2822 Brighton 8 Street
Brooklyn, NY 11235BBL 3-07263-0124Map
Owner of record: Rafyana Rlty Corp
2822 Brighton 8 Street is a walk-up apartment building built in 1930 in Brooklyn, 11235. It has 38 residential units across 4 floors. The owner of record is Rafyana Rlty Corp. HPD has recorded 755 housing violations here, most recently on September 9, 2026. 49 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 755
- DOB violations
- 29
- ECB violations
- 14
- HPD complaints
- 683
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 755
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 at all hotwater fixtures in the entire apartment in the entire apartment located at apt c2, 3rd story, 1st apartment from south at west
Sep 9, 2026 · Apt C2
Open — Civ14 mailed - CImmediately hazardous
M/d law abate the nuisance consisting of refuse material at floor preventing drop ladder from descending. at fire escape
Sep 9, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of discarded refrigerator and gas stove with doors intact at public hall, 1st story
Sep 9, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 at all hotwater fixtures in the entire apartment in the entire apartment located at apt c1, 3rd story, 2nd apartment from south at west
Sep 9, 2026 · Apt C1
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt b2, 3rd story, 1st apartment from south at west , section at south
Sep 4, 2026 · Apt B2
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet covers(3) in the 1st room from north located at apt b2, 3rd story, 1st apartment from south at west , section at south
Sep 4, 2026 · Apt B2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyer located at apt b2, 3rd story, 1st apartment from south at west , section at south
Sep 4, 2026 · Apt B2
Open — Nov sent out - BHazardous
Properly secure the loose top cabinet at west wall in the kitchen located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete subfloor in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all ceilings and all walls in the entire apartment located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 4th story, section at south
Sep 4, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 4th story, section at south
Sep 4, 2026
Open — Nov certified on time - BHazardous
Repair the leaky and/or defective faucets spout at bathtub in the bathroom located at apt b2, 3rd story, 1st apartment from south at west , section at south
Sep 4, 2026 · Apt B2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling in the foyer located at apt b2, 3rd story, 1st apartment from south at west , section at south
Sep 4, 2026 · Apt B2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling, north and west walls in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective all vinyl flooring in the entire apartment located at apt b4, 3rd story, 2nd apartment from north at east , section at south
Sep 4, 2026 · Apt B4
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors attached at public hall, 1st story
Sep 4, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 4th story, section at south
Sep 4, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 4, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire ratardant material at ceiling at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door intact at public hall, 1st story
Sep 4, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at balcony at 1st fire escape from west at north at fire escape, 4th story
Aug 23, 2026
Open — Nov certified on time - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt c5, 4th story, 1st apartment from north at east
Aug 16, 2026 · Apt C5
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c5, 4th story, 1st apartment from north at east
Aug 16, 2026 · Apt C5
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c5, 4th story, 1st apartment from north at east
Aug 16, 2026 · Apt C5
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead , section at south
Aug 8, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Cleanse to the satisfaction of this department the stairs
Jul 23, 2026
Open — False certification - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes clothes at 4th story balcony at south stack at building front at fire escape
Jul 23, 2026
Open — False certification - BHazardous
Replace with new the missing electrical light fixture at ceiling in the foyer located at apt b2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt B2
Open — False certification - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — First no access to re- inspect violation - ANon-hazardous
Cleanse to the satisfaction of this department the floor at south at public hall, 4th story
Jul 23, 2026
Open — False certification - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 3rd story
Jul 23, 2026
Open — False certification - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 2nd story
Jul 23, 2026
Open — False certification - ANon-hazardous
Cleanse to the satisfaction of this department the stairs at public hall stairs
Jul 23, 2026
Open — False certification - BHazardous
Properly repair or replace the broken or defective cabinet at wash basin in the bathroom located at apt b2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt B2
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jul 23, 2026
Open — False certification - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at south stack at building front at fire escape
Jul 23, 2026
Open — False certification - CImmediately hazardous
Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 4, 1st story, 1st apartment from west at north
Jul 23, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and north wall in the foyer located at apt 4, 1st story, 1st apartment from west at north
Jul 23, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt b2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt B2
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood subfloor in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures . in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures . in the kitchen located at apt a2, 2nd story, 1st apartment from south at west , section at south
Jul 23, 2026 · Apt A2
Open — Nov sent out
DOB building violations · 29
- Immediate emergency anythingoptional
Seal and secure the building. remove all fire related debris and house hold items. clear all exit passageways serving the fire escapes for lines 7, 8, and 9. restore all required means of egresss to an unobstructed and safe condition
Dec 22, 2025
Dob violation - dismissed - Construction other optional
Failure to maintain bldg in a safe condition.bldg dmgd by fire on 12/20/25.moderate to severe fire dmg noted@unit c1:some of roof framng &roof open.water dmg to ceilng&int finishes noted@other loc.ownr to rtain nyspe to eval the ent bldg incldng ext walls&rpair undr prmts strt wrk by 2/2/25&cmplt/sgn off by 3/16/26
Dec 22, 2025
Dob violation - dismissed - Construction other optional
Emergency work order.building damaged by fire on 12/20/25 some of roof framing at unit c1 severely damagd and roof open.under dirct&continous sprvsn of pe immed: 1.clear all debris frm all publc areas includng hllwys,rear&side yrds
Dec 22, 2025
Dob violation - dismissed - Construction other optional
Failure to maintain bldg in a safe condition.vertical and step cracks were observed at exposure 1 along brighton 8 st.ownr to rtain nyspe to eval the ent bldg includng exterior walls&rpair undr prmt.strt wrk by 11/2/26 & complte/sgn off by 12/14/26
Dec 22, 2025
Dob violation - active - Construction other optional
Structure rendered noncompliant due to fire damage to bldg on fl1-fl4, structural damage to wood frame, wall; roof open to elements. vacate a1, a7, a8, a9, b1, b7, b8, b9, c1, c7, c8, c9 remedy: repair all areas damaged by fire
Dec 21, 2025
Dob violation - dismissed - Construction other optional
Damage to bldg from fire on fl1-fl4, structural damage to frame and wa lls of bldg, roof open and caving in, smoke and water damage in bldg @ apts a1, a7, a8, a9, b1, b7, b8, b9, c1, c7, c8, c9 remedy: owner to hire nyspe to send report to ertinspections@buildings .nyc.gov w/in 3 days w/photos, plans, and recommended comp. timeframe
Dec 21, 2025
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
Show 19 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 12, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 14
- Class - 3
Failure to maintain bldg in a code compliant manner. observed ceiling water daamage from roof leaks in food/butcher meat store. observed suspended ceiling panels stained,missing & air conditioning metal diffuse
Jan 30, 2019
Resolve - Class - 1
Failure to have new or altered plumbing systems tested-observed on 9/18/16 @ 12:15pm in meat store 3compartment sink, installed w.pvc draw piping,grease interceptor-no dob inspection on file for work-*photos ta
Sep 18, 2016 · Penalty $5,000
Active - Class - 2
Failure to have new or altered plumbing systems tested-observed on 9/18/16 @1215pm on 1st flr apt- pvc (draws)piping installed for(low),sink&stand up shower,no inspections on file.*photos taken*rem:perform insp
Sep 18, 2016 · Penalty $2,500
Active - Hazardous
B4b,24b,34a,38,48a,50a,b,c,d,e,f,g,h,4b,32a,34b,40,48b.50a-clean out open at base of chimney breach.50b-boiler rear inspection door scorches.50c-pressure gauge needs anti-syphon guage.50d-pressuretroll manifold
Sep 5, 2007 · Penalty $400
Resolve - Hazardous
Failure to provide protection for side walk and walk walks during construction of parapet walls ( and replacement ) no protection for courtyard area ( side walk shed absent at secondary means of egress. stop al
Aug 12, 2002 · Penalty $5,000
Resolve - Hazardous
Woek without permit. parapet wall at courtyard area demolished at several locaitons: demo r brick work done is unsafe manner corner no tied in (see photos ) stop all work immediately" remedy;obtain permit or re
Aug 12, 2002 · Penalty $2,500
Resolve - Non-hazardous
B4a-34a-34b-49. boiler room not astonrgage room. controll covers missing pipe hot water reliet value down air vacil on back flow pronetion.
Aug 6, 2002 · Penalty $2,500
Resolve - Non-hazardous
B4a-34a-34b-32a-32b-40-33b-hot water relief value missing controll covers missing.
Aug 6, 2002 · Penalty $2,500
Resolve - Hazardous
Work w/o a permit. work noted at frotn entry court yard at roof level parapet wall was. partiallt demolished & under reconstruction being rebuilt with brick aprx. size 2 1/2 feet high x 25ft long. wth no provio
Apr 29, 2002 · Penalty $800
Resolve - Hazardous
Failure to provide protection for sidewalk and walkways. duirng construction operations unsafe practice at brick parapet wall above 4th fl. & above front entrance no sidewalk shed provided to protect public not
Apr 29, 2002 · Penalty $2,000
Resolve
Show 4 more ↓
- Hazardous
Failure to maintain exterior building wall. defect is: brickwork is cracked and defective at southeast corner, and above 4th floor window 2) brickwork cracked at east facade wall above 2nd floor below fire
Feb 10, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to carry out permitted work in accordance with applicable lawsand regulations in that construction activities are being performed other than on weekday between the hours of 7am and 6pm w/0 a variance
Mar 1, 1995 · Penalty $175
Resolve - Hazardous
D.rk without a permit.hazardous.apt c5 1-replacing front &jam.2-removed entire bathroom fixtures,elec.,4 floor in apt c5 floor joist apt 4c ceiling removed &elev.hanging .remedy:stop all work until all permi
Mar 1, 1995 · Penalty $800
Resolve - Non-hazardous
22-a,24-a,24-b,37,18-a,42d,32 3/8" fitting on pressure trol & m.r.p.t.open
Jun 18, 1991 · Penalty $170
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jun 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
May 6, 2026 · Apt A8
Close - General
Cooking gas
Apr 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 28, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 28, 2026 · Apt BLDG
Close - General
Signage missing
Apr 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 25, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 24, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 24, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 17, 2026 · Apt B7
Close - General
Cooking gas
Apr 14, 2026 · Apt BUILDI
Close - General
Cooking gas
Apr 13, 2026 · Apt C10
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 10, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 6, 2026 · Apt 6C
Close - Plumbing
Radiator
Apr 6, 2026 · Apt 6C
Close - Flooring/stairs
Floor
Apr 6, 2026 · Apt A8
Close - Door/window
Window pane
Apr 6, 2026 · Apt A8
Close - Flooring/stairs
Floor
Apr 6, 2026 · Apt 6C
Close - Plumbing
Toilet
Apr 6, 2026 · Apt 6C
Close - Water leak
Slow leak
Apr 6, 2026 · Apt 6C
Close - Unsanitary condition
Mold
Apr 6, 2026 · Apt 6C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1930
- Floors
- 4
- Residential units
- 38
- Building area
- 32,400 ft²
- Lot area
- 10,450 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 7263 / 124
- Assessed value
- $1,809,900
- Landmark / historic district
- No
HPD registration #333208, last renewed Sep 9, 2025.
Questions about 2822 Brighton 8 Street
Who owns 2822 Brighton 8 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rafyana Rlty Corp.
Does 2822 Brighton 8 Street have violations?
Yes. NYC HPD has recorded 755 housing violations at this property.
Is 2822 Brighton 8 Street rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 38 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2822 Brighton 8 Street built?
City records list 1930 as the year it was built.
How many apartments are in 2822 Brighton 8 Street?
It has 38 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.