1501 East 10 Street
Brooklyn, NY 11230BBL 3-06617-0001Map
Owner of record: 1501 E 10th LLC
1501 East 10 Street is a walk-up apartment building built in 1925 in Brooklyn, 11230. It has 20 residential units across 4 floors. The owner of record is 1501 E 10th LLC. HPD has recorded 295 housing violations here, most recently on May 4, 2026. 8 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 295
- DOB violations
- 9
- ECB violations
- 1
- HPD complaints
- 220
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 295
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, south wall, east wall, west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the foyer located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the private hallway located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from north at east wall, north wall in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, east wall, west wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete pavement adjacent to basement entrance at south yard
Oct 8, 2025
Closed — Violation closed - BHazardous
Replace with new the missing handrail at basement entrance at south yard
Oct 8, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the yard at the rear of the building and south yard
Oct 8, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of motorcylces parked and stored at yard at bulding rear and south yard
Oct 8, 2025
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors , at public hall, 4th story
Oct 8, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective hinges at door in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood sub floor in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Oct 8, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of push paddle alarm latching device at bulkhead door at roof
Oct 8, 2025
Closed — Violation closed - BHazardous
Provide lids for trash receptacles at yard
Oct 8, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective brick and mortar at south facade at south yard
Oct 8, 2025
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at south wall at public hall, 1st story
Oct 2, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at east yard
Oct 2, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of ladder at bulkhead
Oct 2, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall, west wall in the foyer located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the private hallway located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective door at bathroom in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall in the kitchen located at apt 1b, 1st story, 2nd apartment from east at south
Mar 12, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door. at public hall, 1st story
Dec 28, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling, south and west wall in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Oct 7, 2024 · Apt 1B
Open — Defect letter issued - CImmediately hazardous
Repair the leaky and/or defective water supply pipe at bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Oct 7, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Sep 25, 2024
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 35 sq.ft at ceiling , south. west and east wall in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the private hallway located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Jul 14, 2024 · Apt 1B
Closed — Violation closed
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Sep 27, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 1
- Hazardous
Failure to maintain adequate housekeeping illegal storage of construction/demolition debris in black construction bags some open/closed piled-up on the east side of said premises. creating hazardous/health/
Jun 1, 2006 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Door/window
Door
Jan 13, 2025 · Apt 1B
Close - Door/window
Door frame
Jan 13, 2025 · Apt 1B
Close - Plumbing
Bathtub/shower
Jan 13, 2025 · Apt 1B
Close - General
Cabinet
Jan 13, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 4E
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Oct 2, 2024 · Apt 1B
Close - Door/window
Door
Oct 2, 2024 · Apt 1B
Close - Water leak
Slow leak
Sep 20, 2024 · Apt 3B
Close
Show 40 more ↓
- Unsanitary condition
Mold
Sep 20, 2024 · Apt 3B
Close - Door/window
Door
Sep 20, 2024 · Apt 3B
Close - Door/window
Door
Jul 29, 2024 · Apt 3A
Close - General
Bell/buzzer/intercom
Jul 29, 2024 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jul 29, 2024 · Apt 3A
Close - Plumbing
Bathtub/shower
Apr 19, 2024 · Apt 4E
Close - Plumbing
Basin/sink
Mar 8, 2024 · Apt 1B
Close - Appliance
Electric/gas range
Mar 8, 2024 · Apt 1B
Close - Plumbing
Water supply
Mar 8, 2024 · Apt 1B
Close - Plumbing
Bathtub/shower
Mar 8, 2024 · Apt 1B
Close - Plumbing
Bathtub/shower
Mar 8, 2024 · Apt 1B
Close - Electric
Lighting
Mar 8, 2024 · Apt 1B
Close - Plumbing
Basin/sink
Mar 20, 2023 · Apt 4E
Close - Heat/hot water
Entire building
Feb 1, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
Jun 15, 2022 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 7, 2022 · Apt 2C
Close - Water leak
Slow leak
Jul 21, 2020 · Apt 4A
Close - Heat/hot water
Entire building
Apr 20, 2020 · Apt 3A
Close - Unsanitary condition
Mold
Jan 20, 2020 · Apt 2D
Close - General
Cabinet
Jan 6, 2020 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 6, 2020 · Apt 2C
Close - General
Mailbox
May 2, 2019 · Apt 2C
Close - Plumbing
Toilet
May 2, 2019 · Apt 2C
Close - Plumbing
Toilet
May 2, 2019 · Apt 2C
Close - General
Mailbox
Apr 4, 2019 · Apt 2D
Close - General
Mailbox
Mar 22, 2019 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 17, 2019 · Apt 2C
Close - General
Bell/buzzer/intercom
Feb 5, 2019 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 24, 2019 · Apt 2C
Close - General
Cooking gas
Jan 23, 2019 · Apt 4E
Close - Safety
Window guard broken/missing
Jan 4, 2019 · Apt 3D
Close - Unsanitary condition
Mold
Jan 4, 2019 · Apt 3D
Close - Door/window
Door
Jan 4, 2019 · Apt 3D
Close - Electric
Outlet/switch
Jan 4, 2019 · Apt 3D
Close - Plumbing
Basin/sink
Jan 4, 2019 · Apt 3D
Close - Flooring/stairs
Floor
Jan 4, 2019 · Apt 3D
Close - Plumbing
Radiator
Jan 4, 2019 · Apt 3D
Close - Plumbing
Radiator
Jan 4, 2019 · Apt 3D
Close - General
Bell/buzzer/intercom
Jan 4, 2019 · Apt 3D
Close - Plumbing
Toilet
Jan 4, 2019 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 4
- Residential units
- 20
- Building area
- 11,840 ft²
- Lot area
- 4,000 ft²
- Zoning
- R5
- Community board
- 312
- Council district
- 44
- Block / lot
- 6617 / 1
- Assessed value
- $588,600
- Landmark / historic district
- No
HPD registration #316198, last renewed Aug 31, 2025.
Questions about 1501 East 10 Street
Who owns 1501 East 10 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1501 E 10th LLC.
Does 1501 East 10 Street have violations?
Yes. NYC HPD has recorded 295 housing violations at this property.
Is 1501 East 10 Street rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 90% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1501 East 10 Street built?
City records list 1925 as the year it was built.
How many apartments are in 1501 East 10 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.