850 50 Street
Brooklyn, NY 11220BBL 3-05644-0027Map
Owner of record: Platinum 850 INC.
850 50 Street is a walk-up apartment building built in 1931 in Brooklyn, 11220. It has 16 residential units across 4 floors. The owner of record is Platinum 850 INC.. HPD has recorded 52 housing violations here, most recently on May 1, 2026. 3 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 52
- DOB violations
- 1
- ECB violations
- 4
- HPD complaints
- 92
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 52
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at public hall, 1st story
May 9, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at public hall stairs, 1st story
May 9, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at public hall stairs, 2nd story
May 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and latch at bulkhead door to roof at public hall, 4th story
Apr 19, 2024
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Apr 19, 2024 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Dec 30, 2022
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south located at apt 2a, 2nd story, 1st apartment from west at north
May 16, 2022 · Apt 2A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north, west and south walls, approximately 1 sq ft. in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
May 6, 2022 · Apt 2A
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 4th story, balcony stack at front of building
May 6, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
May 6, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at public hall bulkhead leading to roof
May 6, 2022
Closed — Violation closed - BHazardous
Remove the illegal fastening padlockable slidebolt at public hall bulkhead door leading to roof
May 6, 2022
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2a, 2nd story, 1st apartment from west at north
May 6, 2022 · Apt 2A
Open — Violation will be reinspected - BHazardous
Repair or replace the smoke detector defective located at apt 2a, 2nd story, 1st apartment from west at north
May 6, 2022 · Apt 2A
Open — Violation will be reinspected - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 4, 2020
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of slide bolt arranged to be locked at roof bulkhead door public hall
Sep 4, 2020
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors at roof bulkhead public hall
Sep 4, 2020
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 2a, 2nd story, 1st apartment from north at east
Sep 4, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable located at apt 2a, 2nd story, 1st apartment from north at east
Sep 4, 2020 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and west wall roof bulkhead public hall
Apr 1, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling and west wall roof bulkhead public hall
Apr 1, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall stairs, 3rd story
Feb 10, 2020
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant ceiling and north wall, at public hall stairs, 3rd story
Feb 10, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall, at public hall roof bulkhead
Feb 10, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling and north wall, at public hall roof bulkhead
Feb 10, 2020
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective wire glass pane lower sash window intermediate landing at public hall stairs, 1st story
Nov 4, 2019
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from east, 2nd story
Jul 20, 2018
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner at 1st fire escape from east, 3rd story
Jul 20, 2018
Closed — Violation dismissed - BHazardous
Code: arrange and make self-closing the doors entrance located at apt 2b, 2nd story, 1st apartment from east at south
Mar 28, 2018 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Jan 3, 2018 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system doors locked at boiler room at boiler room
Jan 3, 2018
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electomagnetic locking device installed at vestibule door to at public hall, 1st story
Feb 18, 2016
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st story
Feb 18, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 15, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of refridgerator, (with doors still on ) at public hall, 1st story
Feb 27, 2014
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east wall aprox = 8 sq ft in the 2nd room from north located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Replace with new the missing wood door at closet south wall in the 1st room from north located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls , ceiling , trim in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Open — First no access to re- inspect violation - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall aprox = 6 sq ft in the 1st room from north located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance lower sash window at east wall in the kitchen located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Mar 29, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 4b, 4th story, apartment at north
Mar 25, 2011 · Apt 4B
Closed — Violation closed - BHazardous
Replace with new the broken or defective spring at window in the kitchen located at apt 4b, 4th story
May 26, 2010 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story
Feb 13, 2010
Closed — Violation closed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to maintain buiding in code compliant manner at time of inspection observed at rear roof at 850 50 street an electrical pully set up on top fire escape this make shift pully is impeeding the use of the
May 21, 2020 · Penalty $1,250
Resolve - Class - 2
Bc28-301.1/.failure to provide ventilation to gas meter room per p115.6(1968 code)fgc appendix e (eu)(2014 code)noted:at gas meter room,there is no fresh air ventilation.rem:comply with notice of violation.
Jul 24, 2017
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at electrical room illegal storage of ceramic tiles,metal ducts,wood strips,paint cans,security gates,ad sign,copper pipes,shovel,bx cable roll,boxes
Jul 24, 2017
Resolve - Class - 2
27-968(a)(3) interior fire alarm must be installed throughout entire bldg for alt i job #310135984 noted at time of insp alarm system only installed at cellar lvl of which is to be used as a day care facility s
Apr 14, 2009
Resolve
Complaints
- Safety
Window guard broken/missing
May 8, 2024 · Apt BLDG
Close - Safety
Window guard broken/missing
Apr 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2019 · Apt 3A
Close - Heat/hot water
Entire building
Dec 29, 2017 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 16, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Feb 13, 2016 · Apt 4B
Close - Heat/hot water
Entire building
Jan 27, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Jan 13, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Nov 15, 2015 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 14, 2015 · Apt 3C
Close - Heat/hot water
Entire building
Jan 14, 2015 · Apt 3C
Close - Heat/hot water
Entire building
Jan 9, 2015 · Apt 3C
Close - Heat/hot water
Entire building
Nov 21, 2014 · Apt 3C
Close - Heat/hot water
Entire building
Oct 25, 2014 · Apt 3C
Close - Heat/hot water
Entire building
Mar 26, 2014 · Apt 3C
Close - Heat/hot water
Entire building
Mar 17, 2014 · Apt 3C
Close - Heat/hot water
Entire building
Mar 17, 2014 · Apt 3C
Close - Heating
Heat related
Feb 14, 2014 · Apt NA
Close - Heating
Heat related
Feb 14, 2014 · Apt 4C
Close - Heating
Heat related
Feb 14, 2014 · Apt APT3
Close - Heating
Heat related
Jan 31, 2014 · Apt NA
Close - Heating
Heat related
Dec 13, 2013 · Apt 4B
Close - Heating
Heat related
Nov 13, 2013 · Apt 4C
Close - Heating
Heat related
Nov 13, 2013 · Apt 4B
Close - Heating
Heat related
Nov 13, 2013 · Apt 4B
Close - Paint/plaster
Ceiling
Mar 23, 2011 · Apt 4B
Close - Paint/plaster
Wall
Mar 23, 2011 · Apt 4B
Close - Plumbing
Toilet
Mar 23, 2011 · Apt 4B
Close - General
Mold
Mar 23, 2011 · Apt 4B
Close - General
Windows
Mar 23, 2011 · Apt 4B
Close - Nonconst
Vermin
Mar 23, 2011 · Apt 4B
Close - Nonconst
Vermin
Mar 23, 2011 · Apt 4B
Close - General
Doors
Mar 23, 2011 · Apt 4B
Close - Heating
Heat related
Dec 27, 2010 · Apt 4B
Close - Heating
Heat related
Dec 16, 2010 · Apt 3C
Close - Electric
Wiring
Jul 27, 2010 · Apt 4C
Close - Electric
Wiring
Jul 27, 2010 · Apt 4C
Close - Electric
Electric-supply
Jul 27, 2010 · Apt 4B
Close - Electric
Bell-buzzer/intercom
Feb 8, 2010 · Apt 4B
Close - Appliance
Electric/gas range
Dec 24, 2009 · Apt 4B
Close - Nonconst
Vermin
Dec 24, 2009 · Apt 4B
Close - Plumbing
Water-leaks
Dec 24, 2009 · Apt 4B
Close - Plumbing
Basin/sink
Dec 24, 2009 · Apt 4B
Close - Appliance
Refrigerator
Dec 24, 2009 · Apt 4B
Close - Heating
Heat related
Dec 1, 2009 · Apt 4B
Close - Appliance
Electric/gas range
Dec 1, 2009 · Apt 4B
Close - Appliance
Refrigerator
Dec 1, 2009 · Apt 4B
Close - Plumbing
Water supply
Apr 2, 2009 · Apt 3C
Close - Heating
Heat related
Mar 3, 2009 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1931
- Floors
- 4
- Residential units
- 16
- Building area
- 14,080 ft²
- Lot area
- 4,400 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 43
- Block / lot
- 5644 / 27
- Assessed value
- $683,100
- Landmark / historic district
- No
HPD registration #300639, last renewed Aug 8, 2025.
Questions about 850 50 Street
Who owns 850 50 Street?
The owner of record in NYC Department of City Planning PLUTO data is Platinum 850 INC..
Does 850 50 Street have violations?
Yes. NYC HPD has recorded 52 housing violations at this property.
Is 850 50 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 56% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 850 50 Street built?
City records list 1931 as the year it was built.
How many apartments are in 850 50 Street?
It has 16 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.