353 Bay Ridge Parkway
Brooklyn, NY 11209BBL 3-05929-0054Map
Owner of record: Epsilon 353 2f LLC
353 Bay Ridge Parkway is an elevator apartment building built in 1961 in Brooklyn, 11209. It has 41 residential units across 6 floors. The owner of record is Epsilon 353 2f LLC. HPD has recorded 24 housing violations here, most recently on November 28, 2025. 2 of the 24 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 24
- DOB violations
- 30
- ECB violations
- 15
- HPD complaints
- 58
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (less than 10 sq ft) in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and north wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at basement
Nov 28, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at basement
Nov 28, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling, north and east walls in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and east wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at basement
Nov 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5g, 5th story, 2nd apartment from east at south
Nov 15, 2025 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at 1st story at boiler room, 1st story
Nov 15, 2025
Closed — Violation dismissed
Show 14 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5g, 5th story, 2nd apartment from east at south
Nov 15, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base board heat cover at south in the 1st room from north at east located at apt 5g, 5th story, 2nd apartment from east at south
Nov 15, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at upper sash window in the 1st room from north at east located at apt 5g, 5th story, 2nd apartment from east at south
Nov 15, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color celling and all walls in the bathroom located at apt 5g, 5th story, 2nd apartment from east at south
Nov 15, 2025 · Apt 5G
Closed — Violation dismissed - BHazardous
Replace with new the missing light fixture vestibule ceiling at public hall, 1st story
May 30, 2023
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlets at west wall at public hall, 1st story
May 30, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 15, 2018
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety caps for electrical outlets at west wall at public hall, 1st story
Sep 4, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 4, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 4, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 4, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain at bathtub in the bathroom located at apt 5f, 5th story, 1st apartment from south at west
Jun 5, 2018 · Apt 5F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5f, 5th story, 1st apartment from south at west
Jun 5, 2018 · Apt 5F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5f, 5th story, 1st apartment from south at west
Jun 5, 2018 · Apt 5F
Closed — Violation dismissed
DOB building violations · 30
- Construction other optional
Partial vacate order-as observed by facade inspector on 08/09/2022 there is a loose coping stone and mortar joints at top of chimney at exp4 east courtyard. due to these conditions exp4 east courtyard is to be vacated and only to be used as emergency egress. remedy: vacate exp4 east courtyard
Aug 9, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 1, 2015
Dob violation - resolved
Show 20 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2003
Dob violation - resolved - Elevator elevatorrequired
3p5646
May 31, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 15
- Class - 2
Failure to conduct or file a final inspection of permitted work with the department. noted: job #b07993962-i1-sf issuance date: 4/28/2023 expiration date: 12/9/2023., conduct/file final inspection
Jul 31, 2025 · Penalty $6,250
Active - Class - 3
Swo issued 08-15-22 for work in the lobby without permits, ati i observed that the work materials 20 boards of sheet rock two bakers & two ladders also metal studs remain in the front lobby approx. 6ft in front
Mar 16, 2023 · Penalty $250
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operations.note:at time of inspection observed job started under aforementioned job number contractor left construction material & constructio
Jan 9, 2023 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#910076.remedy:submit acceptable require
Dec 9, 2022 · Penalty $1,250
Resolve - Class - 1
Work without permit. at time of my inspection observed 2 workers on construction activities at public hall 1st floor( lobby) without dob permit regard demolition, framing & heavy electrical work, creating hazar
Aug 12, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain exterior bldg facade&appurtenances.note:observed@exp4e courtyd loose coping stone&loose mortar joints@top of chimney.
Aug 9, 2022
Resolve - Class - 1
3314.6.3 lifelines and suspension ropes.at the time of inspection at an active jobsite,observed workers performing works on suspended scaffold at exp3 and all lifting tiebacks and suspension ropes were attached
Dec 14, 2021 · Penalty $2,500
Resolve - Class - 1
3314.4.4.2l3 enginerring report of parapet wall.at the time of inspection at an active jobsite,observed workers performing works on suspended scaffold at exp3.upon request to review the engineering report for t
Dec 14, 2021 · Penalty $2,500
Resolve - Class - 1
3314.4.3 inspecting.at the time of inspection at an active jobsite,observed workers performing works on suspended scaffold at exp3.upon request to review installation inspection reports for suspended scaffold,n
Dec 14, 2021 · Penalty $2,500
Resolve - Class - 1
Cease use items: 1) inoperative zone lock restrictor 2) inoperative door lock/door positioning monitor as required by code at time of installation of controller. adjust parameter or file ebn to install chip if
Apr 25, 2019 · Penalty $1,250
Resolve
Show 5 more ↓
- Class - 1
Cease use item01-l-10/01-h-11,02-l-10/-23-b-10/67-m-07/08-v-01/17-h-11/14-j-01/69-b-11,56-y-13,59-y-02.100-p-07,70-p-07,72-p-07,40-m-07,100-m-07,43-x-10,42-n-09,42-g-11,41-t-07,41-w-06,16-h-11,10-m-07,70-o-02/
Jan 11, 2011 · Penalty $1,000
Resolve - Class - 2
100x10,02x10,16i11,23b10,24x10 100x-car not oing to 6th fl,16i-5th fl door release roller 23b-hall cals not working properly 24x-direction indicates most fls
Nov 12, 2010
Resolve - Class - 3
01l10.032l10.01h11.08v01.17h11.68m07.41b07.52h11.77x10. 01,02l muted bell 01h install new stop sw. 08vadjust fl stops 17h replace bsmt gibs68m provide maintenance log 41b provide motor rm sign 52h replace gov
Jul 18, 2008 · Penalty $200
Resolve - Non-hazardous
41h11.39o02.55o02.66o02.71n07.85bb05.86m05. 41h11 replace as needed any worn contact 58y11 replace oily brake 71m07 splice box cover missing 85bb05 5yr expired 10/2001 86m05 2yr tag missing
Apr 5, 2008
Resolve - Non-hazardous
35p7
Feb 28, 1996 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 1A
Close - Water leak
Slow leak
Feb 8, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 6E
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 1A
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Jan 29, 2026 · Apt 1A
Close - Electric
Lighting
Jan 29, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 1F
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt GROUND
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Water leak
Damp spot
Nov 19, 2025 · Apt 2C
Close - Unsanitary condition
Mold
Nov 19, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 5G
Close - Heat/hot water
Entire building
Jan 3, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 1F
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Electric
No lighting
Jan 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 16, 2022 · Apt BLDG
Close - Plumbing
Water supply
May 14, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2022 · Apt BLDG
Close - Plumbing
Water supply
Apr 4, 2022 · Apt 5A
Close - Plumbing
Water supply
Apr 4, 2022 · Apt 5E
Close - Plumbing
Water supply
Apr 4, 2022 · Apt 5E
Close - Heat/hot water
Entire building
Apr 2, 2022 · Apt BLDG
Close - Plumbing
Water supply
Apr 2, 2022 · Apt BLDG
Close - Plumbing
Water supply
Apr 2, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 5, 2018 · Apt 5F
Close - Unsanitary condition
Mold
Jun 5, 2018 · Apt 5F
Close - Water leak
Slow leak
Jun 5, 2018 · Apt 5F
Close - Unsanitary condition
Pests
Jun 4, 2018 · Apt 5F
Close - Water leak
Slow leak
Jun 4, 2018 · Apt 5F
Close - Unsanitary condition
Mold
Jun 4, 2018 · Apt 5F
Close - Paint/plaster
Ceiling
Mar 8, 2014 · Apt 4E
Close - Paint/plaster
Ceiling
Mar 8, 2014 · Apt 4E
Close - General
Windows
Oct 4, 2010 · Apt 6E
Close - General
Doors
Oct 4, 2010 · Apt 6E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1961
- Floors
- 6
- Residential units
- 41
- Building area
- 30,000 ft²
- Lot area
- 7,500 ft²
- Zoning
- R5B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5929 / 54
- Assessed value
- $1,434,600
- Landmark / historic district
- No
HPD registration #372561, last renewed Jul 23, 2026.
Questions about 353 Bay Ridge Parkway
Who owns 353 Bay Ridge Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Epsilon 353 2f LLC.
Does 353 Bay Ridge Parkway have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 353 Bay Ridge Parkway rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 100% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 353 Bay Ridge Parkway built?
City records list 1961 as the year it was built.
How many apartments are in 353 Bay Ridge Parkway?
It has 41 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.