8785 Bay 16 Street
Brooklyn, NY 11214BBL 3-06434-0021Map
Owner of record: 8785 Bay 16 Street, LLC
8785 Bay 16 Street is a walk-up apartment building built in 1927 in Brooklyn, 11214. It has 34 residential units across 4 floors. The owner of record is 8785 Bay 16 Street, LLC. HPD has recorded 39 housing violations here, most recently on November 17, 2017. 10 of the 39 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 39
- DOB violations
- 7
- ECB violations
- 6
- HPD complaints
- 206
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a1, 1st story, 3rd apartment from south at west
Nov 17, 2017 · Apt A1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to boiler room at cellar
Nov 17, 2017
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 17, 2017
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a2, 1st story, 2nd apartment from west at north
Nov 15, 2017 · Apt A2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt a4, 1st story, 1st apartment from north at east
Mar 29, 2016 · Apt A4
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tiles at south wall in the bathroom located at apt a4, 1st story, 1st apartment from north at east
Mar 29, 2016 · Apt A4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt a7, 1st story, 1st apartment from west at north
Feb 18, 2014 · Apt A7
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt a7, 1st story, 1st apartment from west at north
Feb 18, 2014 · Apt A7
Open — Not complied with - ANon-hazardous
Refit door in the entrance located at apt a7, 1st story, 1st apartment from west at north
Feb 18, 2014 · Apt A7
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden base cabinetat sink in the kitchen located at apt a8, 1st story, 1st apartment from south at west
Dec 12, 2013 · Apt A8
Closed — Violation closed
Show 29 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east in the bathroom located at apt a8, 1st story, 1st apartment from south at west
Dec 12, 2013 · Apt A8
Open — Not complied with - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt a8, 1st story, 1st apartment from south at west
Dec 12, 2013 · Apt A8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Closed — Violation closed - BHazardous
Properly repair the broken or defective 3 electrical outlets in the entire apartment located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Closed — Violation closed - ANon-hazardous
Refit entrance door in the entire apartment located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Open — Not complied with - BHazardous
Arrange and make self-closing the doors entrance door in the entire apartment located at apt a7, 1st story, 1st apartment from south at west
Sep 21, 2013 · Apt A7
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter top on sink cabinet in the kitchen located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from north at west located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles on floor in the kitchen located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash counter balance on north window in the kitchen located at apt a8, 1st story, 2nd apartment from west at north
Sep 7, 2013 · Apt A8
Closed — Violation closed - BHazardous
Properly repair the broken or defective locking mechanism on vestibule door at public hall, 1st story
Jun 7, 2013
Closed — Violation closed - ANon-hazardous
Remove device preventing door from being self-closing .....the fire-proof self closing door leading to the rear yard(east) at public hall, 1st story
Jun 3, 2013
Closed — Violation closed - BHazardous
Provide heavy duty lock and latch set vestibule door at public hall, 1st story
Feb 7, 2013
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 4th room from north located at apt d6, 4th story, 1st apartment from south at west
Oct 26, 2012 · Apt D6
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at door vestibule to at public hall, 1st story
Oct 19, 2012
Closed — Violation closed - BHazardous
Provide an acceptable mecanical heavy duty lock and latch set at door vectibule to at public hall, 1st story
Oct 19, 2012
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from west at north wall in the 4th room from north located at apt d6, 4th story, 1st apartment from south at west
May 27, 2011 · Apt D6
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall, 1st window frame from south at west wall in the bathroom located at apt d6, 4th story, 1st apartment from south at west
May 27, 2011 · Apt D6
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from north at east wall in the foyer located at apt d6, 4th story, 1st apartment from south at west
May 27, 2011 · Apt D6
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt d6, 4th story, 1st apartment from south at west
May 27, 2011 · Apt D6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt a7, 1st story, 1st apartment from west at north
Feb 19, 2008 · Apt A7
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at entrance to apt located at apt a7, 1st story, 1st apartment from west at north
Feb 19, 2008 · Apt A7
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt b4, 2nd story, 1st apartment from west at north
Oct 11, 2004 · Apt B4
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Construction other optional
Borough commisioner has issued a 10-day letter of intent to revoke application number 302011169 on 4/03/08.100% approx of work completed time of inspection remedy:stop all work immediately make site safe
Apr 7, 2008
Dob violation - dismissed - Construction other optional
Failure to maintain construction retaining wall at rear - north east corner and north sides. concrete retaining wall approx.2ft. 65ft long has numerous cracks, is not plumb, missing parts at several locations remedy: obtain all applicable permits to do retaining wall repair protect public submit engineering report to dob
Feb 26, 2008
Dob violation - active - Construction other optional
Failure to maintain construction retaining wall at rear - north east c orner & north sides. concrete retaining wall approx. 2 ft x 65 ft long has numerous cracks,is not plumb,missing parts at several locations remedy:obtain all aplicable permits to do retaining wall repair. prote ct public submit engineering report to dob
Feb 26, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 26, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 16, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 6
- Class - 2
Need to hard pipe gas line to gas regulator,seal all holes in boiler room,storage tank leaking for domestic hot water from laars water heater that has hlw stamp,correct violation & send in certificate of correc
Mar 22, 2023
Resolve - Non-hazardous
B4a,16,28a,50,50a,b,c,d,e,f,g,h,i.50-missing anti syphon valve on oil line.50a-missing shut off valve oil on line at tank.50b-blow down valve on l.w.c.o. no goog.50c-boiler needs cleaning & gaskets.50d-burner
Dec 24, 2007 · Penalty $180
Resolve - Hazardous
Failure to maintain bldg.defects noted:vertical/horizontal hairline cracks at various location in apt a7,b7 on the interior west wall where living & bedroom is located. various vertical cracks found at south
Sep 21, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior bldg wall. cracks in facade brickwork,parapet wall & 4th fl section above lintels from street level appears to be pushing outwards.remedy:make all necessary repairs forthwith.
Jun 21, 2006 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain exterior of bldg. cracks in brick work on tn: n/w corner. 4th fl on window lintel wall pushing out. n/w roof parapet wall is cracked w/a vertical crack. wall is loose & danger of falling. re
Feb 8, 2006 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior building wall defect:cracks in front n/w corner 1st & 2nd floors & court yard n/w 1,2,3 floors between window lintels & was & 4th floors n/w corner by parapet wall remedy:make immed
Sep 1, 2005 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Door/window
Door
Dec 16, 2020 · Apt A7
Close - Heat/hot water
Apartment only
Jul 10, 2018 · Apt A7
Close - Heat/hot water
Entire building
Jul 9, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2018 · Apt A7
Close - Heat/hot water
Entire building
Jul 7, 2018 · Apt B6
Close - Heat/hot water
Entire building
Nov 15, 2017 · Apt A1
Close - Heat/hot water
Entire building
Nov 15, 2017 · Apt A7
Close - Heat/hot water
Entire building
Nov 14, 2017 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2017 · Apt 87
Close - Heat/hot water
Entire building
Nov 13, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2017 · Apt A7
Close - Heat/hot water
Entire building
Nov 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt A2
Close - Door/window
Door
Aug 29, 2017 · Apt A7
Close - Heat/hot water
Entire building
Mar 27, 2017 · Apt D7
Close - Heat/hot water
Entire building
Feb 9, 2017 · Apt D8
Close - Plumbing
Water supply
Mar 20, 2016 · Apt A4
Close - Heat/hot water
Entire building
Nov 3, 2014 · Apt 8A
Close - Heat/hot water
Apartment only
Apr 16, 2014 · Apt A8
Close - Heat/hot water
Apartment only
Mar 12, 2014 · Apt A8
Close - Paint/plaster
Wall
Feb 11, 2014 · Apt A7
Close - Paint/plaster
Ceiling
Feb 11, 2014 · Apt A7
Close - General
Windows
Feb 11, 2014 · Apt A7
Close - General
Floor
Feb 11, 2014 · Apt A7
Close - Plumbing
Basin/sink
Feb 11, 2014 · Apt A7
Close - General
Locks
Feb 11, 2014 · Apt A7
Close - General
Doors
Feb 11, 2014 · Apt A7
Close - Plumbing
Radiator
Feb 11, 2014 · Apt A7
Close - Heating
Heat related
Jan 29, 2014 · Apt A8
Close - Heating
Heat related
Jan 23, 2014 · Apt A8
Close - General
Ceramic-tile
Dec 8, 2013 · Apt A8
Close - General
Cabinet
Dec 8, 2013 · Apt A8
Close - Nonconst
Vermin
Dec 8, 2013 · Apt A8
Close - Electric
Electric-supply
Oct 25, 2013 · Apt A7
Close - Electric
Wiring
Sep 7, 2013 · Apt A7
Close - Paint/plaster
Ceiling
Sep 7, 2013 · Apt A7
Close - Plumbing
Basin/sink
Sep 7, 2013 · Apt A7
Close - Paint/plaster
Wall
Sep 7, 2013 · Apt A7
Close - General
Floor
Sep 7, 2013 · Apt A7
Close - General
Floor
Sep 7, 2013 · Apt A7
Close - Electric
Wiring
Sep 7, 2013 · Apt A7
Close - General
Doors
Sep 7, 2013 · Apt A7
Close - General
Doors
Sep 7, 2013 · Apt A7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 34
- Building area
- 29,336 ft²
- Lot area
- 11,900 ft²
- Zoning
- R5
- Community board
- 311
- Council district
- 47
- Block / lot
- 6434 / 21
- Assessed value
- $1,125,000
- Landmark / historic district
- No
HPD registration #317133, last renewed Sep 8, 2025.
Questions about 8785 Bay 16 Street
Who owns 8785 Bay 16 Street?
The owner of record in NYC Department of City Planning PLUTO data is 8785 Bay 16 Street, LLC.
Does 8785 Bay 16 Street have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 8785 Bay 16 Street rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 94% of its 34 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 8785 Bay 16 Street built?
City records list 1927 as the year it was built.
How many apartments are in 8785 Bay 16 Street?
It has 34 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.