7511 New Utrecht Avenue
Brooklyn, NY 11214BBL 3-06225-0036Map
Owner of record: 1655 76th Street LLC
7511 New Utrecht Avenue is a walk-up apartment building built in 1929 in Brooklyn, 11214. It has 33 residential units across 4 floors. The owner of record is 1655 76th Street LLC. HPD has recorded 393 housing violations here, most recently on July 22, 2026. 10 of the 50 most recent violations are still open. City tax records listed 33 rent-stabilized apartments here in 2024.
- HPD violations
- 393
- DOB violations
- 90
- ECB violations
- 17
- HPD complaints
- 696
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 393
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing. at public hall, 1st story
Jul 22, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east court
Jul 1, 2026
Open — Nov certified on time - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 1, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Jul 1, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 30, 2026
Open — Nov certified on time - CImmediately hazardous
Remove device preventing door from being self-closing temporarily installed cord at door leading to south yard at public hall, 1st story
Apr 30, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at north stack building front at fire escape, 4th story
Apr 23, 2026
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at north stack building front at fire escape, 2nd story
Apr 23, 2026
Open — Not complied with - BHazardous
Remove all encumbrances consisting of electric bicycle battery not intact at public hall, 1st story
Apr 23, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at north stack building front at fire escape, 3rd story
Apr 23, 2026
Open — Not complied with
Show 40 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 20, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing ,the string from stairrail looped to door knob of the east entrance door to yard , at public hall at east , 1st story
Apr 20, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall
Apr 8, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at east wall
Mar 17, 2026
Open — Not complied with - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at fire passage way
Mar 2, 2026
Open — Not complied with - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at the front entrance to building, , 1st story
Feb 24, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing ,the string tights from balustrade to door knob of the east entrance door to inner court, at public hall at east , 1st story
Feb 24, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of plastic rope holding door leading to east court at public hall, 1st story
Dec 29, 2025
Open — Not complied with - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east court
Dec 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Dec 3, 2025
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south court
Dec 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt c6, 3rd story, 1st apartment from south at west
Nov 27, 2025 · Apt C6
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c6, 3rd story, 1st apartment from south at west
Nov 27, 2025 · Apt C6
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c6, 3rd story, 1st apartment from south at west
Nov 27, 2025 · Apt C6
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at east in the kitchen located at apt c6, 3rd story, 1st apartment from south at west
Nov 27, 2025 · Apt C6
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landings at all stories at public hall stairs
Nov 26, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Nov 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Nov 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of rope tied to the hand rail at fire door at south leading to the yard at public hall, 1st story, section ''south''
Nov 24, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wired glass panel at skylight , 4th story, section ''south''
Nov 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard , 1st story
Nov 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of string used to hold door at south wall , 1st story
Nov 2, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioning unit protruding beyond window sill more than 4.5 inches at west at building front at fire escape, 3rd story
Oct 31, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed plastic rope at door at east leading to east court at public hall, 1st story
Oct 31, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioning unit protruding beyond window sill more than 4.5 inches at west at building front at fire escape, 2nd story
Oct 31, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of oven with door attached presenting child safety hazard at the north court
Oct 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing rope at south door to yard at public hall, 1st story
Oct 23, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Oct 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at south yard ( garbage area)
Oct 23, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 19, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landings at all stories at public hall stairs
Oct 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance
Oct 16, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 16, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the inner court
Oct 10, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 10, 2025
Closed — Violation dismissed
DOB building violations · 90
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 19, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active
ECB violations · 17
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35584328n issued on 10/27/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Feb 9, 2022 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner.exposure#2 next to laundermat fire escape ladder is obstructed by ac compressor removed obstruction.
Oct 27, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.at the time of inspection and observed at exp#2 on new trecht ave. wallmount hvac unit obstructed pull down ladder from any clear path for emergency exit(laundry)
Aug 30, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:excessive debrisaccumulated obstructing drop ladder.also observed in alley passageway debris piled up obstructing exit.photo taken.remove obstruction.
Jul 9, 2021 · Penalty $3,125
Resolve - Class - 1
At rear of building excessive debris has accumulated and obstructs drop ladder, also in alley passageway debris obstructs exit., remove obstruction
May 18, 2021 · Penalty $1,250
Resolve - Class - 2
B265 as per class 2 (b265)28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.correct all violating conditions and submit the certificate of correction.
Jul 20, 2016 · Penalty $500
Active - Class - 2
B265 as per class 2 (b265)28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.correct all violating conditions and submit the certificate of correction.
Jul 20, 2016 · Penalty $500
Active - Class - 1
Failure to provide unobstructed exit passageway. noted:@ time of insp ection,observed @ exposure#1 there are bicycles blocking the ladder of the fire escape from dropping down to the ground to allow the tenants
Jul 14, 2016 · Penalty $250
Active - Class - 1
Violation of the electrical code technical standards. plug fuses are not of the tamper proof type are in use in cellar at apt fused disconnect switches at 8:40am observed in cellar plug fuses (not tamper proof)
Jul 16, 2013
Resolve - Class - 1
Failure to protect conductors against overcurrent per ec overfused conductors 30amp on #12 awg apt riser in cellar post fire at 8:40am. observed that at apt disconnects switches fused at 30amp plug fuses and
Jul 16, 2013
Resolve
Show 7 more ↓
- Class - 2
Failure to comply with the commissioner's order to file a cert of correction with the dob for notice of violation #34924773n issued on 1/16/12 pursuant 28-204.4 & 1rcny 102-01. rem:file a cert of correction.
May 23, 2012 · Penalty $800
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34924773n issued on 1/16/12. total obstruction of passageway leading to the street observed approx 40 bags of debris. passageway
Mar 7, 2012 · Penalty $800
Resolve - Class - 1
Failure to maintain unobstructed exit passageway. upon inspection exit passageway ( ) to front of building obstructed by accumalations of garage,( ),debris. remedy: remove obstruction.
Jan 16, 2012 · Penalty $400
Active - Class - 1
B101. installation of boiler w/o plans or permits on file w/the nyc dob.
Sep 14, 2011 · Penalty $8,000
Active - Class - 2
B254/16/34a/15/32a/34b
Feb 8, 2011
Resolve - Non-hazardous
Exit passageway or corridor:total obstruction rear exit to backyard blocked by furniture old & garbage & debris front & rear areaways blocked by garbage & debris.remedy:remove obstructions.
Mar 4, 2005
Resolve - Non-hazardous
Failure to maintain -defect is holes in fire rated celar ceiling at vavarious locations. remedy: repair defiective cellar ceiling as required.
Jan 5, 1994
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Water leak
Heavy flow
Oct 12, 2026 · Apt C3
Open - Appliance
Refrigerator
Aug 10, 2026 · Apt B1
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2026 · Apt BLDG
Close - Safety
Fire escape
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close
Show 40 more ↓
- Plumbing
Basin/sink
Mar 19, 2026 · Apt C3
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt D7
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt D2
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt D1
Close - Heat/hot water
Entire building
Nov 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt D2
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt D5
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt D5
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt D10
Close - Heat/hot water
Entire building
Oct 22, 2025 · Apt D10
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1929
- Floors
- 4
- Residential units
- 33
- Building area
- 36,000 ft²
- Lot area
- 10,417 ft²
- Zoning
- R5
- Community board
- 311
- Council district
- 38
- Block / lot
- 6225 / 36
- Assessed value
- $1,518,750
- Landmark / historic district
- No
HPD registration #333960, last renewed Aug 29, 2025.
Questions about 7511 New Utrecht Avenue
Who owns 7511 New Utrecht Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1655 76th Street LLC.
Does 7511 New Utrecht Avenue have violations?
Yes. NYC HPD has recorded 393 housing violations at this property.
Is 7511 New Utrecht Avenue rent stabilized?
NYC Department of Finance tax bills listed 33 rent-stabilized units here in 2024 (about 100% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 7511 New Utrecht Avenue built?
City records list 1929 as the year it was built.
How many apartments are in 7511 New Utrecht Avenue?
It has 33 residential units and 38 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.