505 Elmwood Avenue
Brooklyn, NY 11230BBL 3-06503-0051Map
Owner of record: 505 Avenue Realty, LLC
505 Elmwood Avenue is an elevator apartment building built in 1938 in Brooklyn, 11230. It has 65 residential units across 6 floors. The owner of record is 505 Avenue Realty, LLC. HPD has recorded 391 housing violations here, most recently on June 28, 2026. 25 of the 50 most recent violations are still open. City tax records listed 64 rent-stabilized apartments here in 2024.
- HPD violations
- 391
- DOB violations
- 31
- ECB violations
- 24
- HPD complaints
- 504
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 391
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 1st room from north at east, the 3rd room from north at east located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waistline at sink in the kitchen located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective countertop at sink in the kitchen located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waistline at bathtub in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at washbasin in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling in the 3rd room from north at east located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 1c, 1st story, 5th apartment from west at north
Jun 28, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and at south wall in the bathroom located at apt 2c, 2nd story, 3rd apartment from west at north original violation 19023860 issued 22-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 22, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and at south wall in the bathroom located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2c, 2nd story, 3rd apartment from west at north
Jun 22, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6l, 6th story, 3rd apartment from west at north
Apr 14, 2026 · Apt 6L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6l, 6th story, 3rd apartment from west at north
Apr 14, 2026 · Apt 6L
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6l, 6th story, 3rd apartment from west at north
Dec 16, 2025 · Apt 6L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set in the entrance located at apt 6l, 6th story, 3rd apartment from west at north
Dec 16, 2025 · Apt 6L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 6l, 6th story, 3rd apartment from west at north
Dec 16, 2025 · Apt 6L
Open — Not complied with - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6g, 6th story, 4th apartment from east at south
Nov 14, 2025 · Apt 6G
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5f, 5th story, 3rd apartment from east at south
Nov 14, 2025 · Apt 5F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1j, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1J
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6d, 6th story, 1st apartment from east at south
Nov 14, 2025 · Apt 6D
Open — Not complied with - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3g, 3rd story, 4th apartment from east at south
Nov 14, 2025 · Apt 3G
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2l, 2nd story, 3rd apartment from west at north
Nov 14, 2025 · Apt 2L
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1a, 1st story, 4th apartment from west at north
Nov 14, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 6th apartment from west at north
Nov 14, 2025 · Apt 5C
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4k, 4th story, 2nd apartment from west at north
Nov 14, 2025 · Apt 4K
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4f, 4th story, 3rd apartment from east at south
Nov 14, 2025 · Apt 4F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1h, 1st story, 4th apartment from east at south
Nov 14, 2025 · Apt 1H
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2f, 2nd story, 3rd apartment from east at south
Nov 14, 2025 · Apt 2F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1c, 1st story, 6th apartment from west at north
Nov 14, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at compactor closet, 6th story
Sep 25, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 6c, 6th story, 3rd apartment from west at north
Sep 25, 2025 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6c, 6th story, 3rd apartment from west at north
Sep 25, 2025 · Apt 6C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 6c, 6th story, 3rd apartment from west at north original violation 18254536 issued 25-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Sep 25, 2025 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6c, 6th story, 3rd apartment from west at north
Sep 25, 2025 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 6c, 6th story, 3rd apartment from west at north
Sep 25, 2025 · Apt 6C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 6c, 6th story, 3rd apartment from west at north
Sep 25, 2025 · Apt 6C
Closed — Violation dismissed
DOB building violations · 31
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 1, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner. at time of inspection, observed in apt 5g, open ceiling exposing floor joists tripled, with multiple bolts on both side. installed steel teco's on bridging and observed nails missing on one side.
Feb 20, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Plumbing none
I observed in basement area no sprinkler coverage for several commercial electric dryers...you are hereby ordered to immediately correct the above condition(s) by retaining a lie. professional to perform all work necessary to restore the non compliant condition(s) to a code compliant state.
May 18, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 27, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed
Show 21 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 22, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report(eer) per ad. code sec. 28-308.4
Sep 1, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 4, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2005
Dob violation - resolved - Elevator elevatorrequired
3p395
Aug 2, 2000
Dob violation - resolved - Construction other optional
C-construction other optional
Nov 14, 1997
Dob violation - dismissed
ECB violations · 24
- Class - 1
In apt 5g,in kitchen area,ceiling open approximately 3' x 10'missing finish. observed structural repair to joist with bolting additional joist pieces to existing joist, teco's installed., repair and/replace
Feb 20, 2024
Resolve - Class - 2
I observed in apt 5g corroded gas piping due to a water leak which is prohibited and not code complaint as per fgc 403.7 gas was locked off at meter in basement prior to our inspection..., repair and/or replace
May 18, 2023 · Penalty $312
Active - Class - 1
I observed in basement laundry room area several commercial electric dryers and no sprinkler system and/or around area which is prohibited and not code complaint as per bc 903.2.11.13... cease used dryers at ti
May 18, 2023 · Penalty $2,500
Resolve - Class - 2
Work w/out a permit noted:(1) according to report of p.e. v. kotlgarovdated 07/05/16 there are partial structural deterioration & (disintegration) of existing wood fl joists @kitchen area.(2) this conclusion (c
Aug 8, 2017 · Penalty $800
Resolve - Class - 1
Work w/out permit.noted:@time of insp i observed three workers removing coping stones @roof level leading edge across all exposures w/out permit."stop all work"rem:obtain permit.
Aug 5, 2017
Resolve - Class - 2
Failure to comply w/comm's order to file a cert of correction w/dob nocompliance recorded for vio#35141954h.rem:file cert of correction.
Jun 16, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/comm's order to file a cert of correction w/dob nocompliance recorded for vio #35141955j; 35204132y both of them for corroded ga piping in apt 5g.rem:file cert of correction.
Jun 16, 2017 · Penalty $800
Resolve - Class - 2
Failur eto comply w/com's order to file a cert of correction w/dob no compliance recorded for vio#35204093k.rem:file cert of correction.
Jun 16, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. on 5-1-17 @ approx 12:45pm i observed in apt 5g a gas riser pipe going from apt 5g through 6g all corroded which is not code compliant. remedy: repair &/or rep
May 1, 2017
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. on 1-4-17 @ approx 12:15am i observed on the 5th fl apt 5g gas piping corroded in the kitchen area which is not code cokpliant. remedy: repair &/or replace.
Jan 4, 2017 · Penalty $2,500
Resolve
Show 14 more ↓
- Class - 1
Failure to maintain bldg in code compliant manner.lack of a suystem ofautomatic sprinklers where required per bc 903.2;27-954.time of inspextion 11:45am @time of inspection in laundry room i observed 3 gas fire
Dec 20, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.time of inspection 11:45am @time of inspection in laundry room i observed 3 gas fired dryer w. flexible flue pipes and flexible gas connections it must be hard
Dec 20, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35180499r issued on 5/19/16 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.for cofc for there is no fire rated
Aug 22, 2016 · Penalty $4,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35180499r issued on 05/19/16 and to file a certificate of correction pursuant to 28-201.1, 28-204.4 and 1rcny 102-01. rem: comply with commission
Jun 30, 2016 · Penalty $4,000
Resolve - Class - 1
Failure to mintain bldg in code compliant manner. noted: @ time of insp, observed in apt 5g there is no fire rated sheetrock on wall or ceiling to protect from fire. walls were removed to repair water damage &
May 19, 2016 · Penalty $5,000
Active - Class - 1
Failure to maintain bldg in code compliant manner.time of inspection 126pm above the date.@ time of inspection i observed 3/4" gas pipe corroded on apt 5g on kitchen area.rem repair &/or replace
Mar 31, 2016 · Penalty $2,500
Resolve - Class - 2
Work w/o a permit.time of inspection 126pm above the date.@ time of inspection i observed an apt5g repaired water lines behind wall for kitchen sink & installation new speedy valves for kitchen sink.no permit o
Mar 31, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg walls & appurtenances. at 2nd fl balcony on right side of bldg: bricks missing & more are loose -3rd & 5th fl bottom of balconies,spalling & cracked concrete. remedy: repair &/or replac
Mar 8, 2014 · Penalty $250
Resolve - Class - 1
Failure to maintain bldg.noted:@ right side of existing.bldg,observed balconies w/dislodged bricks(approx 1'x4' @3rd&5th floors)also observed spalling of mortar thru-out"d"line balconies.rem:repair defects fort
Jan 7, 2014 · Penalty $500
Resolve - Class - 2
03x10,44h11 repair,provide phone replace traction sheave worn
Aug 21, 2013 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. apt 5k, bathroom ceiling partially collapsed. collapsing ceiling hit tenant while in bathroom. wood flr joists now exposed. remedy: repair/replace partially
Aug 15, 2012 · Penalty $1,000
Resolve - Class - 1
21l10,21j10,20q03,05j10,05m07,39o02,35q10.21l-cease use item on 4fl car door closes w/hoistway door open defective old stanley lock.21j-pulling on bsmt hoist door stops car in flight.20q-bsmt hoist door.05-
Feb 11, 2009 · Penalty $1,000
Resolve - Non-hazardous
86bb05/08v10/60l10. (85-bb-05)current 2 year test tag is expired. (03-oo(08-v-10)car floor is not level with car saddle. (tripping hazard) (60-l-10)main line disconnect switch is defective. repair cover.
May 1, 2006
Resolve - Non-hazardous
Failure to maintain building. defect is due to water building into apartment #4d the plater on the walls & ceiling of living room is cracked, loose, & missing. also door to terrace is defective, door frame root
Nov 14, 1997
Resolve
Complaints
- Paint/plaster
Ceiling
Jul 1, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 4C
Close - Paint/plaster
Wall
Jul 1, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Jul 1, 2026 · Apt 4C
Close - Water leak
Heavy flow
Jun 21, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Jun 21, 2026 · Apt 2C
Close - Water leak
Heavy flow
Jun 21, 2026 · Apt 1C
Close - Plumbing
Basin/sink
Jun 21, 2026 · Apt 1C
Close - Unsanitary condition
Mold
Jun 21, 2026 · Apt 1C
Close - Plumbing
Bathtub/shower
Jun 21, 2026 · Apt 1C
Close
Show 40 more ↓
- Appliance
Electric/gas range
Mar 19, 2026 · Apt 6L
Close - Unsanitary condition
Pests
Mar 19, 2026 · Apt 6L
Close - Electric
Lighting
Mar 19, 2026 · Apt 6L
Close - Unsanitary condition
Pests
Dec 13, 2025 · Apt 6L
Open - Appliance
Electric/gas range
Dec 13, 2025 · Apt 6L
Open - Electric
Outlet/switch
Dec 13, 2025 · Apt 6L
Open - Heat/hot water
Apartment only
Dec 13, 2025 · Apt 6L
Open - Paint/plaster
Ceiling
Sep 24, 2025 · Apt 6C
Close - Paint/plaster
Ceiling
Sep 24, 2025 · Apt 6C
Close - Unsanitary condition
Mold
Sep 24, 2025 · Apt 6C
Close - Paint/plaster
Wall
Sep 24, 2025 · Apt 6C
Close - Paint/plaster
Ceiling
Sep 24, 2025 · Apt 6C
Close - Water leak
Heavy flow
Sep 24, 2025 · Apt 6C
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Dec 13, 2024 · Apt 6K
Close - Heat/hot water
Apartment only
Dec 1, 2024 · Apt 4G
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2023 · Apt BLDG
Close - General
Cabinet
Sep 28, 2023 · Apt 6L
Close - Plumbing
Basin/sink
Sep 28, 2023 · Apt 6L
Close - Heat/hot water
Entire building
Mar 15, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 15, 2023 · Apt 4H
Close - Heat/hot water
Entire building
Mar 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2023 · Apt BLDG
Close - Safety
Fire escape
Jan 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2022 · Apt BLDG
Close - Plumbing
Water supply
Dec 12, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 11, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1938
- Floors
- 6
- Residential units
- 65
- Building area
- 67,500 ft²
- Lot area
- 18,060 ft²
- Zoning
- R3-1
- Community board
- 312
- Council district
- 40
- Block / lot
- 6503 / 51
- Assessed value
- $1,902,150
- Landmark / historic district
- No
HPD registration #300878, last renewed Aug 20, 2025.
Questions about 505 Elmwood Avenue
Who owns 505 Elmwood Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 505 Avenue Realty, LLC.
Does 505 Elmwood Avenue have violations?
Yes. NYC HPD has recorded 391 housing violations at this property.
Is 505 Elmwood Avenue rent stabilized?
NYC Department of Finance tax bills listed 64 rent-stabilized units here in 2024 (about 98% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 505 Elmwood Avenue built?
City records list 1938 as the year it was built.
How many apartments are in 505 Elmwood Avenue?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.