6825 13 Avenue
Brooklyn, NY 11219BBL 3-05775-0001Map
Owner of record: Peloro, Maria
6825 13 Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11219. It has 16 residential units across 4 floors. The owner of record is Peloro, Maria. HPD has recorded 203 housing violations here, most recently on May 7, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 203
- DOB violations
- 29
- ECB violations
- 1
- HPD complaints
- 270
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 203
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material and house hold itemes at public hall, 4th story
Apr 19, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at public hall, 4th story
Apr 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 4th story
Apr 19, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at floor in the kitchen located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Refit lower and upper window sash at north in the 2nd room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the throughout all landing and stairs at public hall stairs
Apr 19, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash window counter balance at east in the 1st room from north located at apt 5d, 4th story, 1st apartment from east at south
Apr 19, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 1d, 4th story, 2nd apartment from south at west
Aug 24, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 1d, 4th story, 2nd apartment from south at west
Aug 24, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1d, 4th story, 2nd apartment from south at west
Aug 24, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall and ceiling at public hall, 4th story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall and ceiling at public hall, 4th story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall at public hall, 4th story
Aug 24, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Aug 24, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 3rd story
Aug 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 3rd story
Aug 24, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall at public hall, 4th story original violation 18182703 issued 24-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 24, 2025
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Nov 4, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Nov 4, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Nov 4, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at 1st public hall bulkhead from north at west, 4th story
Nov 4, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock, and assembly on the building entrance door at public hall, 1st story
Nov 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, and the ceiling at the vestibule at public hall, 1st story
Nov 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the south wall ,and the ceiling at vestibule at public hall, 1st story
Nov 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story
Nov 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 4th story
Nov 4, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 1st public hall bulkhead from north at west, 4th story
Nov 4, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at 1st public hall bulkhead from north at west, 4th story
Nov 4, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 7, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at entrance door at public hall, 1st story
Aug 7, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 3rd story north stack at building front at fire escape
Aug 7, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at north stack 3rd story at fire escape
Aug 7, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioners protruding beyond window sill at 4th story north and south stack at building front at fire escape
Aug 7, 2023
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 20 sq ft at north wall at public hall stairs, 3rd story original violation 15987633 issued 17-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 17, 2023
Open — Defect letter issued
DOB building violations · 29
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active
Show 19 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 19, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 19, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 19, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 1
- Non-hazardous
Failure to maintain building . defect is unused shaft in bublie hall- way at 1st,2nd & 3rd floors are not sealed & closed off as building department requirements at time of inspection 1st & 2nd floor shaft door
Dec 17, 1999 · Penalty $350
Active
Complaints
- Water leak
Slow leak
Apr 6, 2026 · Apt 5D
Close - Door/window
Window frame
Apr 6, 2026 · Apt 5D
Close - Outside building
Roofing
Apr 6, 2026 · Apt 5D
Close - Water leak
Slow leak
Feb 16, 2026 · Apt 5D
Close - Unsanitary condition
Pests
Dec 23, 2025 · Apt 2D
Close - Unsanitary condition
Pests
Dec 23, 2025 · Apt 2D
Close - Paint/plaster
Wall
Aug 17, 2025 · Apt 1D
Close - Plumbing
Water supply
Feb 22, 2025 · Apt FIRSTF
Close - Plumbing
Water supply
Feb 22, 2025 · Apt 4D
Close - Plumbing
Water supply
Dec 12, 2024 · Apt 1STFLO
Close
Show 40 more ↓
- Paint/plaster
Window/frame
Nov 3, 2024 · Apt 1D
Close - Door/window
Window frame
Nov 3, 2024 · Apt 1D
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt 1D
Close - Paint/plaster
Ceiling
Aug 4, 2023 · Apt GROUND
Close - Door/window
Window frame
Aug 4, 2023 · Apt GROUND
Close - Paint/plaster
Ceiling
Aug 4, 2023 · Apt GROUND
Close - Water leak
Damp spot
Aug 4, 2023 · Apt GROUND
Close - Paint/plaster
Wall
Jan 31, 2023 · Apt 1D
Close - General
Bell/buzzer/intercom
Jan 31, 2023 · Apt 1D
Close - Unsanitary condition
Pests
Jan 31, 2023 · Apt 1D
Close - Door/window
Window frame
Jan 31, 2023 · Apt 1D
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt GROUND
Close - Door/window
Door
Dec 21, 2022 · Apt GROUND
Close - Water leak
Damp spot
Dec 21, 2022 · Apt GROUND
Close - Water leak
Slow leak
Dec 21, 2022 · Apt GROUND
Close - Unsanitary condition
Garbage/recycling storage
Dec 2, 2022 · Apt 5D
Close - Unsanitary condition
Pests
May 24, 2022 · Apt GROUND
Close - Electric
Wiring
May 24, 2022 · Apt GROUND
Close - Unsanitary condition
Pests
May 24, 2022 · Apt GROUND
Close - Paint/plaster
Ceiling
May 24, 2022 · Apt GROUND
Close - Water leak
Damp spot
May 3, 2022 · Apt GROUND
Close - Electric
Lighting
Apr 28, 2022 · Apt GOUNDF
Close - Water leak
Heavy flow
Apr 28, 2022 · Apt GOUNDF
Close - Door/window
Window frame
Apr 16, 2022 · Apt GROUND
Close - Water leak
Slow leak
Apr 16, 2022 · Apt GROUND
Close - Paint/plaster
Ceiling
Apr 15, 2022 · Apt GROUND
Close - Door/window
Window frame
Aug 23, 2021 · Apt 1
Close - Water leak
Slow leak
Aug 23, 2021 · Apt 1
Close - Electric
Wiring
Mar 25, 2021 · Apt 4D
Close - Plumbing
Water supply
Mar 25, 2021 · Apt 4D
Close - Paint/plaster
Wall
Aug 1, 2020 · Apt GROUND
Close - Water leak
Heavy flow
Aug 1, 2020 · Apt GROUND
Close - Paint/plaster
Ceiling
Jul 11, 2020 · Apt 5D
Close - Electric
Power outage
Jul 20, 2019 · Apt BLDG
Close - Plumbing
Water supply
Jul 12, 2019 · Apt 3D
Close - Heat/hot water
Entire building
May 15, 2018 · Apt 4C
Close - Heat/hot water
Apartment only
May 10, 2018 · Apt 4C
Close - Heat/hot water
Entire building
Nov 9, 2017 · Apt 1C
Close - Door/window
Window frame
Oct 3, 2016 · Apt 3D
Close - Door/window
Window frame
Oct 3, 2016 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1931
- Floors
- 4
- Residential units
- 16
- Building area
- 14,800 ft²
- Lot area
- 4,000 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 43
- Block / lot
- 5775 / 1
- Assessed value
- $1,226,250
- Landmark / historic district
- No
HPD registration #310605, last renewed Aug 7, 2025.
Questions about 6825 13 Avenue
Who owns 6825 13 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Peloro, Maria.
Does 6825 13 Avenue have violations?
Yes. NYC HPD has recorded 203 housing violations at this property.
Is 6825 13 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 6825 13 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 6825 13 Avenue?
It has 16 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.