1207 49 Street
Brooklyn, NY 11219BBL 3-05634-0001Map
Owner of record: 1207 49th St Holdings LLC
1207 49 Street is a walk-up apartment building built in 1923 in Brooklyn, 11219. It has 35 residential units across 4 floors. The owner of record is 1207 49th St Holdings LLC. HPD has recorded 138 housing violations here, most recently on October 16, 2026. 46 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 138
- DOB violations
- 6
- ECB violations
- 16
- HPD complaints
- 154
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 138
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Oct 16, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material, plaster at ceiling at public hall, 1st story
Oct 16, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 13, 2026
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the ceiling at public hall, 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household appliances, refrigerator with no doors at public hall, 2nd story
Oct 13, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Aug 29, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Aug 29, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of boxes, boards, ladder, carts, cabinets at public hall, 2nd story
Aug 29, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and south walls and ceiling in the bathroom located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 20 sq ft observed at east and south walls in the bathroom located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 4th room from east at north located at apt d3, 4th story, 1st apartment from south at west
Aug 29, 2026 · Apt D3
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of strollers, bicycles at public hall, 1st story
Aug 29, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective glass at lower window sash at west wall in the kitchen located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling through in the entire apartment located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at west wall in the 2nd room from north located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from north located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt d7, 4th story, 1st apartment from west at north
Aug 14, 2026 · Apt D7
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Feb 7, 2024 · Apt C3
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Feb 7, 2024 · Apt C3
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Aug 10, 2023
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of iron ladders and house hold items obstucting egress to fire passageway at center court yard
Aug 10, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at south stack rear of the building at fire escape, 3rd story
Apr 28, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west stack building front at fire escape, 2nd story
Apr 28, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective landing to the north yard at public hall, 1st story
Apr 28, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction materal at public hall, 1st story
Apr 28, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the foyer located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling, at bulkhead , section ''northsecti''
Nov 18, 2022
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bathtub in the bathroom located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the kitchen located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 2nd riser from north at east wall, 1st riser from north at east wall in the kitchen located at apt d9, 4th story, 2nd apartment from north at east
Nov 18, 2022 · Apt D9
Open — Nov sent out
DOB building violations · 6
- Construction other optional
Ecb hazardous
Aug 29, 2001
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: having constructed partition walls in cellar creating rooms with 1 kitchen with gas stove kitchen use in conjunction with chappuccino on 1st floor. remedy: obtain a permit if feasible or restore premises prior legal condition
Aug 29, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Sep 22, 1997
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 16
- Class - 2
For alt ii job#320147355 04/06/10 noted 1st fl n westerly side 12th ave one story extension onto sidewalk ktcn area enlargement w/ hvac uniton roof 2nd exhaust vent terminating above roofline awnings roll down
Apr 7, 2011 · Penalty $500
Resolve - Hazardous
Failure to comply with dob commissioner's order.nov#34485908 issued on 7/26/05 for installing 2 walk in boxes,sinks,a/c unit & kitchen ex haust vent pipe leading to roof w/o a permit.all work & items still
Dec 14, 2006 · Penalty $1,500
Resolve - Hazardous
Occupancy contrary to c of o & dob records.note:c of o #24590 & aka address 1201 to 1211 49 st c of o #160566 does not allow for commercial use on ground fl or cellar levels.9 retail/comm established plus
Dec 14, 2006 · Penalty $800
Resolve - Hazardous
Work w/o a permit-work completed-noted:having created a working restaurant in a residential bldg(r6 district)with complete kitchen.gas firedburners,electric,water & waste lines.2-1/2 bathrooms, 2 sinks outside
Dec 14, 2006 · Penalty $800
Resolve - Non-hazardous
Illegal use in a residential district.bldg located in an r6 zone.9 re tail commercial establishments & a full working restaurant located on the ground fl of the bldg w/restaurant using part of cellar for additi
Dec 14, 2006 · Penalty $460
Resolve - Hazardous
No access rest. closed. violation written based upon no rec ords of corrections for ecb #34485908j. for work w/o a permit for ac unit at rear.walk in boxes w/sinks,18"vent piping on 12 ave from kitche
Jun 24, 2006 · Penalty $5,000
Resolve - Hazardous
Work without a permit noted at orchidenrest at cellar (1) installed 2 walk in boxes work sinks (2) at rear a/c unit (3) at front on 12 ave 18' vent pipe from kitchen to roof remedy:obtain permit
Jul 26, 2005 · Penalty $800
Resolve - Hazardous
Occupancy contrary to that allowed by certificate of occupancy # 245902/29/24 does not show commercial use on 1st (ground) floor.at 1st floor restaurant,commercial stores.remedy:discontinue illegal use or amend
Jul 26, 2005 · Penalty $800
Resolve - Non-hazardous
Work with out a permit noted (1) front entrance has been closed a store (silver art inc)is in place of entrnace (2) main entrance is now on east side of bldg (3) block bldg in court yard aprpox 15ft long x 20
Sep 16, 2004 · Penalty $250
Resolve - Hazardous
Occupancy contrary to that allowed by the builing department records. in that kitchen constracted in cellar with gas stove also partition walls constructed. rooms kitchen in cellar used in conjunction with chof
Aug 29, 2001
Resolve
Show 6 more ↓
- Non-hazardous
Work without a permit. work noted; having constructed partition walls in cellar creating rooms with 1 kitchen with gas stove, kitchen use inconjuction with chappuccino on 1 st fl. remedy; obtain a permit if fea
Aug 29, 2001
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occuoancy a valid certificate of occupancy. noted: alt 366/98 for alt of commercial stores. remedy; obtain c of o
Jan 14, 2000
Resolve - Non-hazardous
Failure to to maintain exterior building wall. open mortar joints of brick work and vertical cracks at south west side of building from fourth floor to roof area. remedy: make all necessary repairs to areas
Nov 6, 1998 · Penalty $180
Resolve - Non-hazardous
Work without a permit. work noted: having erected walls in cellar to create a mosque. also 3 toilets installed & a ritual fountain. and adrop ceiling in mosque. remedy: obtain a permit or remove all work.
Sep 22, 1997
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy,alt336/98 foralt of commercial stores. remedy obtain a valid certificate of occupancy for new use.
Jun 22, 1994 · Penalty $350
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy alteration 366/90 for construction of ten commercial stores/offices has been completed. three stores are illegally occupied without a valid cer
Jul 19, 1991 · Penalty $1,000
Resolve
Complaints
- Paint/plaster
Ceiling
Oct 7, 2026 · Apt B1
Close - Appliance
Electric/gas range
Aug 27, 2026 · Apt D3
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt D7
Close - Appliance
Electric/gas range
Jul 30, 2026 · Apt D7
Close - Flooring/stairs
Floor
Jul 30, 2026 · Apt D7
Close - Water leak
Damp spot
Jul 30, 2026 · Apt D7
Close - Door/window
Window frame
Jul 30, 2026 · Apt D7
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt D7
Close - Plumbing
Water supply
Jul 30, 2026 · Apt D7
Close - Appliance
Electric/gas range
Jan 13, 2026 · Apt D3
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 6, 2024 · Apt BLDG
Close - Appliance
Refrigerator
Sep 19, 2023 · Apt D5
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt D9
Close - Heat/hot water
Entire building
Nov 11, 2022 · Apt D9
Close - General
Bell/buzzer/intercom
Nov 11, 2022 · Apt D9
Close - General
Bell/buzzer/intercom
Oct 18, 2022 · Apt D9
Close - Heat/hot water
Entire building
Oct 18, 2022 · Apt D9
Close - Heat/hot water
Entire building
Feb 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt D9
Close - Heat/hot water
Entire building
Dec 9, 2021 · Apt BLDG
Close - Plumbing
Bathtub/shower
Dec 7, 2021 · Apt D9
Close - Plumbing
Bathtub/shower
Dec 7, 2021 · Apt D9
Close - Heat/hot water
Entire building
Dec 7, 2021 · Apt D9
Close - Heat/hot water
Entire building
Dec 1, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 24, 2021 · Apt 2
Close - Heat/hot water
Entire building
Nov 24, 2021 · Apt D9
Close - Heat/hot water
Apartment only
Nov 23, 2021 · Apt D5
Close - Heat/hot water
Apartment only
Nov 22, 2021 · Apt D9
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt D9
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt D9
Close - Heat/hot water
Entire building
Feb 7, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2021 · Apt D7
Close - Heat/hot water
Apartment only
Dec 16, 2020 · Apt D9
Close - Water leak
Damp spot
Dec 16, 2020 · Apt D9
Close - Heat/hot water
Entire building
Dec 3, 2020 · Apt D4
Close - Door/window
Window frame
Nov 17, 2020 · Apt D4
Close - Heat/hot water
Entire building
Nov 17, 2020 · Apt D4
Close - Heat/hot water
Entire building
Nov 13, 2020 · Apt D1
Close - Heat/hot water
Apartment only
Nov 2, 2020 · Apt D5
Close - Heat/hot water
Entire building
Feb 13, 2020 · Apt D9
Close - Heat/hot water
Entire building
Feb 8, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2020 · Apt D6
Close - Heat/hot water
Entire building
Jan 30, 2020 · Apt D10
Close - Heat/hot water
Entire building
Jan 27, 2020 · Apt A10
Close - Heat/hot water
Apartment only
Jan 20, 2020 · Apt D2
Close - Heat/hot water
Apartment only
Jan 17, 2020 · Apt D5
Close - Heat/hot water
Entire building
Jan 15, 2020 · Apt D7
Close - Heat/hot water
Entire building
Jan 14, 2020 · Apt A10
Close - Heat/hot water
Entire building
Jan 9, 2020 · Apt D6
Close - Heat/hot water
Entire building
Jan 7, 2020 · Apt D10
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1923
- Floors
- 4
- Residential units
- 35
- Building area
- 30,695 ft²
- Lot area
- 10,000 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 44
- Block / lot
- 5634 / 1
- Assessed value
- $2,129,850
- Landmark / historic district
- No
HPD registration #337360, last renewed Aug 11, 2025.
Questions about 1207 49 Street
Who owns 1207 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1207 49th St Holdings LLC.
Does 1207 49 Street have violations?
Yes. NYC HPD has recorded 138 housing violations at this property.
Is 1207 49 Street rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 100% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1207 49 Street built?
City records list 1923 as the year it was built.
How many apartments are in 1207 49 Street?
It has 35 residential units and 44 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.