1629 West 10 Street
Brooklyn, NY 11223BBL 3-06622-0066Map
Owner of record: C&Z Realty Co
1629 West 10 Street is a walk-up apartment building built in 1930 in Brooklyn, 11223. It has 23 residential units across 4 floors. The owner of record is C&Z Realty Co. HPD has recorded 162 housing violations here, most recently on September 16, 2026. 6 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 162
- DOB violations
- 4
- ECB violations
- 2
- HPD complaints
- 83
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 162
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the vestibule at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling in the vestibule at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at bulkhead door leading to the roof at public hall stairs, 4th story
Sep 16, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the vestibule at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 25, 2026
Open — False certification - CImmediately hazardous
Properly repair or replace the broken or defective wire glass at lower sash window 1st from west at north, at public hall, 4th story
Jun 25, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal door frame at east entrance door to roof at 1st public hall bulkhead from north at center, 4th story
Jun 25, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Mar 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Mar 6, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt d1, 4th story, 2nd apartment from east at south
Mar 6, 2025 · Apt D1
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective vinyle tiles at floor in the kitchen located at apt d1, 4th story, 2nd apartment from east at south
Mar 6, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items and baby strollers at public hall, 1st story
Mar 6, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glazing at bathtub surface in the bathroom located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latchset assembly at the apartment door, in the entrance located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at the entrance to the roof , at 1st public hall bulkhead from east, 4th story
Jan 30, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 4th story
Jan 30, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures no gas to ranges, in the kitchen located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and south wall, in the kitchen located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north meast and south walls, in the bathroom located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 30, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north and east walls, in the foyer located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeded maximum allow temperature of 130.f degrees at hotwater fixtures, in the entire apartment located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing, in the entire apartment located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs, in the entrance located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator at north wall, in the 2nd room from north at west located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed on entrance door at room with fire escape window , in the 2nd room from north at west located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at the east,south walls and recessed walls of the window 1st from north at east. in the bathroom located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective wadhbasin, at east wall, in the bathroom located at apt d1, 4th story, 2nd apartment from east at south
Jan 30, 2025 · Apt D1
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at south stack at building front at fire escape
Nov 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to north yard at public hall, 1st story
Mar 11, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c4, 3rd story, 2nd apartment from west at north
Mar 11, 2024 · Apt C4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the east wall in the 1st room from east located at apt c4, 3rd story, 2nd apartment from west at north
Mar 11, 2024 · Apt C4
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east located at apt c4, 3rd story, 2nd apartment from west at north
Mar 11, 2024 · Apt C4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt c4, 4th story, 2nd apartment from west at north
Feb 1, 2024 · Apt C4
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt c4, 4th story, 2nd apartment from west at north
Feb 1, 2024 · Apt C4
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall in the kitchen located at apt a4, 1st story, 2nd apartment from east at south original violation 16578024 issued 08-jan-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the kitchen located at apt a4, 1st story, 2nd apartment from east at south original violation 16578023 issued 08-jan-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste pipe at washbasin in the bathroom located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance lower sash at 2nd window from south at west in the bathroom located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north at west located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, 1st closet from north at east wall wall in the 3rd room from north at west located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall in the kitchen located at apt a4, 1st story, 2nd apartment from east at south
Jan 8, 2024 · Apt A4
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt c4, 3rd story, 2nd apartment from west at north
Jan 4, 2024 · Apt C4
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt c4, 3rd story, 2nd apartment from west at north
Jan 4, 2024 · Apt C4
Closed — Violation closed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 2
- Class - 1
At time of inspection observed. at exposure #3 at 4 floor fire escape access obstructed by window mounted ac unit. at exposure #3 at 2nd floor stored flower pots on fire escape. also breezeway from back of the
Jun 21, 2021 · Penalty $312
Resolve - Class - 2
Hold down clamp missing from rear access door, body drain on relief valve not piped down, fresh air access partially blocked. correct violating conditions and submit a certificate of correction
Jun 10, 2019 · Penalty $625
Resolve
Complaints
- Door/window
Window frame
Aug 12, 2026 · Apt D5
Close - Appliance
Refrigerator
Aug 12, 2026 · Apt D5
Close - Electric
Outlet/switch
Aug 12, 2026 · Apt D5
Close - Plumbing
Basin/sink
Aug 12, 2026 · Apt D5
Close - Door/window
Window frame
Apr 27, 2026 · Apt D5
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2025 · Apt A5
Close - Heat/hot water
Entire building
Jan 29, 2025 · Apt BLDG
Close - Plumbing
Toilet
Dec 6, 2024 · Apt D5
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jan 7, 2024 · Apt A4
Close - Door/window
Door
Jan 7, 2024 · Apt A4
Close - Paint/plaster
Ceiling
Jan 7, 2024 · Apt A4
Close - Door/window
Door
Jan 7, 2024 · Apt A4
Close - Paint/plaster
Ceiling
Jan 3, 2024 · Apt C4
Close - Heat/hot water
Apartment only
Jan 3, 2024 · Apt C4
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2023 · Apt BLDG
Close - Plumbing
Basin/sink
Dec 27, 2022 · Apt A3
Close - Door/window
Window frame
Oct 10, 2022 · Apt D5
Close - General
Mailbox
Apr 5, 2022 · Apt D5
Close - Appliance
Electric/gas range
Mar 7, 2022 · Apt D5
Close - General
Mailbox
Feb 27, 2022 · Apt D5
Close - Plumbing
Basin/sink
Jan 31, 2022 · Apt D5
Close - General
Mailbox
Jan 31, 2022 · Apt D5
Close - Heat/hot water
Entire building
Feb 27, 2021 · Apt D3
Close - General
Cooking gas
Jun 6, 2019 · Apt BLDG
Close - General
Cooking gas
Jun 6, 2019 · Apt C4
Close - Heat/hot water
Entire building
Jun 6, 2019 · Apt C4
Close - General
Cooking gas
Jun 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 6, 2019 · Apt BLDG
Close - Appliance
Electric/gas range
Jun 5, 2019 · Apt C6
Close - Heat/hot water
Apartment only
Jun 5, 2019 · Apt C6
Close - Plumbing
Water-leaks
Jan 23, 2014 · Apt A4
Close - General
Mold
Jan 23, 2014 · Apt A4
Close - Heating
Heat related
Dec 12, 2013 · Apt C4
Close - General
Doors
Sep 23, 2013 · Apt 5C
Close - Nonconst
Vermin
Sep 23, 2013 · Apt 5C
Close - General
Floor
Sep 23, 2013 · Apt 5C
Close - General
Windows
Jul 30, 2012 · Apt C3
Close - Paint/plaster
Ceiling
Jul 30, 2012 · Apt C3
Close - General
Ceramic-tile
Jul 30, 2012 · Apt C3
Close - Plumbing
Basin/sink
Jul 30, 2012 · Apt C3
Close - Plumbing
Bathtub/shower
Jul 30, 2012 · Apt C3
Close - General
Windows
Jul 30, 2012 · Apt C3
Close - Nonconst
Vermin
Jul 30, 2012 · Apt C3
Close - General
Cabinet
Jul 28, 2012 · Apt B3
Close - General
Mold
Jul 28, 2012 · Apt B3
Close - Paint/plaster
Ceiling
Jul 11, 2012 · Apt B6
Close - General
Doors
Jul 11, 2012 · Apt B6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 4
- Residential units
- 23
- Building area
- 17,840 ft²
- Lot area
- 6,500 ft²
- Zoning
- R5B
- Community board
- 311
- Council district
- 43
- Block / lot
- 6622 / 66
- Assessed value
- $736,200
- Landmark / historic district
- No
HPD registration #306812, last renewed Aug 15, 2025.
Questions about 1629 West 10 Street
Who owns 1629 West 10 Street?
The owner of record in NYC Department of City Planning PLUTO data is C&Z Realty Co.
Does 1629 West 10 Street have violations?
Yes. NYC HPD has recorded 162 housing violations at this property.
Is 1629 West 10 Street rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1629 West 10 Street built?
City records list 1930 as the year it was built.
How many apartments are in 1629 West 10 Street?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.