1312 68 Street
Brooklyn, NY 11219BBL 3-05775-0006Map
Owner of record: 1312 Ovington LLC
1312 68 Street is a walk-up apartment building built in 1931 in Brooklyn, 11219. It has 13 residential units across 3 floors. The owner of record is 1312 Ovington LLC. HPD has recorded 308 housing violations here, most recently on August 30, 2026. 30 of the 50 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 308
- DOB violations
- 7
- ECB violations
- 4
- HPD complaints
- 212
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 308
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o sqft observed at ceiling in the bathroom located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Civ14 mailed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt b7, 2nd story, 1st apartment from east at south
Aug 30, 2026 · Apt B7
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall, in the 2nd room from east at north located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs, in the entrance located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall, in the foyer located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of rotten wood panel at north wall, in the foyer located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, in the kitchen located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall, in the bathroom located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective grouts joints and ceramic tiles at south wall, in the bathroom located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking grouts joints of the ceramic tiles at east, south and west walls around bathtub, in the bathroom located at apt c11, 3rd story, 1st apartment from north at east
Aug 13, 2026 · Apt C11
Open — Civ14 mailed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 4th room from east located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at south located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less t than 10 sq.ft east wall in the bathroom located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt c9, 3rd story, 1st apartment from west at north
Jan 9, 2025 · Apt C9
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less t than 10 sq.ft east wall in the bathroom located at apt c9, 3rd story, 1st apartment from west at north original violation 17608917 issued 09-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 9, 2025 · Apt C9
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt c9, 3rd story, 1st apartment from west at north original violation 17608916 issued 09-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 9, 2025 · Apt C9
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt c11, 3rd story, 1st apartment from north at east
Aug 31, 2024 · Apt C11
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt c11, 3rd story, 1st apartment from north at east
Aug 31, 2024 · Apt C11
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... more than 65 sqft of mold at closet ceiling and all walls in the foyer located at apt c11, 3rd story, 1st apartment from north at east
Aug 31, 2024 · Apt C11
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east at north located at apt b5, 2nd story, 2nd apartment from west at north
Jul 31, 2024 · Apt B5
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door in the entrance located at apt b5, 2nd story, 2nd apartment from west at north
Jul 31, 2024 · Apt B5
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east at south located at apt b5, 2nd story, 2nd apartment from west at north
Jul 31, 2024 · Apt B5
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at hinges in the entrance located at apt b5, 2nd story, 2nd apartment from west at north
Jul 31, 2024 · Apt B5
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at apt c9, 3rd story, 2nd apartment from west at north
Jul 28, 2024 · Apt C9
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 28, 2024 · Apt C9
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at west wall, south wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood sub-floor in the kitchen located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 1 sq.ft. east wall in the bathroom located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at 2nd window frame from west at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at 1st window frame from west at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 2nd window frame from west at north wall in the 4th room from east located at apt c9, 3rd story, 2nd apartment from west at north
Jul 9, 2024 · Apt C9
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood tread, 6th from bottom at south at fire passage way
Jun 3, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items 3rd story balcony east side of building at fire escape, 3rd story
Jun 1, 2024
Closed — Violation closed
DOB building violations · 7
- Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 4
- Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $6,250
Active - Class - 2
Failure to maintain building exterior wall: defect noted: at exposure#1 crack in stone window sills below 3rd story windows.1 crack in masonary decorative stone at parapet wall & below 3rd story window,cracking
Dec 9, 2011 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg wall or appurtenances. noted: at front facade(exp 1) there are missing pointings at brick work, some hairline crackopen(ed) up and due to that rain water leaking and entering into apt
Nov 23, 2011 · Penalty $250
Resolve - Class - 1
Failure to maintain unobstructed exit passageway.@ time of inspec.observed various household items tored on public fire escape @ rear east end of premises.remedy:make site safe.maintain clear unobstructed passa
Nov 22, 2011
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 17, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 8, 2026 · Apt C11
Close - Water leak
Heavy flow
Aug 7, 2026 · Apt B7
Close - Door/window
Door
Aug 7, 2026 · Apt B7
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt B7
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt B7
Close - Safety
Fire escape
Apr 2, 2026 · Apt BUILD
Close - Unsanitary condition
Mold
Apr 2, 2026 · Apt C9
Close - Door/window
Window frame
Apr 2, 2026 · Apt C9
Close - Unsanitary condition
Mold
Apr 2, 2026 · Apt C9
Close
Show 40 more ↓
- Plumbing
Water supply
Apr 2, 2026 · Apt C9
Close - Plumbing
Bathtub/shower
Apr 2, 2026 · Apt C9
Close - Paint/plaster
Wall
Apr 2, 2026 · Apt C9
Close - Safety
Carbon monoxide detector
Apr 2, 2026 · Apt C9
Close - Safety
Smoke detector
Apr 2, 2026 · Apt C9
Close - Paint/plaster
Radiator
Apr 2, 2026 · Apt C9
Close - Electric
Outlet/switch
Apr 2, 2026 · Apt C9
Close - Door/window
Door
Apr 2, 2026 · Apt C11
Close - Appliance
Refrigerator
Feb 9, 2026 · Apt C11
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt C9
Close - Unsanitary condition
Mold
Feb 9, 2026 · Apt C9
Close - Paint/plaster
Window/frame
Jan 5, 2025 · Apt C9
Close - Paint/plaster
Ceiling
Jan 5, 2025 · Apt C9
Close - Paint/plaster
Ceiling
Jan 5, 2025 · Apt C9
Close - Unsanitary condition
Mold
Jan 5, 2025 · Apt C9
Close - Water leak
Heavy flow
Nov 21, 2024 · Apt C11
Close - Appliance
Electric/gas range
Nov 21, 2024 · Apt C11
Close - Unsanitary condition
Mold
Aug 19, 2024 · Apt C11
Close - Water leak
Heavy flow
Aug 19, 2024 · Apt C11
Close - Paint/plaster
Wall
Jul 3, 2024 · Apt C9
Close - Flooring/stairs
Floor
Jul 3, 2024 · Apt C9
Close - Unsanitary condition
Mold
Jul 3, 2024 · Apt C9
Close - Water leak
Slow leak
Jul 3, 2024 · Apt C9
Close - Paint/plaster
Radiator
May 31, 2024 · Apt C9
Close - Door/window
Door
May 31, 2024 · Apt B7
Close - Paint/plaster
Ceiling
May 31, 2024 · Apt C9
Close - Paint/plaster
Wall
May 31, 2024 · Apt C9
Close - Paint/plaster
Wall
May 31, 2024 · Apt C9
Close - Safety
Fire escape
May 31, 2024 · Apt C9
Close - Safety
Fire escape
May 31, 2024 · Apt A1
Close - Safety
Window guard broken/missing
May 31, 2024 · Apt C12
Close - Door/window
Door
May 31, 2024 · Apt C12
Close - Safety
Carbon monoxide detector
May 31, 2024 · Apt C11
Close - Safety
Smoke detector
May 31, 2024 · Apt C11
Close - Door/window
Door
May 31, 2024 · Apt C11
Close - Safety
Fire escape
May 31, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
May 31, 2024 · Apt A1
Close - Safety
Smoke detector
May 31, 2024 · Apt A1
Close - Safety
Carbon monoxide detector
May 31, 2024 · Apt A1
Close - Water leak
Damp spot
Apr 24, 2024 · Apt C9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 3
- Residential units
- 13
- Building area
- 7,358 ft²
- Lot area
- 3,667 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 43
- Block / lot
- 5775 / 6
- Assessed value
- $330,750
- Landmark / historic district
- No
HPD registration #301621, last renewed Aug 31, 2025.
Questions about 1312 68 Street
Who owns 1312 68 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1312 Ovington LLC.
Does 1312 68 Street have violations?
Yes. NYC HPD has recorded 308 housing violations at this property.
Is 1312 68 Street rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 100% of its 13 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1312 68 Street built?
City records list 1931 as the year it was built.
How many apartments are in 1312 68 Street?
It has 13 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.