6821 6 Avenue
Brooklyn, NY 11220BBL 3-05866-0002Map
Owner of record: 6821 6th Ave Realty LLC
6821 6 Avenue is a walk-up apartment building built in 1928 in Brooklyn, 11220. It has 6 residential units across 3 floors. The owner of record is 6821 6th Ave Realty LLC. HPD has recorded 138 housing violations here, most recently on October 6, 2025. 18 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 138
- DOB violations
- 5
- ECB violations
- 1
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 138
- ANon-hazardous
Paint metal in accordance with dept. regulation steam riser at north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Oct 6, 2025 · Apt 3R
Open — Nov sent out - BHazardous
Replace with new the missing handle at exterior door at bulkhead to the roof at public hall
Sep 29, 2025
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of cable wire at goose neck at roof creating a trip hazard
Sep 29, 2025
Open — Nov sent out - BHazardous
§ 65 m/d law provide under completed permit, a proper enclosure for the central heating plant, at boiler room at cellar
Sep 29, 2025
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at shower stall,watercloset,wash basin and kitchen sink at cellar
Sep 29, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at bulkhead , 4th story
Sep 10, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. at bulkhead , 4th story
Sep 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Sep 10, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Sep 10, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at bulkhead , 4th story
Sep 10, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame , 1st story
Jun 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge court
Jun 26, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Oct 8, 2023 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance at public hall, 1st story
Oct 8, 2023
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 15 sq.ft at north wall at public hall, 3rd story
Oct 8, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead at public hall, 3rd story
Oct 8, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Oct 8, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Oct 8, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 15 sq.ft at north wall at public hall, 3rd story original violation 16295394 issued 08-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 8, 2023
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall at public hall, 3rd story
Oct 8, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 8, 2023
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 8, 2023
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building front entrance
Mar 24, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west and south walls at vestibule at public hall, 1st story
Mar 24, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Open — Defect letter issued - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 24, 2023
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west and south walls at vestibule at public hall, 1st story
Mar 24, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north and west walls at bulkhead at public hall, 3rd story
Mar 24, 2023
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Mar 24, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 24, 2023
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household articles at 3rd story balcony at 1st stack from north at west at building front at fire escape
Mar 24, 2023
Closed — Violation closed - BHazardous
Replace the broken or defective watercloset in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaz at bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees fahrenheit in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Mar 24, 2023 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north and west walls at bulkhead at public hall, 3rd story
Mar 24, 2023
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance lower sash east 2 window in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 4; wg to repair = 0; in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, east wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from north at east
Jun 4, 2021 · Apt 1R
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north
Oct 23, 2015 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall aprox 20 sq ft in the 1st room from north located at apt 3f, 3rd story, 1st apartment from west at north
Oct 23, 2015 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling aprox 20 sq ft in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north
Oct 23, 2015 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective door in the entrance located at apt 3f, 3rd story, 1st apartment from west at north
Oct 23, 2015 · Apt 3F
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active
ECB violations · 1
- Class - 2
Work w/o a permit.noted at cellar level erected full height partition creating rooms installed water and waste lines for 4pc bathroom 2 toi lets,sink,shower) and residential sink.rmdy:obtain permits.
Aug 6, 2015
Resolve
Complaints
- General
Signage missing
Sep 10, 2025 · Apt BLDG
Close - Outside building
Roofing
Sep 10, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 10, 2025 · Apt BLDG
Close - Door/window
Door
Jun 25, 2024 · Apt BLDG
Close - Door/window
Door
Jun 25, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jun 24, 2024 · Apt 1F
Close - Safety
Carbon monoxide detector
Jun 24, 2024 · Apt 1R
Close - Safety
Smoke detector
Jun 24, 2024 · Apt 1R
Close - Door/window
Door
Jun 24, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Jun 24, 2024 · Apt 1R
Close
Show 40 more ↓
- Safety
Fire escape
Jun 24, 2024 · Apt 1R
Close - Plumbing
Water supply
Jun 24, 2024 · Apt 1F
Close - Door/window
Door
Jun 24, 2024 · Apt 1F
Close - Door/window
Door
Jun 24, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Oct 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 8, 2023 · Apt BLDG
Close - Plumbing
Steam pipe/riser
Mar 23, 2023 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 3, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Jun 1, 2021 · Apt 1A
Close - Plumbing
Radiator
Jun 1, 2021 · Apt 1A
Close - Door/window
Window frame
Jun 1, 2021 · Apt 1A
Close - Plumbing
Radiator
Jun 1, 2021 · Apt 1A
Close - Door/window
Window frame
Jun 1, 2021 · Apt 1A
Close - Flooring/stairs
Floor
Jun 1, 2021 · Apt 1A
Close - Unsanitary condition
Pests
Jun 1, 2021 · Apt 1A
Close - Appliance
Electric/gas range
Dec 21, 2015 · Apt 3F
Close - Appliance
Refrigerator
Dec 21, 2015 · Apt 3F
Close - Door/window
Door
Oct 14, 2015 · Apt 3F
Close - Door/window
Door
Oct 14, 2015 · Apt 3F
Close - Safety
Carbon monoxide detector
Oct 14, 2015 · Apt 3F
Close - Safety
Smoke detector
Oct 14, 2015 · Apt 3F
Close - Unsanitary condition
Mold
Oct 14, 2015 · Apt 3F
Close - Unsanitary condition
Mold
Oct 14, 2015 · Apt 3F
Close - Water leak
Heavy flow
Oct 14, 2015 · Apt 3F
Close - Door/window
Door frame
Oct 14, 2015 · Apt 3F
Close - Appliance
Refrigerator
Oct 14, 2015 · Apt 3F
Close - Door/window
Door
Oct 14, 2015 · Apt 3F
Close - Door/window
Door
Sep 16, 2015 · Apt 3F
Close - Door/window
Door
Sep 16, 2015 · Apt 3F
Close - Unsanitary condition
Mold
Sep 10, 2015 · Apt 3F
Close - Unsanitary condition
Mold
Sep 10, 2015 · Apt 3F
Close - Electric
Wiring
Sep 10, 2015 · Apt 3F
Close - Unsanitary condition
Pests
Sep 10, 2015 · Apt 3F
Close - Heat/hot water
Entire building
Apr 26, 2015 · Apt 3R
Close - Heat/hot water
Entire building
Apr 25, 2015 · Apt 3R
Close - Plumbing
Water supply
Apr 25, 2015 · Apt 3R
Close - Heat/hot water
Entire building
Apr 25, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2015 · Apt 3R
Close - Plumbing
Bathtub/shower
Mar 27, 2015 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 6
- Building area
- 5,100 ft²
- Lot area
- 2,112 ft²
- Zoning
- R4-1
- Community board
- 310
- Council district
- 47
- Block / lot
- 5866 / 2
- Assessed value
- $561,600
- Landmark / historic district
- No
HPD registration #312838, last renewed Aug 23, 2025.
Questions about 6821 6 Avenue
Who owns 6821 6 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 6821 6th Ave Realty LLC.
Does 6821 6 Avenue have violations?
Yes. NYC HPD has recorded 138 housing violations at this property.
Is 6821 6 Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 6821 6 Avenue built?
City records list 1928 as the year it was built.
How many apartments are in 6821 6 Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.