555 80 Street
Brooklyn, NY 11209BBL 3-05981-0058Map
Owner of record: 555 80th Street LLC
555 80 Street is a walk-up apartment building built in 1931 in Brooklyn, 11209. It has 6 residential units across 3 floors. The owner of record is 555 80th Street LLC. HPD has recorded 144 housing violations here, most recently on July 22, 2026. 21 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 144
- DOB violations
- 17
- ECB violations
- 3
- HPD complaints
- 165
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 144
- BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 22, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of flower pots and metal radiator enclosure at the intermediate landing, at public hall stairs, 3rd story
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 22, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of baby carriage and household items at public hall, 1st story
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cement floor at the lower landing at vestibule , 1st story
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of households articles parcals at public hall, 3rd story
Mar 16, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of shoes with wood stands, at public hall, 2nd story
Mar 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs at the east entrance to inner court , at public hall, 1st story
Mar 16, 2026
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 16, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of flower pots and household articles at the ntermediate landing, at public hall stairs, 3rd story
Mar 16, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing , latchset assembly taped and obstructed front entrance door to building, , 1st story
Mar 16, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at vestibule. at public hall, 1st story
Mar 12, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 12, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set]at building front entrance, , 1st story
Sep 23, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at vestibule , 1st story
Aug 9, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at vestibule , 1st story
Aug 9, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Aug 9, 2024
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following one or more lights with an aggregate of not less than 100 watts incandescent or equivalent , 1st story
Aug 9, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 29, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 29, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of wood furniture and baby carriage at public hall stairs, 1st story
Apr 29, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Open — Defect letter issued - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective counterbalances at upper sash window 1st from east at south , in the 3rd room from north at east located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass [interior side]at lower sash window 2nd from east at south, in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective counterbalances at upper sash window 1st from east at south, in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower sash wood winow 2nd from west at north , in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective broken and detached wood upper sash window 2nd from west at north , in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from east at south
Apr 29, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set assembly at the vestibule door ] at public hall, 1st story
Apr 29, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Apr 15, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Apr 15, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window counter balance upper sash 1st window at north in the 3rd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Apr 15, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window counter balance upper sash 2nd window at north in the 3rd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Apr 15, 2024 · Apt 2F
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to building at public hall, 1st story
Nov 23, 2023
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Nov 20, 2023 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from east at south
Nov 20, 2023 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Nov 20, 2023 · Apt 2F
Closed — Violation closed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
Show 7 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 3
- Class - 2
B265 as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
Mar 3, 2017 · Penalty $2,500
Active - Class - 1
B154,3. do not operate boiler and water heater until all hazardous conditionsare immediately corrected and notify dob for reinspection and to lift cease use call 212-393-2784. as per class 1 (b154) 28-301.1-
Mar 3, 2017 · Penalty $5,000
Active - Class - 2
As per class 2 (b201) 28-105-1 acquire permit for boiler peerless 64- 07 st dg w/s serial #608189-2008 10 input 345 000 btu submit a certi ficate of correction.
Mar 3, 2017 · Penalty $4,000
Active
Complaints
- Appliance
Refrigerator
Jul 3, 2026 · Apt 3F
Close - Appliance
Refrigerator
Jun 24, 2026 · Apt 3F
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 14, 2025 · Apt 2F
Close - Plumbing
Radiator
Dec 23, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 29, 2024 · Apt 2F
Close
Show 40 more ↓
- Door/window
Door
Sep 17, 2024 · Apt PH
Close - Outside building
Roof door/hatch
Sep 17, 2024 · Apt PH
Close - Electric
No lighting
Aug 14, 2024 · Apt 2F2FLO
Close - Electric
No lighting
Jul 30, 2024 · Apt 2F
Close - Door/window
Window pane
Jul 26, 2024 · Apt 2F
Close - Door/window
Window frame
Apr 18, 2024 · Apt 2F
Close - Door/window
Window frame
Apr 9, 2024 · Apt 2F
Close - Plumbing
Basin/sink
Nov 21, 2023 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 2R
Close - Electric
Wiring
Nov 21, 2023 · Apt 2R
Close - Electric
Lighting
Nov 21, 2023 · Apt 2R
Close - Water leak
Damp spot
Nov 21, 2023 · Apt 2R
Close - Plumbing
Toilet
Nov 21, 2023 · Apt 2R
Close - Unsanitary condition
Mold
Nov 21, 2023 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 18, 2023 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Nov 15, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 13, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Nov 10, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Nov 7, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 10, 2019 · Apt 2F
Close - Heat/hot water
Entire building
Jan 14, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2017 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2015 · Apt BLDG
Close - Door/window
Door
Aug 25, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 20, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 20, 2015 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,760 ft²
- Lot area
- 2,442 ft²
- Zoning
- R4-1
- Community board
- 310
- Council district
- 47
- Block / lot
- 5981 / 58
- Assessed value
- $592,650
- Landmark / historic district
- No
HPD registration #348835, last renewed Sep 13, 2025.
Questions about 555 80 Street
Who owns 555 80 Street?
The owner of record in NYC Department of City Planning PLUTO data is 555 80th Street LLC.
Does 555 80 Street have violations?
Yes. NYC HPD has recorded 144 housing violations at this property.
Is 555 80 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 555 80 Street built?
City records list 1931 as the year it was built.
How many apartments are in 555 80 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.