6204 Ft Hamilton Parkway
Brooklyn, NY 11219BBL 3-05729-0030Map
Owner of record: Lidia Malaki LLC
6204 Ft Hamilton Parkway is a walk-up apartment building built in 1926 in Brooklyn, 11219. It has 46 residential units across 4 floors. The owner of record is Lidia Malaki LLC. HPD has recorded 263 housing violations here, most recently on September 18, 2026. 15 of the 50 most recent violations are still open. City tax records listed 46 rent-stabilized apartments here in 2024.
- HPD violations
- 263
- DOB violations
- 5
- ECB violations
- 5
- HPD complaints
- 354
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 263
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 18, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 18, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Apr 13, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door at west leading to garbage and boiler room area at public hall, 1st story
Apr 13, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and baby strollers at public hall, 1st story
Apr 13, 2026
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods consisting of drop ladder at down position at 2nd fire escape from south at building east yard
Apr 13, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator doors intact at public hall, 1st story
Apr 13, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hasp with eye capable of being padlocked gate at east yard
Apr 13, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of 2 cars and 2 motorcycles parked and preventing the people from exiting the building in case of fire at east yard
Apr 13, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c7, 3rd story, 1st apartment from east at south
Feb 19, 2026 · Apt C7
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d9, 4th story, 1st apartment from south at west
Feb 19, 2026 · Apt D9
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d6, 4th story, 1st apartment from north at east
Feb 19, 2026 · Apt D6
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b12, 2nd story, 3rd apartment from west at north
Feb 19, 2026 · Apt B12
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b7, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt B7
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c1, 3rd story, 1st apartment from west at north , section ''b'', 1st from north at east
Feb 19, 2026 · Apt C1
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a3, 1st story, 3rd apartment from east at south
Feb 19, 2026 · Apt A3
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a2, 1st story, 2nd apartment from east at south
Feb 19, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Dec 15, 2025 · Apt C2
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Dec 15, 2025 · Apt C2
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt d2, 4th story, 2nd apartment from south at west
Aug 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, east wall in the foyer located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the 1st room from north at west located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at west wall in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt d2, 4th story, 2nd apartment from south at west
Jun 27, 2025 · Apt D2
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of disconnected cast iron radiators free standing on the floor, at public hall, 1st story, section ''west''
May 6, 2024
Closed — Violation closed - BHazardous
Replace with new the missing vestibule door at public hall, 1st story, section ''west''
May 6, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of disconnected cast iron radators free standing on the floor, in the rear west sections, at public hall, 1st story
Apr 29, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of air conditioner, empty water fountain bottoms, baby carriages on the floor ,throughout at public hall, 1st story
Apr 29, 2024
Closed — Violation closed - BHazardous
Replace with new the missing vestibule doors at public hall, 1st story
Apr 29, 2024
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [vestibule doors] at the door frame at public hall
Dec 8, 2023
Open — False certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set] at the building entrance 1st from east at south, at public hall
Dec 8, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Dec 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 8, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 1st story
Nov 12, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing refrigerator at public hall, 1st story
Nov 12, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead to roof.
Sep 16, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling
Sep 16, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective firererardant plaster at ceiling
Sep 16, 2022
Closed — Violation dismissed
DOB building violations · 5
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Construction other optional
Work w/out permit
May 11, 2009
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 5
- Class - 3
Failure to maintain bldg in code compliant manner(work w/o a permit)sidewalk curb at front of property(right side)cut so that portion of sidewalk is lowered enabling a vehicle to drive unto on illegal off stree
Jul 10, 2018
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or bldg dept records. noted: 3 apts in created in cellar w/kitchens bathrooms,bedrooms,w.o asecond means of egress. remedy: discontinue illegal use.
May 11, 2009 · Penalty $2,400
Active - Class - 1
Work w.o permit. noted: creating partitions to arrange 3 apts in cellar work including new bathrooms,kitchens,bedrooms. work 100% completed.remedy: obtain permit or restore premises to prior legal condition.
May 11, 2009
Resolve - Non-hazardous
Work without a permit one bedroom constructed in cellar under apt.a3 alt. 1269/88 not approved. remedy:obtain permit or restore to prior legal condition.
Jul 29, 1993 · Penalty $1,000
Active - Non-hazardous
Occupancy contrary to that allowed by the cofo#41520 one bedroom occupied in cellar in conjuction of apt.3a. remedy:amend cofo or discontinue illegal use.
Jul 29, 1993 · Penalty $1,000
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 29, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Safety
Window guard broken/missing
Dec 3, 2025 · Apt C2
Close - Unsanitary condition
Mold
Dec 3, 2025 · Apt C2
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt 3E
Close - Electric
Power outage
Jun 26, 2025 · Apt D2
Close - General
Ventilation system
Jun 26, 2025 · Apt D2
Close - Unsanitary condition
Pests
Apr 21, 2024 · Apt A6
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 14, 2023 · Apt D11
Close - Plumbing
Bathtub/shower
May 13, 2023 · Apt APTA8
Close - Plumbing
Bathtub/shower
May 13, 2023 · Apt APTA8
Close - Plumbing
Basin/sink
May 13, 2023 · Apt APTA8
Close - General
Bell/buzzer/intercom
Jan 8, 2023 · Apt D6
Close - Heat/hot water
Entire building
Nov 9, 2022 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 15, 2022 · Apt D11
Close - Unsanitary condition
Mold
Sep 15, 2022 · Apt D11
Close - Paint/plaster
Ceiling
Sep 15, 2022 · Apt D12
Close - Electric
Lighting
Sep 15, 2022 · Apt D12
Close - Heat/hot water
Entire building
May 22, 2022 · Apt BLDG
Close - General
Cabinet
Mar 29, 2022 · Apt A3
Close - Unsanitary condition
Pests
Mar 29, 2022 · Apt A3
Close - Electric
Power outage
Jul 19, 2021 · Apt B2
Close - Plumbing
Bathtub/shower
Apr 30, 2021 · Apt B10
Close - Unsanitary condition
Sewage
Apr 30, 2021 · Apt B10
Close - Unsanitary condition
Pests
Apr 9, 2021 · Apt ENTIRE
Close - Unsanitary condition
Pests
Mar 19, 2021 · Apt D9
Close - Unsanitary condition
Pests
Mar 9, 2021 · Apt D9
Close - Safety
Fire escape
Aug 10, 2020 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 11, 2020 · Apt A2
Close - Safety
Smoke detector
Dec 19, 2018 · Apt A2
Close - Door/window
Door
Dec 19, 2018 · Apt A2
Close - Safety
Window guard broken/missing
Dec 19, 2018 · Apt A2
Close - Water leak
Damp spot
Dec 19, 2018 · Apt A2
Close - Flooring/stairs
Floor
Dec 19, 2018 · Apt A2
Close - Safety
Carbon monoxide detector
Dec 19, 2018 · Apt A2
Close - Door/window
Window frame
Dec 19, 2018 · Apt A2
Close - Heat/hot water
Entire building
Oct 14, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2018 · Apt D3
Close - Plumbing
Basin/sink
Sep 1, 2018 · Apt D6
Close - Heat/hot water
Apartment only
Mar 18, 2018 · Apt A8
Close - Heat/hot water
Entire building
Mar 16, 2018 · Apt A9
Close - Heat/hot water
Entire building
Dec 16, 2017 · Apt BLDG
Close - Electric
Wiring
Jul 20, 2017 · Apt D3
Close - Electric
Power outage
Jul 20, 2017 · Apt D3
Close - Water leak
Slow leak
Nov 7, 2016 · Apt C9
Close - Paint/plaster
Ceiling
Nov 7, 2016 · Apt C9
Close - Plumbing
Basin/sink
Nov 7, 2016 · Apt C9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 4
- Residential units
- 46
- Building area
- 38,000 ft²
- Lot area
- 11,367 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 38
- Block / lot
- 5729 / 30
- Assessed value
- $982,800
- Landmark / historic district
- No
HPD registration #300443, last renewed Sep 15, 2025.
Questions about 6204 Ft Hamilton Parkway
Who owns 6204 Ft Hamilton Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Lidia Malaki LLC.
Does 6204 Ft Hamilton Parkway have violations?
Yes. NYC HPD has recorded 263 housing violations at this property.
Is 6204 Ft Hamilton Parkway rent stabilized?
NYC Department of Finance tax bills listed 46 rent-stabilized units here in 2024 (about 100% of its 46 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 6204 Ft Hamilton Parkway built?
City records list 1926 as the year it was built.
How many apartments are in 6204 Ft Hamilton Parkway?
It has 46 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.