2510 Avenue P
Brooklyn, NY 11229BBL 3-06788-0001Map
Owner of record: NYC Department Of Education
2510 Avenue P is a school building built in 1925 in Brooklyn, 11229. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 141
- ECB violations
- 160
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 141
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2021
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2019
Dob violation - active
ECB violations · 160
- Class - 2
Reissue: 35692109l-failure to maintain building in code-compliant manner. at staircase #16 and #15 water penetration leading to stairs, walls, and ceiling. remedy: comply with code.
Mar 12, 2026 · Penalty $3,125
Active - Class - 2
Reissue: 35682868n-failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public gym per bc 1006.1; 27-381. 3rd floor gym lights not working, emergency lights. remedy
Mar 12, 2026 · Penalty $3,125
Active - Class - 2
Reissue: 35692107h. failure to maintain building in code-compliant manner. roof level water rises after raiins. leaks through 5th floor classrooms. remedy: comply with code.
Mar 12, 2026 · Penalty $3,125
Active - Class - 2
Reissue: 35692108j. failure to maintain building in code-compliant manner. roof bulkhead has water penetration through door saddle. remedy: comply with code.
Mar 12, 2026 · Penalty $3,125
Active - Class - 1
Hazardous cease use boiler#4>brick set hp boiler has loose i beam+bricks right side+loose bricks@top steam drum+corroded flue@chimney base;correct all hazardous conditions immediately+call dob 212 6020580 to li
Dec 31, 2025 · Penalty $2,500
Active - Class - 2
Observed one oil fired weilmcalin 782 945000 btu boiler, missing the sight glass and the jacket coming apart. correct all violating conditions and submit a certificate of corrections
Aug 18, 2025 · Penalty $1,250
Active - Class - 2
Reissue #35682869p: failure to maintain building in code-compliant manner: observed @ staircase #16 and #15 water infiltration from rooftop bulkhead leads onto stairs, walls and ceiling. remedy: repair and/or r
Mar 14, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682865h: failure to maintain building in code-compliant manner: observed from rooftop, at bulkhead water rises continue penetrating through door/saddle which leads to landing, waters and ceiling. rem
Mar 14, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682866j; failure to maintain building in code-compliant manner: observed at roof level water level rise after rains cause leaks through roofig materials and onto 5th floors classroom(s). remedy: repa
Mar 14, 2025 · Penalty $3,125
Active - Class - 2
Reissue #35682867l; failure to maintain building in code-compliant manner: observed @ 5th floor classrooms #526 ceiling damage caused by water infiltration through from roof. remedy: repair and/or replace.
Mar 14, 2025 · Penalty $3,125
Active
Complaints
- Plumbing
Bathtub/shower
Feb 1, 2024 · Apt 4B
Close - Paint/plaster
Ceiling
Feb 1, 2024 · Apt 4B
Close - Plumbing
Basin/sink
Feb 1, 2024 · Apt 4B
Close - Unsanitary condition
Pests
Feb 1, 2024 · Apt 4B
Close - Electric
No lighting
Jun 4, 2022 · Apt BLDG
Close - Electric
No lighting
Jun 4, 2022 · Apt BLDG
Close - Plumbing
Water-leaks
Dec 27, 2005 · Apt E4
Close - Paint/plaster
Ceiling
Dec 27, 2005 · Apt E4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1925
- Floors
- 3
- Residential units
- —
- Building area
- 211,552 ft²
- Lot area
- 322,000 ft²
- Zoning
- R3-2
- Community board
- 315
- Council district
- 48
- Block / lot
- 6788 / 1
- Assessed value
- $22,289,400
- Landmark / historic district
- No
Questions about 2510 Avenue P
Who owns 2510 Avenue P?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 2510 Avenue P have violations?
NYC HPD has no housing violations on record for this property.
Is 2510 Avenue P rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2510 Avenue P built?
City records list 1925 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.