrance no sidewalk shed provided to protect public not

    Apr 29, 2002 · Penalty $2,000

    Resolve
Show 4 more ↓
  • Hazardous

    Failure to maintain exterior building wall. defect is: brickwork is cracked and defective at southeast corner, and above 4th floor window 2) brickwork cracked at east facade wall above 2nd floor below fire

    Feb 10, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to carry out permitted work in accordance with applicable lawsand regulations in that construction activities are being performed other than on weekday between the hours of 7am and 6pm w/0 a variance

    Mar 1, 1995 · Penalty $175

    Resolve
  • Hazardous

    D.rk without a permit.hazardous.apt c5 1-replacing front &jam.2-removed entire bathroom fixtures,elec.,4 floor in apt c5 floor joist apt 4c ceiling removed &elev.hanging .remedy:stop all work until all permi

    Mar 1, 1995 · Penalty $800

    Resolve
  • Non-hazardous

    22-a,24-a,24-b,37,18-a,42d,32 3/8" fitting on pressure trol & m.r.p.t.open

    Jun 18, 1991 · Penalty $170

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 23, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 23, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 23, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jun 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 14, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    May 6, 2026 · Apt A8

    Close
  • General

    Cooking gas

    Apr 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 28, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 28, 2026 · Apt BLDG

    Close
  • General

    Signage missing

    Apr 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 25, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 24, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 24, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 23, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 17, 2026 · Apt B7

    Close
  • General

    Cooking gas

    Apr 14, 2026 · Apt BUILDI

    Close
  • General

    Cooking gas

    Apr 13, 2026 · Apt C10

    Close
  • Heat/hot water

    Entire building

    Apr 10, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 10, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Apr 6, 2026 · Apt 6C

    Close
  • Plumbing

    Radiator

    Apr 6, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Apr 6, 2026 · Apt A8

    Close
  • Door/window

    Window pane

    Apr 6, 2026 · Apt A8

    Close
  • Flooring/stairs

    Floor

    Apr 6, 2026 · Apt 6C

    Close
  • Plumbing

    Toilet

    Apr 6, 2026 · Apt 6C

    Close
  • Water leak

    Slow leak

    Apr 6, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Mold

    Apr 6, 2026 · Apt 6C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1930
Floors
4
Residential units
38
Building area
32,400 ft²
Lot area
10,450 ft²
Zoning
R6
Community board
313
Council district
48
Block / lot
7263 / 124
Assessed value
$1,809,900
Landmark / historic district
No

HPD registration #333208, last renewed Sep 9, 2025.

Questions about 2822 Brighton 8 Street

Who owns 2822 Brighton 8 Street?

The owner of record in NYC Department of City Planning PLUTO data is Rafyana Rlty Corp.

Does 2822 Brighton 8 Street have violations?

Yes. NYC HPD has recorded 755 housing violations at this property.

Is 2822 Brighton 8 Street rent stabilized?

NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 38 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2822 Brighton 8 Street built?

City records list 1930 as the year it was built.

How many apartments are in 2822 Brighton 8 Street?

It has 38 residential units and 42 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.