8501 Ft Hamilton Parkway
Brooklyn, NY 11209BBL 3-06037-0006Map
Owner of record: 8501 Fort Hamilton Parkway Ltd
8501 Ft Hamilton Parkway is a walk-up apartment building built in 1927 in Brooklyn, 11209. It has 51 residential units across 4 floors. The owner of record is 8501 Fort Hamilton Parkway Ltd. HPD has recorded 1,387 housing violations here, most recently on October 15, 2026. 50 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2023.
- HPD violations
- 1,387
- DOB violations
- 36
- ECB violations
- 7
- HPD complaints
- 1,067
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,387
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Oct 15, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Oct 15, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective triple lever control valve at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from south at west
Oct 15, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance upper window sash at fire escape window in the 2nd room from east located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective door in the entrance located at apt 3k, 3rd story, section ''east''
Oct 15, 2026 · Apt 3K
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3k, 3rd story
Oct 15, 2026 · Apt 3K
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall, west wall in the 4th room from north located at apt 4f, 4th story, 1st apartment from east at south
Oct 15, 2026 · Apt 4F
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation riser in the bathroom located at apt 1c, 1st story, 1st apartment from south at west
Oct 15, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the 2nd room from north at west located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance upper and lower window sash in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective bathtub in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlet at east wall in the 4th room from north at east located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling fixture in the 4th room from north at east located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at east located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at east located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor covering in the kitchen located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3d, 3rd story, 2nd apartment from east at south , section ''west''
Oct 5, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective six wood joist at ceiling at north section at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at wasteline stack (b-riser) at north/west section at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at wasteline stack (d riser ) at west section at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at wasteline stack (n line) at south section at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at wasteline stack (j line) north/east section at basement
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at boiler room
Oct 5, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at boiler room
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and hinges , section ''east''
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling fixture in the 3rd room from east located at apt 2n, 2nd story, 1st apartment from north at east
Oct 5, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 2n, 2nd story, 1st apartment from north at east
Oct 5, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling fixture in the bathroom located at apt 2n, 2nd story, 1st apartment from north at east
Oct 5, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2n, 2nd story, 1st apartment from north at east
Oct 5, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2n, 2nd story, 1st apartment from north at east
Oct 5, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Oct 5, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Oct 5, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cement sub. floor in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Oct 5, 2026 · Apt 4B
Open — Nov sent out
DOB building violations · 36
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 26 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations · 7
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#35668529h as of 7/29/2026., file a certificate
Jul 29, 2026 · Penalty $1,280
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed large amounts of combustible materials under and around the fire escape in the court yard .causing a fire hazard and also bl
Jul 29, 2026 · Penalty $2,530
Active - Class - 2
Failure to maintain building in code-compliant manner.vio#39152267p , observied at court yard and exp#1 &exp#2 ac units still in windows at multiple locations without proper aproved brackets., repair and/or rep
May 8, 2026 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code-compliant manner. noted: there iswater damage to apartments 1-a and 2-n with additional damage to lobbyand basement ceilings. there is exposed rotting wood with ongoing conc
Aug 29, 2025 · Penalty $12,500
Active - Class - 1
Failure to maintain building wall(s) or appurtenances. noted: at the time of inspection observed at exposure #1 and court yard multiple air conditioners installed without brackets to properly secure them in win
Jun 28, 2025 · Penalty $25,000
Active - Class - 2
Rockmills mb-80 boiler=bottom rear of boiler leaking+gas piolit not hard pipe to regulator+bottom water column pipe to boiler corroded+body drain missing@safety valve+boiler room lights defective;correct violat
May 17, 2024 · Penalty $3,125
Active - Class - 1
Supervision or use of rigging equipment w/o a rigger's license. noted:no licensed rigger on site for suspended scaffold inside of courtyard at this location. remedy: comply w/code.
Oct 21, 2009
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt 3F
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt 4L
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt 1H
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Water leak
Slow leak
Oct 11, 2026 · Apt 4F
Close - Door/window
Door
Oct 11, 2026 · Apt 4L
Close
Show 40 more ↓
- Electric
No lighting
Oct 11, 2026 · Apt 4L
Close - Door/window
Door
Sep 30, 2026 · Apt 3K
Close - Plumbing
Bathtub/shower
Sep 26, 2026 · Apt 1C
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Sep 23, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BLDG
Close - Electric
No lighting
Sep 22, 2026 · Apt 4L
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2026 · Apt 4L
Close - Heat/hot water
Entire building
Sep 22, 2026 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 21, 2026 · Apt BLDG
Close - Electric
No lighting
Sep 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 2, 2026 · Apt BLDG
Close - Door/window
Door
Aug 31, 2026 · Apt 2H
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 1C
Close - Unsanitary condition
Sewage
Aug 25, 2026 · Apt 1C
Close - Plumbing
Basin/sink
Aug 25, 2026 · Apt 1C
Close - Appliance
Refrigerator
Aug 25, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 1C
Close - Appliance
Electric/gas range
Aug 25, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Aug 15, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 12, 2026 · Apt 110
Close - Unsanitary condition
Garbage/recycling storage
Aug 11, 2026 · Apt GARBAG
Close - Unsanitary condition
Garbage/recycling storage
Aug 11, 2026 · Apt BLDG
Close - Door/window
Door
Aug 10, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2026 · Apt BLDG
Close - Door/window
Window frame
Aug 10, 2026 · Apt 4B
Close - Electric
No lighting
Aug 10, 2026 · Apt 4B
Close - Electric
Outlet/switch
Aug 10, 2026 · Apt 4B
Close - Door/window
Door
Aug 10, 2026 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2026 · Apt 4L
Close - General
Signage missing
Aug 9, 2026 · Apt BLDG
Close - Electric
No lighting
Aug 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 9, 2026 · Apt BLDG
Close - Safety
Window guard broken/missing
Aug 9, 2026 · Apt BLDG
Close - Door/window
Door
Aug 9, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 51
- Building area
- 43,000 ft²
- Lot area
- 18,150 ft²
- Zoning
- R4-1
- Community board
- 310
- Council district
- 47
- Block / lot
- 6037 / 6
- Assessed value
- $1,929,600
- Landmark / historic district
- No
HPD registration #303815, last renewed Feb 19, 2026.
Questions about 8501 Ft Hamilton Parkway
Who owns 8501 Ft Hamilton Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 8501 Fort Hamilton Parkway Ltd.
Does 8501 Ft Hamilton Parkway have violations?
Yes. NYC HPD has recorded 1,387 housing violations at this property.
Is 8501 Ft Hamilton Parkway rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2023 (about 98% of its 51 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 8501 Ft Hamilton Parkway built?
City records list 1927 as the year it was built.
How many apartments are in 8501 Ft Hamilton Parkway?
It has 51 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.