763 Ocean Parkway
Brooklyn, NY 11230BBL 3-06494-0051Map
Owner of record: 763 Ocean Parkway Corporation
763 Ocean Parkway is an elevator apartment building built in 1937 in Brooklyn, 11230. It has 124 residential units across 6 floors. The owner of record is 763 Ocean Parkway Corporation. HPD has recorded 352 housing violations here, most recently on September 15, 2026. 9 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 352
- DOB violations
- 45
- ECB violations
- 10
- HPD complaints
- 368
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 352
- BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 5c, 5th story, 5th apartment from south at west
Sep 15, 2026 · Apt 5C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor and south wall in the bathroom located at apt 5c, 5th story, 5th apartment from south at west
Sep 15, 2026 · Apt 5C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor (sloping) in the kitchen located at apt 5c, 5th story, 5th apartment from south at west
Sep 15, 2026 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window frame at 1st and 2nd window from south at west in the 3rd room from north at west located at apt 5c, 5th story, 5th apartment from south at west
Sep 15, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator cover in the 3rd room from north at west located at apt 5c, 5th story, 5th apartment from south at west
Sep 15, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 1st apartment from north at east
Sep 3, 2026 · Apt 4F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at public hall, 2nd story
Aug 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at staircase (b) at fire stairs
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at public hall
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 3rd story
Aug 7, 2025
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 5th story
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at public hall, 6th story
Aug 7, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective safety electrical outlet caps at public hall, 1st story
May 19, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 19, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 19, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 19, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 19, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroom located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
Jun 13, 2024 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchen located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
Jun 13, 2024 · Apt 2G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at compactor closet, 1st story, section ''north''
Jun 13, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at trash chute hopper door at compactor closet, 1st story, section ''north''
Jun 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 1st story, section ''north''
Jun 13, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at over ceiling ( inside the window) in the 1st room from north located at apt 6h, 6th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color inside the window stool area at east wall in the 1st room from north located at apt 6h, 6th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 6H
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective cracked wire glass at, upper sash window , to north wall , south section, at public hall stairs, 1st story
Mar 7, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at balcony at south stack at building front at fire escape, 6th story
Oct 11, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding more than 4'' beyond window sill at south stack at building front at fire escape, 5th story
Oct 11, 2023
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical outlet safety caps at north east and south walls in vestibule at public hall, 1st story
Oct 11, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 11, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at balcony at east at 1st fire escape from north, 3rd story
Apr 26, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective compactor closet at public hall, 5th story
Apr 3, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6h, 6th story, 1st apartment from south at west
Mar 24, 2023 · Apt 6H
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 1st apartment from south at west
Mar 24, 2023 · Apt 6H
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ,active leak at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Oct 27, 2020 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ,at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Oct 27, 2020 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Feb 26, 2020 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 6b, 6th story, 1st apartment from south at west
Feb 26, 2020 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2020 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2020 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2020 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2020 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jul 16, 2018
Closed — Violation dismissed
DOB building violations · 45
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2015
Dob violation - resolved
Show 35 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2005
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Mar 9, 2004
Dob violation - dismissed - Elevator elevatorrequired
3p2619
Aug 27, 2002
Dob violation - resolved - Elevator elevatorrequired
3p2619
Sep 27, 2001
Dob violation - resolved - Elevator elevatorrequired
3p2206
Sep 27, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 1992
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 10
- Class - 2
Inoperative phone. misaligned cab mirror. secure dome. clean glass from machine room worn machine room sign
Dec 11, 2020
Resolve - Class - 2
6a,50a,50b,50c,b254. for boiler model federal fst 125. as per class 2(28-301.1) failure to maintain. 6a-missing body drain discharge on re() valves. 50a-no shut off valve at tank, 60b-expose wiring, 50c-tank
Sep 11, 2018
Resolve - Class - 2
B254,6a,50a,50b. for boiler model-federal fst 125. as per class 2 (28201.1) failure to maintain; 6a-missing body drain discharge on relief valves, 50a-no shut off valve at tank, 50b-exposed wiring. correct all
Sep 11, 2018
Resolve - Hazardous
Supervision/use of rigging equipment w/o a special rigger's license. remedy: stop all work! obtain a license.
Apr 26, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior of bldg. extensive deteriorating conditions in lintels, cracks & spalling on the east elevation. remedy: repair & replace all defects
Nov 9, 2004 · Penalty $350
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Aug 20, 2004
Resolve - Hazardous
Failure to maintain exterior building wall. multiple location defects typical at several window head/lintels; cracking and disintegrating lintels w/loose masonry. improperly supported window mtd ac's found at
Aug 16, 2004 · Penalty $800
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Feb 6, 2004
Resolve - Non-hazardous
Failure to maintain exterior bldg. defect is : an acumulation of construction/household debris at court yard. remedy: make safe remove debris maintain building.
Jun 27, 2001
Resolve - Non-hazardous
50l,.
Sep 8, 1995
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 25, 2026 · Apt 4F
Close - General
Janitor/super
Aug 25, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 4FAND4
Close - Paint/plaster
Radiator
Aug 4, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Aug 4, 2026 · Apt 5C
Close - Appliance
Electric/gas range
Aug 4, 2026 · Apt 5C
Close - Flooring/stairs
Floor
Aug 4, 2026 · Apt 5C
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 5C
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 5C
Close - Paint/plaster
Radiator
Aug 4, 2026 · Apt 5C
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 4, 2026 · Apt 5C
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 5C
Close - Plumbing
Steam pipe/riser
Feb 5, 2026 · Apt 4F
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 12, 2025 · Apt 1J
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Dec 2, 2024 · Apt 3A
Close - Plumbing
Basin/sink
Dec 2, 2024 · Apt 3A
Close - Appliance
Refrigerator
Dec 2, 2024 · Apt 3A
Close - Plumbing
Basin/sink
Dec 2, 2024 · Apt 3A
Close - Appliance
Electric/gas range
Dec 2, 2024 · Apt 3A
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Plumbing
Toilet
Oct 17, 2024 · Apt 6H
Close - Unsanitary condition
Mold
Jun 10, 2024 · Apt 2G
Close - Paint/plaster
Ceiling
Jun 10, 2024 · Apt 2G
Close - Door/window
Window pane
Jun 10, 2024 · Apt 2G
Close - Heat/hot water
Entire building
Apr 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 26, 2023 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 19, 2023 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 15, 2023 · Apt 6H
Close - Heat/hot water
Entire building
Dec 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2023 · Apt 6B
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2023 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 28, 2026 | $240,000 | Coops - elevator apartments | — |
| Apr 29, 2026 | $419,000 | Coops - elevator apartments | — |
| Apr 17, 2026 | $325,000 | Coops - elevator apartments | — |
| Nov 17, 2025 | Non-market transfer | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1937
- Floors
- 6
- Residential units
- 124
- Building area
- 138,600 ft²
- Lot area
- 40,000 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 45
- Block / lot
- 6494 / 51
- Assessed value
- $4,586,850
- Landmark / historic district
- No
HPD registration #320061, last renewed Aug 20, 2025.
Questions about 763 Ocean Parkway
Who owns 763 Ocean Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 763 Ocean Parkway Corporation.
Does 763 Ocean Parkway have violations?
Yes. NYC HPD has recorded 352 housing violations at this property.
Is 763 Ocean Parkway rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 5% of its 124 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 763 Ocean Parkway built?
City records list 1937 as the year it was built.
How many apartments are in 763 Ocean Parkway?
It has 124 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.