1710 West 4 Street
Brooklyn, NY 11223BBL 3-06652-0010Map
Owner of record: 1710 W 4th LLC
1710 West 4 Street is a walk-up apartment building built in 1928 in Brooklyn, 11223. It has 23 residential units across 4 floors. The owner of record is 1710 W 4th LLC. HPD has recorded 846 housing violations here, most recently on August 11, 2026. 46 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 846
- DOB violations
- 7
- ECB violations
- 21
- HPD complaints
- 718
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 846
- BHazardous
Properly repair or replace the broken or defective latch and assemblies at public hall to north yard door at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at public hall to north yard door at public hall, 1st story
Aug 11, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective connection at, waste pipe ,north wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from north at east wall, 1st riser from south at west wall in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of sheet of plywood ,at west wall , at public hall, 1st story
Aug 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of window guard installed at window to fire escape , east wall in the 1st room from east located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective cracked translucent glass at lower sash window to west wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the private hallway , the 1st room from east, the foyer , the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall, south wall, west wall, 1st door frame from east at south wall, ceiling in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Civ14 mailed - BHazardous
Replace with new the missing iron guardail at stairs with split level , north wall , at public hall, 1st story
Aug 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked fire retardant materials, plaster at ceiling at public hall, 1st story
Aug 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door missing door at west wall at building's vestibule at public hall, 1st story
Aug 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked masonry landing with missing section, in front of exit stair below grade at ,southeast section, building front yard at fire passage way
Aug 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly secure the loose wash basin at north wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective the wood door at base cabinet , west wall , in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective sink ' s countertop at west wall in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from east located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft observed at 1st window frame from south at west wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Civ14 mailed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at north wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bahtub west wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective regrout the joints between the bathtub and ceramic tiles at west wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked wood door at 1st closet from west at north wall in the private hallway located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet underneath wash basin at north wall in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Aug 2, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sink base cabinet in the kitchen located at apt b6, 2nd story, 1st apartment from north at east
Jun 10, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective base cabinet at wash basin in the bathroom located at apt b6, 2nd story, 1st apartment from north at east
Jun 10, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b6, 2nd story, 1st apartment from north at east
Jun 10, 2026 · Apt B6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set... at building entrance
Jan 28, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric outlet at west wall in the 2nd room from east at south located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective rotted sink base cabinet in the kitchen located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a2, 1st story, 2nd apartment from south at west
Dec 21, 2025 · Apt A2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at east wall in the bathroom located at apt a2, 1st story, 2nd apartment from south at west original violation 18523315 issued 21-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 21, 2025 · Apt A2
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south wall in the bathroom located at apt a2, 1st story, 2nd apartment from south at west original violation 18523314 issued 21-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 21, 2025 · Apt A2
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt a2, 1st story, 2nd apartment from south at west original violation 18523313 issued 21-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 21, 2025 · Apt A2
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt a2, 1st story, 2nd apartment from south at west original violation 18523312 issued 21-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 21, 2025 · Apt A2
Open — First no access to re- inspect violation
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 21
- Class - 1
Failure to maintain building in code compliant manner; observed at exp 1 fire escapes obstructed by plants and window ac units. condition remains the same as previously issued violation 35680719k., repair and/r
Aug 27, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code-compliant manner; at time of inspection observed fire escapes at exposure 1 littered with house hold items and window egress being blocked with air conditioner units. air co
Jul 26, 2024 · Penalty $625
Resolve - Class - 2
Violation 3905284k was issued on 12/14/2021 for brick chimney in state of disrepair conditions with deteriorated mortar, coping stone & vertical cracks on both sides in courtyard 2nd floor to roof level. no cer
Jun 26, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection observed brick chimney instate of disrepair conditions with deteriorated mortar, coping stone & vertical cracks on both side in courtyard 2nd to roof level., repair and/or replace
Dec 14, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons.violation#39037637j issued on 03-15-21 and to file a certifiate of correction pursuant to 28-201.1 and 1rcny 102-01 comply with commissioners
Apr 29, 2021 · Penalty $625
Resolve - Class - 1
At side door exit, large cardboard boxes obstruct exit passageway., remove obstruction
Mar 15, 2021 · Penalty $312
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35454262y issued on 05/09/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway at
Feb 17, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner failure to comply w/the commissioner's order contained in summons/violation #35454014p issued on 03/20/20 & to file a certificate of correction pursuant to 28-2
Oct 9, 2020 · Penalty $625
Resolve - Class - 2
Failure to provide unobstructed exit passageway failure to comply w/the commissioner's order contained in summons/violation #35454262y issued on 05/09/20 & to file a certificate of correction pursuant to 28-201
Oct 9, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. at time of inspectionit was observed that passageway from rear court yard was partial block w/lumber & debris. remedy: remove obstruction.
May 9, 2020 · Penalty $1,250
Resolve
Show 11 more ↓
- Class - 1
Failure to maintain building code compliant.noted:at the right side courtyard,access stairs are in severe disre with rotten and missing woodtreads and sagging platform landing.-immediately-rem:comply with code.
Mar 20, 2020 · Penalty $312
Resolve - Class - 2
Work w/o permit.observed at rear yard installed caps and fitting,piping on to storp piping from inside bldg drain.no permits on file for work.photo provided.rem:obtain a permit
Jun 29, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to have new or altered plumbing systems tested-observed at rrear yard installed 16"clasps,fittings,piping to storm drains.no inspections on file for this work.photo provided.perform inspections.
Jun 29, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.re:installation/maintenance of plumbing materials/equipment per pc 102.3&27-902.installed:prohibited rubber in sleeved caps at rear yard on storm drain line(fe
Jun 29, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/an order of the commissioner. respondent failed tofile a c/c #34895432p. illegal hardware. remedy: comply w/code.
Jun 2, 2011 · Penalty $800
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob. failure to file a c/c for previously issued ecb nov #34796313z issued on 8.3.09 for failing to maintain bldg in a code-compliant manner with
Mar 26, 2011 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner.use of prohibited door &/or hardware per bc1008.1.8;27-371(j).@ the time of insp of a 4 story multiple dwelling bldg observed the illegal installation of door
Mar 26, 2011 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in a code complaint manner provide required corridor width per bc1016.2 27-369 at time of inspection observed at rear of premises the partial obstruction of fire escape at 3rd fl level
Aug 3, 2009 · Penalty $2,500
Resolve - Non-hazardous
B4b/16/32a/34a/34b/48a/50a/50b/50c/50d/50e/50f/50g/50h/.50a-holes in boiler room walls & ceiling.50b-rotted coil plate.50c-leaking water lines at coil.50d-no covers on some controls.50e-chimney not sealed
Apr 23, 2007 · Penalty $2,500
Resolve - Non-hazardous
B4a/50a/50b/50c/50d/50e/50f. (50a)furnace missing back sight glass. (50b)backflow preventer is undersized for application. (50c)pressurized feed water line feeding directly into boiler. (50d)corrosion evident a
Mar 7, 2006 · Penalty $350
Resolve - Non-hazardous
45a/45b 50/48b 50- missing insulation rope around rear clean-out door (escaping fumes).- missing cement around chimney base missing cover plate on manual reset pressure control.
Feb 18, 2006 · Penalty $180
Resolve
Complaints
- Unsanitary condition
Mold
Jul 27, 2026 · Apt B6
Close - Unsanitary condition
Pests
Jul 27, 2026 · Apt B6
Close - Plumbing
Basin/sink
Jul 27, 2026 · Apt B6
Close - Plumbing
Basin/sink
Jul 27, 2026 · Apt B6
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt B6
Close - General
Cabinet
Jul 27, 2026 · Apt 6B
Close - Unsanitary condition
Mold
Jun 9, 2026 · Apt B6
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt B6
Close - Plumbing
Basin/sink
Jun 9, 2026 · Apt B6
Close - Plumbing
Basin/sink
Jun 9, 2026 · Apt B6
Close
Show 40 more ↓
- Paint/plaster
Wall
Jun 9, 2026 · Apt B6
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 16, 2025 · Apt A2
Close - General
Cabinet
Dec 16, 2025 · Apt A2
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt A2
Close - Door/window
Door
Jan 15, 2025 · Apt B1
Close - Plumbing
Bathtub/shower
Jun 20, 2024 · Apt A4
Close - Unsanitary condition
Mold
Jun 20, 2024 · Apt A4
Close - Paint/plaster
Ceiling
Jan 26, 2024 · Apt B5
Close - Paint/plaster
Wall
Jan 26, 2024 · Apt B5
Close - Unsanitary condition
Pests
Jan 26, 2024 · Apt B5
Close - Unsanitary condition
Pests
Jan 26, 2024 · Apt B5
Close - Plumbing
Basin/sink
Jan 26, 2024 · Apt B5
Close - Paint/plaster
Wall
Dec 8, 2023 · Apt B2
Close - Plumbing
Basin/sink
Aug 8, 2023 · Apt B6
Close - Safety
Window guard broken/missing
Jul 21, 2023 · Apt B6
Close - Door/window
Door
Jul 19, 2023 · Apt D4
Close - Door/window
Window pane
Jul 19, 2023 · Apt D4
Close - Appliance
Electric/gas range
Jul 19, 2023 · Apt D4
Close - Paint/plaster
Ceiling
Jul 19, 2023 · Apt D4
Close - Paint/plaster
Ceiling
Jul 3, 2023 · Apt B6
Close - Paint/plaster
Ceiling
Jun 26, 2023 · Apt B6
Close - Water leak
Heavy flow
Jun 12, 2023 · Apt C6
Close - General
Cooking gas
Jun 8, 2023 · Apt A4
Close - Electric
No lighting
Jun 8, 2023 · Apt A4
Close - Electric
Power outage
Jun 8, 2023 · Apt A4
Close - Paint/plaster
Ceiling
May 26, 2023 · Apt A2
Close - Plumbing
Basin/sink
May 26, 2023 · Apt B2
Close - Paint/plaster
Ceiling
May 26, 2023 · Apt A2
Close - Flooring/stairs
Floor
May 26, 2023 · Apt A2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 23
- Building area
- 16,600 ft²
- Lot area
- 6,000 ft²
- Zoning
- R7A
- Community board
- 311
- Council district
- 44
- Block / lot
- 6652 / 10
- Assessed value
- $641,700
- Landmark / historic district
- No
HPD registration #309028, last renewed Sep 8, 2025.
Questions about 1710 West 4 Street
Who owns 1710 West 4 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1710 W 4th LLC.
Does 1710 West 4 Street have violations?
Yes. NYC HPD has recorded 846 housing violations at this property.
Is 1710 West 4 Street rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1710 West 4 Street built?
City records list 1928 as the year it was built.
How many apartments are in 1710 West 4 Street?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.